Methodology List down all tasks Group tasks under general activities Make a process flowchart

Methodology List down all tasks Group tasks under general activities Make a process flowchart Write a detailed procedure

Isolation of Hydrocarbon-degrading Bacteria from Guimaras Soil Samples Soil samples from various oil-contaminated areas

Isolation of Hydrocarbon-degrading Bacteria from Guimaras Soil Samples Soil samples from various oil-contaminated areas in Guimaras will be obtained and stored in 50 m. L conical tubes at room temperature. To isolate possible hydrocarbondegrading bacteria from each sample, a pinch of soil will be inoculated into 50 m. L of liquid minimal medium (for 1 L: 0. 5 g KH 2 PO 4, 2. 0 g KNO 3, 1. 0 g Mg. SO 4 7 H 2 O, 0. 0012 g Ca. Cl 2 • 2 H 2 O, 0. 002 g Fe. SO 4 • 7 H 2 O) with 50 μL of bunker oil (Petron Corporation, Philippines), and subjected to incubation while shaking at 37ºC at 225 rpm for one week. Once a visible change in turbidity is observed, an applicator stick will be dipped into the suspension culture and streak plated on Luria-Burtani (LB) agar (Pronadisa, Madrid, Spain). One streak plate will be made for each soil sample and incubated overnight at 37°C. Isolated bacterial colonies of different colonial morphologies will be picked and subcultured into separate LB agar slants.

Isolation of Hydrocarbon-degrading Bacteria from Guimaras Soil Samples Soil samples from various oil-contaminated areas

Isolation of Hydrocarbon-degrading Bacteria from Guimaras Soil Samples Soil samples from various oil-contaminated areas in Guimaras will be obtained and Compartmentalize stored in 50 m. L conical tubes at room temperature. To isolate possible hydrocarbondegrading bacteria from each sample, a pinch of soil will be inoculated into 50 m. L of liquid minimal medium (for 1 L: 0. 5 g KH 2 PO 4, 2. 0 g KNO 3, 1. 0 g Mg. SO 4 7 H 2 O, 0. 0012 g Third Person Ca. Cl 2 • 2 H 2 O, 0. 002 g Fe. SO 4 • 7 H 2 O) with 50 μL of bunker oil (Petron Corporation, Philippines), and subjected to incubation while shaking at 37ºC at 225 rpm for one week. Once a visible change in turbidity is observed, an applicator stick will be dipped into the suspension culture and streak plated on Luria-Burtani (LB) agar Future Tense (Pronadisa, Madrid, Spain). One streak plate will be made for each soil sample and incubated overnight at 37°C. Isolated bacterial colonies of different colonial morphologies will be picked and subcultured into separate LB agar slants.

Project Management Planning Scheduling Project Control • Define activities • When? • Identify critical

Project Management Planning Scheduling Project Control • Define activities • When? • Identify critical activities • Update progress

Project Management Tools Gantt Chart Network Chart Process Flowchart Project Schedule

Project Management Tools Gantt Chart Network Chart Process Flowchart Project Schedule

Process Flowchart Traveling to Trinoma Viewing of a movie Masticatio n of dinner Commutin

Process Flowchart Traveling to Trinoma Viewing of a movie Masticatio n of dinner Commutin g going home

GENERAL description of an activity Each activity is bounded in a RECTANGLE Traveling to

GENERAL description of an activity Each activity is bounded in a RECTANGLE Traveling to Trinoma ARROWS indicate what’s next Viewing of a movie Masticatio n of dinner Commutin g going home

Gantt Chart 16: 00 17: 00 18: 00 19: 00 20: 00 21: 00

Gantt Chart 16: 00 17: 00 18: 00 19: 00 20: 00 21: 00 22: 00 4 5 6 Go to Trinoma Get tickets Buy snacks Watch movie Eat dinner Go home current 0 1 2 3 Time, hours

Task names take up one row Names are in imperative form 16: 00 17:

Task names take up one row Names are in imperative form 16: 00 17: 00 18: 00 19: 00 20: 00 21: 00 22: 00 4 5 6 Go to Trinoma Get tickets Buy snacks Watch movie Eat dinner Go home current 0 1 2 3 Time, hours Time increments run along the bottom, in hours/days/weeks/months

Bars represent expected duration of the task 16: 00 Shading tells how complete a

Bars represent expected duration of the task 16: 00 Shading tells how complete a task is (think percentage) Arrows connect prerequisite tasks 17: 00 18: 00 19: 00 20: 00 21: 00 22: 00 4 5 6 Go to Trinoma Get tickets Buy snacks Watch movie Eat dinner Go home current 0 1 2 3 Time, hours Shaded bars mean finished tasks while unshaded bars are unfinished

This line marks the current time/date 16: 00 Unshaded bars LEFT of the line

This line marks the current time/date 16: 00 Unshaded bars LEFT of the line are behind schedule 17: 00 18: 00 19: 00 20: 00 21: 00 22: 00 4 5 6 Go to Trinoma Get tickets Buy snacks Watch movie Eat dinner Go home current 0 Fully shaded bars left of the line are completed tasks 1 2 3 Time, hours Unshaded bars right of the line are tasks yet to be started

Network Chart A=1 B=2 D=2 E=1 F=1 Code Description Duration (hr) A Go to

Network Chart A=1 B=2 D=2 E=1 F=1 Code Description Duration (hr) A Go to Trinoma 1 B Get tickets 2 C Buy snacks 1 D Watch movie 2 E Eat dinner 1 F Go home 1