Monitoring PCDD PCDF Sampling in stack Quim Marcelo

  • Slides: 11
Download presentation
Monitoring PCDD & PCDF Sampling in stack Quim. Marcelo Souza dos Anjos ipaa_cetesb@sp. gov.

Monitoring PCDD & PCDF Sampling in stack Quim. Marcelo Souza dos Anjos ipaa_cetesb@sp. gov. br

Monitoring PCDD& PCDF Sampling in stack in São Paulo • 1985 - Installed the

Monitoring PCDD& PCDF Sampling in stack in São Paulo • 1985 - Installed the first incinerator • 1987 - first Test of Burn • The 90 other incinerators are installed in the State of São Paulo • in 1996 - the first test for evaluation of dioxins and furans because of licensing requests receipt of PCBs in one of four permitted incinerators to burn waste from third parties

Monitoring PCDD & PCDF • Since 2005, because of new national legislation, incinerators, furnaces

Monitoring PCDD & PCDF • Since 2005, because of new national legislation, incinerators, furnaces and boilers and coprocessing using waste for energy recovery or thermal destruction should monitoring dioxins and furans at least every 02 years • Annual monitoring may be required depending on the location and characteristics of waste • Monitoring of particulate matter every 06 months or 01 years

Monitoring PCDD & PCDF • USEPA Method 23 • 03 sample by source •

Monitoring PCDD & PCDF • USEPA Method 23 • 03 sample by source • Obligation to hold a blank field for sample • Minimum sample volume of 2. 7 Nm 3 • Sample equipment shall be of PTFE / Glass

Toxicity Equivalency Factors-FTEQ from 2, 3, 7, 8 TCDD Dioxina 2, 3, 7, 8

Toxicity Equivalency Factors-FTEQ from 2, 3, 7, 8 TCDD Dioxina 2, 3, 7, 8 – TCDD 1. 0 1, 2, 3, 7, 8 – Pe. CDD 0. 5 1, 2, 3, 4, 7, 8 – Hx. CDD 0. 1 1, 2, 3, 6, 7, 8 – Hx. CDD 1, 2, 3, 7, 8, 9 – Hx. CDD Furano USEPA 0. 1 1, 2, 3, 4, 6, 7, 8 – Hp. CDD 0. 01 OCDD 0. 001 USEPA 2, 3, 7, 8 – TCDF 0. 1 1, 2, 3, 7, 8 – Pe. CDF 0. 05 2, 3, 4, 7, 8 – Pe. CDF 0. 5 1, 2, 3, 4, 7, 8 – Hx. CDF 0. 1 1, 2, 3, 6, 7, 8 – Hx. CDF 0. 1 1, 2, 3, 7, 8, 9 – Hx. CDF 0. 1 2, 3, 4, 6, 7, 8 – Hx. CDF 0. 1 1, 2, 3, 4, 6, 7, 8 – Hp. CDF 0. 01 1, 2, 3, 4, 7, 8, 9 – Hp. CDF 0. 01 OCDF 0. 001

Method of stack sampling Compound Boiling Point(°C) Particulate >300 Semi-Vost 120 a 300 Vost

Method of stack sampling Compound Boiling Point(°C) Particulate >300 Semi-Vost 120 a 300 Vost 30 a 120 6

New POPS Chlordecone CAS Chemical Form Boiling Point (C°) 143 -50 -0 C 10

New POPS Chlordecone CAS Chemical Form Boiling Point (C°) 143 -50 -0 C 10 Cl 10 O 434 36355 -01 -8 C 12 H 4 Br 6 484. 7 at 760 mm. Hg Alpha hexachlorocyclohexane 319 -84 -6 C 6 H 6 Cl 6 561 Beta hexachlorocyclohexane 319 -85 -7 C 6 H 6 Cl 6 333 at 0. 5 mm. Hg 58 -89 -9 C 6 H 6 Cl 6 323. 4 at 760 mm. Hg Tetrabromodiphenyl ether 5436 -43 -1 C 12 H 6 Br 4 O 395. 5 at 760 mm. Hg Pentabromodiphenyl ether 60348 -60 -9 C 12 H 5 Br 5 O > 200 Hexabromodiphenyl ether 68631 -49 -2 C 12 H 4 Br 6 O 467 Heptabromodiphenyl ether 446255 -22 -7 C 12 H 3 Br 7 O 498 Perfluorooctane sulfonic acid (PFOS) 1763 -23 -1 C 8 F 17 O 3 S 260 Perfluorooctane sulfonyl fluoride (PFOS-F) 307 -35 -7 C 8 F 18 O 2 S 154. 1 at 760 mm. Hg Pentachlorobenzene (Pe. CB) 608 -93 -5 C 6 HCl 5 275 -277 Haxabromobiphenyl Lindane

Method of stacking sample for News POPs • • • USEPA Method 10 or

Method of stacking sample for News POPs • • • USEPA Method 10 or CETESB L 9. 232 03 sample by source There is no established periodicity Minimum sampling volume of 2. 7 Nm 3 Sample equipment shall be of PTFE/ Glass

Equipment sampling

Equipment sampling

Calibration sampling equipment • Wet gasometer • Dry gasometer • Pitot Method CETESB E

Calibration sampling equipment • Wet gasometer • Dry gasometer • Pitot Method CETESB E 16. 030 - Duct and Stack Stationary Source - Calibration of Sampling Equipment Used in Air Emission - Test Method (July/09).

Thank you!! Gracias !! Obrigada !! mcpoli@sp. gov. br