MODIS and VIIRS Production Plan and Schedule Sadashiva

  • Slides: 16
Download presentation
MODIS and VIIRS Production Plan and Schedule Sadashiva Devadiga NASA/GSFC

MODIS and VIIRS Production Plan and Schedule Sadashiva Devadiga NASA/GSFC

Issues impacting the Reprocessing Schedule • Issue with the high aerosol flag in L

Issues impacting the Reprocessing Schedule • Issue with the high aerosol flag in L 2 Surface Reflectance • The high aerosol flag was set using an approximation on the path radiance for MODIS and VIIRS. • The approximation caused problem mainly on bright surface at high view angle. • For Landsat and Sentinel 2 a more robust approach has been used. The team ported the Landsat and Sentinel 2 approach to MODIS and VIIRS. • This change will impact both MODIS and VIIRS – LSR and downstream

Old High Aerosol Flag in L 2 Surface Reflectance Terra Aqua Day: 2019290 VIIRS

Old High Aerosol Flag in L 2 Surface Reflectance Terra Aqua Day: 2019290 VIIRS 3

New High Aerosol Flag in L 2 Surface Reflectance Terra Aqua Day: 2019290 VIIRS

New High Aerosol Flag in L 2 Surface Reflectance Terra Aqua Day: 2019290 VIIRS 4

Issues impacting the Reprocessing Schedule • Blocky Artifact in V 1 VIIRS Land Cloud

Issues impacting the Reprocessing Schedule • Blocky Artifact in V 1 VIIRS Land Cloud Mask • V 1 reprocessing in AS 5000 used IDPS version of the cloud mask IP process that used coarse resolution (5 km) climatology VI. • The same process is updated to use 1 km resolution Climatology VI (as in MODIS Cloud Mask process). • Results from science test run in AS 3284 verifies that the fix removes this artifact and also improves the overall performance of the cloud mask. • Impacts only VIIRS schedule – nearly all products to varying degree

2016232 @ 0824 UTC AS 5000 Zoomed in region from day 2016232 @ 0824

2016232 @ 0824 UTC AS 5000 Zoomed in region from day 2016232 @ 0824 UTC AS 5000

2016232 @ 0824 UTC AS 3284 0824 UTC Zoomed in region from day 2016232

2016232 @ 0824 UTC AS 3284 0824 UTC Zoomed in region from day 2016232 @ 0824 UTC AS 3284

MODIS C 6 Land Processing Status • C 6 Reprocessing • Reprocessing completed for

MODIS C 6 Land Processing Status • C 6 Reprocessing • Reprocessing completed for all products except gap-filled GPP/NPP and ET • Reprocessing of gap-filled GPP/NPP and ET started late Sept 2019, and expected to complete by end of the year.

MODIS C 61 Land Processing Status • C 61 Reprocessing (in progress) • Reprocessing

MODIS C 61 Land Processing Status • C 61 Reprocessing (in progress) • Reprocessing started first week of Oct 2019 • Products delivered to DAACS, but not released to public. • New C 61 Reprocessing Plan L 2 LSR PGE delivered to STIG with a fix for high aerosol flag Discontinue the ongoing C 61 reprocessing. DAACs to discard the current C 61 products Science Test and Evaluation (11/18 – 12/30) • Generate global data (Terra and Aqua) for two 16 -day periods for the LSR and downstream • LDOPE and Science teams to evaluate the products • Reprocessing to start in late Dec 2019/Jan 2020 • •

SNPP VIIRS V 1 Product Status • LSR (GSFC) – VNP 09, VNP 09

SNPP VIIRS V 1 Product Status • LSR (GSFC) – VNP 09, VNP 09 GA, VNP 09 A 1, VNP 09 H 1 • VI (UA/GSFC) – VNP 13 A 1, VNP 13 A 2, VNP 13 C 1, VNP 13 C 2 • LAI-FPAR (BU/GSFC) – VNP 15 A 2 H • Active Fire (UMD) – VNP 14, VNP 14 IMG, VNP 14 A 1 Operational In Processing Integration Testing SCF to deliver Not in V 1 • LST – VNP 21, VNP 21 A 1 D, VNP 21 A 1 N, VNP 21 A 2 • BRDF-Albedo – VNP 43 MA 1/2/3/4, VNP 43 IA 1/2/3/4, VNP 43 C 1/2/3/4, VNP 43 D 01 – VNP 43 D 84, VN 43 DNBA 1/2/3/4 • DNB (Black Marble) – VNP 46 A 1, VNP 46 A 2 • Phenology – VNP 12 Q 2, VNP 12 C 2 • BA – VNP 64 A 1 (only couple of tiles for two mission years) • Snow – VNP 10, VNP 10 A 1 F, VNP 10 C 1 • Sea-Ice – VNP 29, VNP 29 P 1 D, VNP 29 E 1 D • IST – VNP 30, VNP 30 P 1 D, VNP 30 P 1 N, VNP 30 E 1 D, VNP 30 E 1 N • MAIAC – VNP 19 MA 1, VNP 19 MA 2, VNP 19 MA 3, VNP 19 IA 1, VNP 19 IA 2, VNP 19 IA 3

