Mission 4 c Intensive Horticulture Mushroom Cultivation and

  • Slides: 5
Download presentation
Mission 4 c: Intensive Horticulture Mushroom Cultivation and processing • HP offers ideal condition

Mission 4 c: Intensive Horticulture Mushroom Cultivation and processing • HP offers ideal condition for growing the export quality mushroom (Agaricus Bisporusug) • Technology for production and processing has been evolved at Jhakri, Pooh and Sumdo • Mushroom Cultivation, Harvesting, Non availability of Temperature controlled containers – makes transportation difficult • Inadequate provision for cold storage at the airportsaggravates the situation Alternative Process Co-operative System Cold Storage Harvest Consumer Market Process Banking Finance Package Modern tools helps advance avalanche forecasting. Packaging, Processing and marketing Enabling uninterrupted road links. www. presidentofindia. nic. in

Mission 5: Water harvesting and Flood control 1 st layer rain water storage Large

Mission 5: Water harvesting and Flood control 1 st layer rain water storage Large Size Layered Water Storage Concept 2 nd Layer storage (Excess water from 1 st layer) MISSION OBJECTIVES • Flood control, • Effective utilization Excess rain water leading to prosperity and • Employment generation for local population 3 rd Layer storage (Excess water from 2 nd layer) www. presidentofindia. nic. in

Mission 6 a: Hydro power Generation India Projection Energy Efficiency is the key Nuclear

Mission 6 a: Hydro power Generation India Projection Energy Efficiency is the key Nuclear Thermal Himachal Pradesh < 6000 mw today Pipe line - 3000 mw Hydro CAPACITY BY 2020 Nuclear ~20000 MW Hydro ~84000 MW Renewable Energy ~100000 MW Thermal ~96000 MW Total ~300000 MW HP may plan 10, 000 mw Hydro power Station in Mission mode www. presidentofindia. nic. in Distribution Loss 2004 2020 25% <5%

Mission 6 b: Power through Municipal Waste (Experience) 6 MW Power Plant Based Vijayawada,

Mission 6 b: Power through Municipal Waste (Experience) 6 MW Power Plant Based Vijayawada, Andhra Pradesh, India 6. 6 MW Power Plant Mahaboobnagar, AP Recharging Wellsplants with 6 MGW Sustainable - watershedhave been established Two power capacities Based on solid municipal waste technology developed by TIFAC by two entrepreneurs. This model can be replicated in other municipal and village clusters www. presidentofindia. nic. in

Mission 7: Information Communication Technology E-Governance and ICT Infrastructure establishment Collaborative development and production

Mission 7: Information Communication Technology E-Governance and ICT Infrastructure establishment Collaborative development and production of high value-added products like cell phones, mobile devices and handheld computers, convergent multimedia devices, PCS • • • Attract investments in the IT Sector Facilitating the establishments of IT industries – create an advantage of infrastructure Improve the quality of IT Education Provide SMART Governance Out Sourcing BPO Destination www. presidentofindia. nic. in