MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12

MSW management in Seville and its surrounding area IPPC Implementation Experience Seville June 12 th 2012 1

Contents Ø Presentation of the group § Firms belonging to the group § History

Contents Ø Presentation of the group § Firms belonging to the group § History Ø Aborgase § § Activities Installations Complex of Montemarta Cónica IPPC implementation Ø Other firms of the group § Edifesa § Tegner § Energía sur de Europa Ø Conclusions Ø Contact information 2

IPPC implementation process presentation 1. 2. 3. 4. 5. IPPC certification process summary Overview

IPPC implementation process presentation 1. 2. 3. 4. 5. IPPC certification process summary Overview of facilities Audit Results Actions carried out after audit Mayor impacts of implementing the standard 3

1 - IPPC Certification Process The administration The company Development of process description report

1 - IPPC Certification Process The administration The company Development of process description report Correction of ”easily” corrigible issues May’ 05 Nov’ 05 Discussion and agreement on final process description report Oct’ 07 Initial Integrated Environmental Permit granting Apr’ 08 Carried out audit Autum’ 08 Jul’ 09 Proposal of plant modification project Accomplishment of plant modification project Approved extension of Permit Mar’ 10 Apr’ 11 Fulfillment of all IEP requirements 4

2 - Facilities Covered under IPPC Permit – Montemarta Environmental Complex 4 Compost processing

2 - Facilities Covered under IPPC Permit – Montemarta Environmental Complex 4 Compost processing MSW Processing 5 3 Compost aging area Fermentation wharehouse 6 Metal recycling plant Plastic recycling plant 2 1 Gross MSW processing Weight bridge 5

2 - Facilities Covered under IPPC Permit – Montemarta Environmental Complex Closed areas 2

2 - Facilities Covered under IPPC Permit – Montemarta Environmental Complex Closed areas 2 Gas field 5 1 Leachate treatment plants Active landfill 4 Leachate pool 3 Landfill gas power plant Landfill 6

2 - Facilities Covered under IPPC Permit – Montemarta Environmental Complex Other waste 3

2 - Facilities Covered under IPPC Permit – Montemarta Environmental Complex Other waste 3 Construction and demolition plant 2 1 Hospital waste plant Recycle plant 7

ü Carried out on April 2008 ü Implemented according to IPPC standard ü Verified

ü Carried out on April 2008 ü Implemented according to IPPC standard ü Verified 164 issues Classification according to 3 - Audit Results ü 134 in order ü 30 no conformities Nature ü Procedure ü Technical ü Documents ü Immediate accomplishment Corrective measure ü Clarification required ü Immediate corrective action ü Beyond Aborgase scope 30 25 134 20 7 Immeditate accomplsihment 9 Documents 6 7 15 30 30 No conformities 10 11 Tecnical 17 Beyond Aborgase scope Immediate corrective action Clarification required 5 0 3 According to nature Procedures According to corrective measure 8

Clarification required 3 - Audit Results Solution beyond Aborgase scope Immediate solution 1 Clinical

Clarification required 3 - Audit Results Solution beyond Aborgase scope Immediate solution 1 Clinical Waste (RBS) admission procedure 2 Documented control plan 3 Risk assessment for MA by ECCM 4 Maintenance and Cleaning Plan 5 Recovery of potentially recoverable fractions 6 Previous treatment of green waste (PARK and GARDENS) , landfilling treatment procedure during technical shutdowns and weekends 7 Landfilling of potentially recoverable fractions 8 Basic characterization analysis clinical waste (RBS) 9 Temporary storage area for no admissible waste 10 Open air storage of recovered fractions, including compost 11 Green waste is neither ground nor composted 12 Clinic waste piling above 2 levels 13 Clinic waste labeling 14 Editing of landfill incidents book 15 Neither segregation nor storage of WEEE (waste electrical and electronic equipment) 16 Open containers of Hazardous Waste 17 Hazardous waste labeling 18 19 Hazardous Waste area signaling Used oil storage without dike 20 There is neither specific HW loading area, nor draining in the HW storing area 21 PTL and engines emission points conditioning 22 Leachate collection wells in closed and active landfill bodies 23 Untreated clinic and HW leachate and cleaning water 24 Compost and recovered fraction open air storage 25 Meteorological data recording 26 Leachate analytics parameters 27 Autoclave monitoring results report 28 No previously treated waste landfilled report 29 Report of landfilled waste with no previous treatment 30 Summary of 2007 control plan 9

