MERIT INSTALLATION ABATBEA ML le 300307 1 MERIT
MERIT INSTALLATION AB/ATB-EA ML, le 30/03/07 1
MERIT INSTALLATION l Total supported weight Solenoid: 5500 kg (12000 lbs) l Hg System with 23 liter Hg: 1800 kg (4000 lbs) l Baseplate: 450 kg (1000 lbs) l l Maximum width of 1. 3 m (51") to meet CERN facility constraints AB/ATB-EA ML, le 30/03/07 2
MERIT INSTALLATION l Layout AB/ATB-EA ML, le 30/03/07 3
MERIT INSTALLATION l Cranes and shaft… AB/ATB-EA ML, le 30/03/07 4
MERIT INSTALLATION l Solenoid handling with “yellow” cross-bar AB/ATB-EA ML, le 30/03/07 5
MERIT INSTALLATION l Mercury loop AB/ATB-EA ML, le 30/03/07 6
MERIT INSTALLATION l Mercury loop handling AB/ATB-EA ML, le 30/03/07 7
MERIT INSTALLATION l Placing solenoid on the baseplate 2. Solenoid on baseplate 1. Baseplate on wedge 3. Baseplate towed up slope with tractor “VOLK” 4. Wedge removed, traverse down TT 2 AB/ATB-EA ML, le 30/03/07 8
MERIT INSTALLATION l Handling with “VOLK” (testing with a dummy in TT 2) AB/ATB-EA ML, le 30/03/07 9
MERIT INSTALLATION l TT 2 to TT 2 A AB/ATB-EA ML, le 30/03/07 10
MERIT INSTALLATION l Same handling procedure for mercury loop… AB/ATB-EA ML, le 30/03/07 11
MERIT INSTALLATION Transport Hg System Remove Rollers Transport Baseplate Remove Rollers, Level Magnet Roll. AB/ATB-EA Hg System Magnet ML, into le 30/03/07 Add Rollers 12
MERIT INSTALLATION l Elevate & Tilt Roll System into Beam Line Remove Rollers AB/ATB-EA ML, le 30/03/07 13
- Slides: 13