MQXFA Magnets Technical Progress Giorgio Ambrosio Magnets L
MQXFA Magnets Technical Progress Giorgio Ambrosio Magnets L 2 Fermilab – January 15 th, 2019
Outline § Broken shell status § Broken shell analysis § Comparison of shells in Short Models and Prototypes § Fracture analysis § Material properties analysis § MQXFAP 1 b Shims & Loading Readiness Review § Production Readiness Reviews § Coil Fabrication status 2
Broken shell status § Broken shell was removed from MQXFAP 2 and cut in pieces (at BNL): § A section with one fracture side to CERN § A section with other fracture side to LBNL § Other parts to LBNL samples for FSU 3
Comparison of Shells in Short Models (S) and MQXFA Prototypes (AP) Magnet(s) Length (m) S 1 a/b/c/d/e 1. 5 163 S 3 c 1. 5 158 100 -200 7175 EN-573 -3 S 3 a/b S 4 S 5 181 120 -140 7175 EN-573 -3 AP 1 4. 6 137 30 -140 7075 -T 6 AP 2 other shells 4. 6 153 >750 nominal 7075 -T 6 (long shells) 7075 -T 652 (top short shell) 153 36 -79 (LBNL) <20 (CERN)† 7075 -T 652 (bottom short AP 2 broken shell Max average Radius at stress in shell corners (um) (MPa) Shell material & temper 7175 EN-573 -3 shell) †LBNL & CERN measurements not yet compared 4
Fracture Analysis (CERN) 5
Progress in understanding of fracture mechanics issue in 7075 Al shells and mitigation (LBNL-FSU) § § § Tensile properties have been measured and are consistent with literature K 1 c measurements demonstrate anisotropic behavior; vary from 17 to 28 MPa√m depending on direction Measurement campaign underway to evaluate difference between 7075 -T 6 and 7075 -T 652, and of shell material that broke (nominally 7075 -T 652) Radii of cutouts are being fully evaluated for limiting cases based on realistic machining options Results will be summarized and reviewed by an external committee KIC = 20 MPa * √m Flaw size detection limit => Radius of 5 mm or greater provides margin 6
Failure Assessment Diagram Measurements & alloy selection are going to: - Move boundary up Rounding of corners: - Move points down Ultrasonic Inspection: - Move points down ~MQXFAP 2 MQXFA 03+ Path 1 Path 2 7
MQXFAP 1 b § MQXFAP 1 b Coil P 06 Readiness Review § by Zoom; on Dec, 18, 2018 § Successfully passed § MQXFAP 1 b Shims & Loading Readiness Review; § by Zoom; on Dec, 2018 § Successfully passed § MQXFAP 1 b assembly in progress § Milestone: assembly completed mid March 8
Production Readiness Reviews § Cable Fabrication PRR § Jan 22, @ LBNL and by Zoom § Strand QC Validation PRR § Feb 21, location TBD 9
Coil Fabrication WBS 302. 05/06 • Coil fabrication is on schedule/ ahead of schedule • Coil 202 impregnation complete • Coil 203 reaction complete • Coil 204 winding underway • Coil 112 arrived at LBNL • Coil 113 reaction complete • Coil 114 winding underway 10