4 - Immediate solution (I) No conformities Improvement Action Implications Basic characterization analysis clinical

4 - Immediate solution (I) No conformities Improvement Action Implications Basic characterization analysis clinical waste (RBS) Presented a suitability certificate of analytical operations proposed in standards used for this kind of waste Increase in the current number of records and work procedures 9 Temporary storage area for no admissible waste Justified the refuse of non admissible waste according to procedure describe in NC 1 Increase in controls 12 Clinic waste piling above 2 levels According to containers homologation, they can be piled due to piling, resistance and sealing tests Continue with the same working practice (no implication) 13 Clinic waste labeling Improvements in the HW signaling Slight improvement in the work procedure. HW area adaptation 8 12 13 10

4 - Immediate solution (II) No conformities Improvement Action Implications Neither segregation nor storage

4 - Immediate solution (II) No conformities Improvement Action Implications Neither segregation nor storage of WEEE Studied commonly with IMS WEEE the option of sending material. The option is rejected due to the bad condition of the waste Stored and sent just the potentially reused material (< 10 t/y) 22 Leachate collection wells in closed and active landfill bodies The first leachate accumulation is detected in 2011. Installed a pneumatic system in order to pump it out Continue with the same working procedure. NO IMPLICATION 23 Untreated clinic and HW leachate and cleaning water Analyzed waste water and discharged to public sewage system is considered Continue with the same working procedure. NO IPMLICATION 15 22 11

4 - Clarification required (I) No conformities Improvement Action Implications 1 Clinical Waste (RBS)

4 - Clarification required (I) No conformities Improvement Action Implications 1 Clinical Waste (RBS) admission procedure Development of an specific procedure for the clinic waste admission and acceptance Increase in controls 2 Documented Environmental Impacts control plan Risk assessment for MA by ECCM Maintenance and Cleaning Plan Adapted the existing control plan to the IPPC EIA requirements Increase in controls Presented Risk Evaluation to the ECCMA Increase in controls Developed a maintenance and cleaning program according to specifications Increase in current working procedure records 3 4 12

4 - Clarification required (II) 14 16 17 18 19 20 No conformities Improvement

4 - Clarification required (II) 14 16 17 18 19 20 No conformities Improvement Action Implications Editing of landfill incidents book Open containers of Hazardous Waste Hazardous waste labeling Incident book is edited, including use instructions and custody responsible Increase in controls Hazardous Waste area signaling Used oil storage without dike There is neither specific HW loading area, nor draining in the HW storing area General improvement of the loading area; adapting tanks, and properly signaling and labeling Increase in controls 16 -20 13

4 - Clarification required (III) 25/26 27 28 No conformities Improvement Action Implications Meteorological

4 - Clarification required (III) 25/26 27 28 No conformities Improvement Action Implications Meteorological data recording Created a record with meteorological parameters obtained from the closest National Network of Meteorological Stations Increase control and records Leachate analytics parameters Autoclave monitoring results report Increase of numbers of characterized parameters Increase controls and records Report with the result of parameters monitoring control in the autoclave (P, T, time) sent yearly to Environmental Authority Increase in controls and records 28 25 9 kms 14

4 - Clarification required (IV) No conformities Improvement Action Implications 29 Report of landfilled

4 - Clarification required (IV) No conformities Improvement Action Implications 29 Report of landfilled waste with no previous treatment Yearly report recording waste landfilled no previous treatment Increase in controls 30 Summary of 2007 Control Plan Report with results of sanitary data control to be sent to Environmental Authority Increase in controls 15

4 - Solution beyond Aborgase (I) 5 6 7 No conformities Actions Implications Recovery

4 - Solution beyond Aborgase (I) 5 6 7 No conformities Actions Implications Recovery of potentially recoverable fractions Designed a plant for bulky waste treatment Presented to local association a cost assessment in order to increase tipping fee Constructed the first phase of the bulky waste treatment plant Designed a bulky waste treatment plant Constructed the first phase of the bulky waste treatment plant Desigend a revamping of MSW recycling plant, with 5 authomatized sorting lines, aimed at increasing capacit up to maximum After several modifications, increase manual sorting lines and optimized feeding and organic fraction refining processes Previous treatment of green waste, landfilling treatment procedure during technical shutdowns and weekends Landfilling of potentially recoverable fractions No increase in tipping fee 5 16

