MOST Maynard Operation Sequence Technique MOST Analysis Methods

  • Slides: 29
Download presentation
MOST Maynard Operation Sequence Technique

MOST Maynard Operation Sequence Technique

MOST Analysis Methods Description Sequence Model Phases Parameters (A, B, G…) Index Values (

MOST Analysis Methods Description Sequence Model Phases Parameters (A, B, G…) Index Values ( 1, 3, 6, …)

MODEL URUTAN MOST ACTIVITY SEQUENCE MODEL PARAMETER GENERAL MOVE ABG ABP A A –

MODEL URUTAN MOST ACTIVITY SEQUENCE MODEL PARAMETER GENERAL MOVE ABG ABP A A – Action Distance B – Body Motion G – Gain Control P – Placement CONTROLLED MOVE ABG MXI A M – Move Controlled X – Process Time I – Alignment TOOL USE ABG ABP * ABP A F/L – Fasten/Loosen C – Cut S – Surface Treat M – Measure R – Record T – Think

Get ABG Put ABP Return A

Get ABG Put ABP Return A

The general move sequence ABG ABP A - General Move A B Index Action

The general move sequence ABG ABP A - General Move A B Index Action Distance Body Motion 0 ≤ 2 in (5 cm) 1 within reach 3 -4 steps bend arise 10 5 -7 steps Sit or stand with adjustment 8 -10 steps Stand & bend Bend & sit Climb on/off through door put heavy or bulky disengage interlocked collect 0 lay aside loose fit 1 place light object Light object simo Adjustments light pressure double 3 position Sit or stand bend and Arise 6 16 Placement Index Pick up toss grasp 1 -2 steps P Gain Control get 3 G care of precision heavy pressure blind or obstructed intermediate moves 6 10 14 16

A Action Distance Extended Values

A Action Distance Extended Values

Get ABG Move / Actuate MXI Return A

Get ABG Move / Actuate MXI Return A

The controlled move sequence ABG mxi A - controlled Move Index m x i

The controlled move sequence ABG mxi A - controlled Move Index m x i Moved controlled Process time alignment Index Push/pull/turn crank Sec. Min. Hr. 0. 5 0. 01 0. 0001 1 point 1 1 ≤ 12 in. (30 cm) Button Switch Knob 3 > 12 in. (30 cm) Resistance Seat or unseat High control 2 stages ≤ 24 in. (60 cm) total 1 rev 1. 5 0. 02 0, 0004 2 points ≤ 4 in (10 cm) 3 6 2 stages ≤ 24 in. (60 cm) total 1 -2 steps 2 -3 rev 2. 5 0. 04 0. 0007 2 points > 4 in (10 cm) 6 10 3 -4 steps 3 -5 steps 4 -6 rev 4. 5 0. 07 0. 0012 16 6 -9 steps 7 -11 rev 7. 0 0. 11 0, 0019 10 precision 16

Get ABG Put in Place ABP Use * Put aside ABP Return A

Get ABG Put in Place ABP Use * Put aside ABP Return A

Berikut ini adalah elemen pekerjaan untuk menyiapkan surat undangan a. Mengambil undangan dari mesin

Berikut ini adalah elemen pekerjaan untuk menyiapkan surat undangan a. Mengambil undangan dari mesin fotokopi yang berjarak 3 langkah dari meja kerja b. Melipat undangan di atas meja kerja c. Mengambil amplop dari lemari inventaris ATK yang berjarak 5 langkah dari meja kerja. Amplop terletak pada laci terbawah sehingga perlu membungkuk untuk mengambilnya. d. Mengambil label alamat di meja kerja e. Menempel label alamat pada amplop f. Memasukkan undangan ke amplop g. Mengambil lem yang sudah tersedia di meja kerja h. Mengelem amplop i. Mengambil perangko j. Menempel perangko k. Meletakkan amplop ke wadah yang sudah disiapkan diletakkan di dekat pintu masuk ruangan yang jaraknya 7 langkah dari meja kerja hitunglah dengan sistem MOST waktu yang dibutuhkan untuk kegiatan menyiapkan undangan ini?