MVTX Tracking Workfest Goals https indico bnl govevent5404
MVTX & Tracking Workfest Goals https: //indico. bnl. gov/event/5404/ • MVTX project • MVTX tracking • Updated MVTX project plan • Physics update • MVTX/INTT integration and optimization • • • s. PHENIX integration, MVTX/INTT • Production plan • Discuss and update institution roles • Tasks, resources and schedules • 2/3 -layer INTT Update tracking software Primary vertex, DCA Pileup effects B-tagging • Physics study • Update money plots • New topics Complete a preliminary cost & schedule in January 2019 • Distribute funding for design work and production 12/5/18 MVTX & Tracking Workfest @FSU 1
Rooms Wednesday Dec 5: - MVTX in room 319 Keen - up to 16 people (10 people at table) - Tracking in room 202 Keen - up to 12 people (10 at table) Saturday and Sunday: - MVTX in 701 Keen - lots of seats! - Tracking in 202 Keen - up to 12 people 12/5/18 MVTX & Tracking Workfest @FSU 2
backup 12/5/18 MVTX & Tracking Workfest @FSU 3
MVTX & Tracking Workfest at FUS, 12/5, 8 -9 • Update project cost & schedule • Discuss and update institution roles • Tasks, resources and schedules • Improve MVTX related tracking and analysis • Decision regarding number of layers of the INTT during the collaboration meeting • Update tracking software • Update physics plots 12/5/18 MVTX & Tracking Workfest @FSU 4
MVTX Task List & Institution Roles (I) Sensors and Electronics Mechanical system • Detector mechanical frame design and fabrication • RU production and QA • Carbon • non-composite structure • QA at UT-Austin • Stave production and QA at CERN • Detector assembly at LBNL • Service barrel frame design and fabrication • Global mechanical integration • Stave acceptance test • Assembly • QA • Cable test & QA • Signal and control • Power • Readout and control integration • Power system • FELIX production • s. PHENIX readout integration • Electronics system control and monitoring • Slow control and monitoring, safety system interlock etc. • Power unit • CAEN PS • Control & monitor • Cooling system • Power system • Sensors and electronics 12/5/18 MVTX & Tracking Workfest @FSU 5
MVTX Task List & Institution Roles (2) Detector & Physics simulations Detector commissioning at BNL • Detector geometry & response simulations • Vertexing & DCA • B-hadron Physics simulation and analysis • B-jet Physics simulations and analysis • Other physics topics • Setup MVTX lab at BNL • Readout & cooling • Half detector lab commissioning • Installation • Services – power, cables • Detector • Correlation • Explore open HF trigger for pp and p. A • And more. . . 12/5/18 MVTX & Tracking Workfest @FSU 6
Tracking Topics • • Tracking simulation overview MVTX detector geometry and response Primary and 2 nd vertex finding, 2 -layer INTT + MVTX, DCA, - Sookhyun, Sanghoon Event pileup in pp/p. A collisions -Sanghoon HF tagging, b-jet, B-hadron in pp, AA New ideas, physics update - Jin, Xin et al Explore open HF trigger for pp and p. A - Jin, Ming et al • Discussion of to-do list for detector simulation and b-tagging - all • Update physics plots with 2(or 3)-layer INTT + MVTX • 12/5/18 MVTX & Tracking Workfest @FSU 7