SNPP VIIRS V 1 Product Status - VNP 46 A 2: May need significantly

SNPP VIIRS V 1 Product Status - VNP 46 A 2: May need significantly more time to reprocess the full mission period data - VNP 12 Q 2/C 2 not yet fully evaluated Operational processing at leading edge and reprocessing catching up to leading edge SCF Delivery In SCF or Integration and Testing VNP 46 A 2 (DNB – GSFC) VNP 12 Q 2/C 2 (Phenology – SDU) VNP 64 A 1 (BA – UMD) VNP 43 DNBA 1/2/3/4 (DNB BRDF – UMB) VNP 43 C/D (BRDF/ Albedo CMG – UMB) VNP 10 A 1 F (Snow –GSFC) Oct Nov Dec Jan 20 Feb Mar

V 2 Changes: Status • Update all L 2 PGEs to use NASA L

V 2 Changes: Status • Update all L 2 PGEs to use NASA L 1 B and Geo • All PGEs fully transitioned, tested, and verified with the exception of Active Fire • Fix High Aerosol Flag in LSR • PGE delivered by the LSR science team, currently in testing. • Fix Cloud Mask for blocky artifact from use of coarse resolution climatology VI • Land Cloud Mask PGE updated to use 1 km resolution Climatology VI • PGE tested and test results verified. • Use of MODIS Land Cover Mask • Active Fire, Snow, Sea-ice use LWM from NASA Geo • LSR stream designed to use LWM from Cloud Mask (nearly same LWM). • L 3 PGE Updates • Collection level metadata updates, CF-compliant metadata updates implemented for most of L 3 PGEs

V 2 PGEs Status Ready Integration Testing Major Change or delivery PGE / Product

V 2 PGEs Status Ready Integration Testing Major Change or delivery PGE / Product Proposed Changes Responsible Team Status %completed 503 – Cloud Mask Code change to use NISE and Climatology VI Land SIPS 80% 504 – Land Aerosol Use NASA L 1 B and Geo Science Team 80% 505 – IST Use NASA L 1 B and Geo and LWM Science Team 100% 507 - Snow Use NASA L 1 B and Geo and LWM Science Team 100% 508 – Sea Ice Cover Use NASA L 1 B and Geo and LWM Science Team 100% 509 – DNB Refl Use NASA L 1 B and Geo Science Team 100% 510/530 – Fire Mask Use NASA L 1 B and Geo, LWM Science Team 60% 511 – LSR Use NASA L 1 B and Geo Science Team 100% 616 - LST Use NASA L 1 B and Geo Science Team 100% 512 – L 2 G LLL Gridding L 1 B DNB and GEO Land SIPS 100% 554 – L 3 DNB NASA L 1 B Land SIPS 40% 590 – Subset NASA L 1 B, Geo Science Team 100% Land SIPS 80% 5 xx – L 2 G/L 3/L 4 PGEs V 2 related metadata and attribute changes

V 2 SNPP L 1 and L 2/L 3 Reprocessing Plan • V 2

V 2 SNPP L 1 and L 2/L 3 Reprocessing Plan • V 2 SNPP L 1 Reprocessing (Nov 2019) • VCST delivered the V 2 SNPP LUT in Sept 2019, Geo team delivered code and LUT update. • Science test completed, test results evaluated. • L 1 PGEs approved for operational processing as of 11/20/2019. • V 2 Land L 2 Reprocessing (Dec 2019/Jan 2020) • Cloud Mask Test (Oct/Nov 2019) • High Aerosol Flag and Cloud Mask Test(Dec 2019) • Generate L 2 and L 3 products for two 16 -day periods • Verify fix to aerosol flag and cloud mask • Verify metadata changes in L 2, L 2 G and L 3 • V 2 Land L 3 Reprocessing (Jan/Feb 2020) • Final V 2 chain test of L 2 g/L 3 (Jan 2020) • Reconcile any science and metadata issue

V 2 J 1 L 1 and L 2/L 3 Reprocessing Plan • SNPP

V 2 J 1 L 1 and L 2/L 3 Reprocessing Plan • SNPP to J 1 • Land SIPS will transition V 2 SNPP PGEs to J 1 • Science Test results reviewed by LDOPE and Science Team. LDOPE’s summary of analysis provided to science team for review. • Products will go operational with the concurrence of the PI. • V 2 J 1 L 1 reprocessing completed in Aug 2019, but • Re-reprocessing may be needed if VCST delivers an update to J 1 VIIRS RVS. • This reprocessing could be done at the time of V 2 reprocessing of L 2 products. • V 2 Land L 2 Reprocessing (Jan/Feb 2019) • Transition the V 2 PGEs to J 1 • Science Test • V 3 Land L 3 Reprocessing (Feb/Mar 2020) • Transition the V 2 L 3 PGEs to J 1 • Science Test

SNPP and J 1 V 1 and V 2 Reprocessing Time Line L 3

SNPP and J 1 V 1 and V 2 Reprocessing Time Line L 3 L 2 V 2 L 1 J 1 V 2 SNPP LUT VNP 09 L 2 L 1 NASA L 1 B and Geo change (ST) Evaluate VNP 35_L 2 (LDOPE) Transition L 2 G/L 3 PGES (Land SIPS) L 2 and L 3 Land Chain Test (ST, LDOPE) L 3 SNPP V 2 VNP 10 A 1 F VNP 43 C/D VNP 43 DNB Product in Operational Processing VNP 14 VNP 35_L 2 VNP 12 Q 2/C 2 VNP 46 A 2 PGE Delivery SNPP V 1 Oct Nov Dec Note: VNP 43 and VNP 46 A 2 could take longer to reprocess. Jan Feb Mar