Module 3. 2 Vertical Pump Construction Principles Vertical pumps divided in Three parts: Cold End Warm box or Intermediate piece Motor Side Single and Multi stage pumps Cold box installation with thermal barrier All seal types available Cold end with direct coupled motor. Synchronous speed (50/60 Hz) or variable speed 6
Module 3. 2 Vertical Pump Construction VP construction Drive shaft with coupling Shaft seals : Labyrinth Mechanical Gas seal Dual Gas seal Total mass supported by mounting flange 7
Module 3. 2 Vertical Pump Construction: Warm box (Intermediate piece on VP) Outlet of the labyrinth heating coil grease retainer chamber coupling leak detector 8