4 - Solution beyond Aborgase (II) 10 No conformities Actions Implications Open air storage

4 - Solution beyond Aborgase (II) 10 No conformities Actions Implications Open air storage of recovered fractions, including compost Cost study of covering the area carried out Proposed by ABORGASE, expanded plastic treatment warehouse No coverage in the rest of storage areas 11 24 Green waste is neither ground nor composted Designed a Bulky Waste treatment plant, with a front grinder for green waste (previous to composting) Grinder in included in second phase, which was not finally accomplished Compost and recovered fraction open air storage Carried out cost assessment of covering all the required areas Proposed by ABORGASE, expanded plastic treatment warehouse No coverage in the rest of storage areas 24 10 17

4 - Audit Results 1 Clinical Waste (RBS) admission procedure done 2 Documented control

4 - Audit Results 1 Clinical Waste (RBS) admission procedure done 2 Documented control plan 3 Risk assessment for MA by ECCMm done 4 Maintenance and Cleaning Plan done 5 Recovery of potentially recoverable fractions 6 Previous treatment of green waste , landfilling treatment procedure during technical shutdowns and weekends 7 Landfilling of potentially recoverable fractions done 8 Basic characterization analysis clinical waste (RBS) done 9 Temporary storage area for no admissible waste 10 Open air storage of recovered fractions, including compost done Partially 11 Green waste is neither ground nor composted Partially 12 Clinic waste piling above 2 levels done 13 Clinic waste labeling done 14 Editing of landfill incidents book done 15 Neither segregation nor storage of WEEE (waste electrical and electronic equipment) done 16 Open containers of Hazardous Waste done 17 Hazardous waste labeling done 18 Hazardous Waste area signaling done 19 Used oil storage without dike 20 There is neither specific HW loading area, nor draining in the HW storing area done 21 PTL and engines emission points conditioning done 22 Leachate collection wells in closed and active landfill bodies done 23 Untreated clinic and HW leachate and cleaning water 24 Compost and recovered fraction open air storage 25 Meteorological data recording done 26 Leachate analytics parameters 27 Autoclave monitoring results report done 28 No previously treated waste landfilled report done 29 Report of landfilled waste with no previous treatment done 30 Summary of 2007 control plan All no conformities found were finally corrected, except 3 whose solution exceeded ABORGASE scope; but were partially solved done Partially done 18

5 - Major impacts - Operation and Investments Operation Costs Processing cots increases due

5 - Major impacts - Operation and Investments Operation Costs Processing cots increases due to the necessity of processing 100% of waste and fostering by-products recovery +12% Landfill adaptation costs Expend costs for adapting landfills to national legislation during 2011 - 2018 6, 4 M€ Infrastructure Environmental controls General high increase in the level of control and recording, which will be expend during the landfill operating life plus the post closure period (- 2046) 300. 000 €/year New Infrastructures Bulky waste processing plant – phase 1 650. 000 € MSW plant expansion 1. 900. 000 € By-products press expansion 140. 000 € IPPC Environmental Standard implementation has meant increase on control and recording levels, higher operation cost for processing 100% of incoming waste and additional investments in landfill and processing plant 19

5 - Major impacts - Operation and Investments Increase in controls and records Treat

5 - Major impacts - Operation and Investments Increase in controls and records Treat all waste and maximize recovery Landfill Standards Post closure activity 20

Conclusions – IPPC Implementation Ø The whole certification process has taken 6 years, being

Conclusions – IPPC Implementation Ø The whole certification process has taken 6 years, being still alive Ø The certification was completed successfully, being granted in October 2007, and extended in July 2009 Ø Out of a total 165 issues, just 30 were no conform § 7 were of immediate solution § 17 required discussion to really understand the situation and agree a feasible solution § In 6 the solution exceeded ABORGASE scope, 3 were solved by means of extra investment and in 2, were partially solved in agreement with the administration Ø The implementation process, moreover 6 years of work, has implied additional investments (9, 4 M€), higher operation costs (+12%) and high increase in number of controls and records Ø The additional cost (investment and operation) are partially covered by ABORGASE Ø The IPPC has been a high challenge, but today we do a more responsible and respectful waste management activity 21

Questions & Answers 22