MEGATON MODULAR MULTIPURPOSE NEUTRINO DETECTOR Modular Configuration Ventilation

  • Slides: 18
Download presentation
MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Modular Configuration Ventilation Cooling Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Modular Configuration Ventilation Cooling Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Modular Configuration 6950 Level Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Modular Configuration 6950 Level Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Modular Configuration 7100 Level Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Modular Configuration 7100 Level Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Modular Configuration Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Modular Configuration Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Ventilation Total airflow for the top sill development is

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Ventilation Total airflow for the top sill development is planned at 200, 000 cfm. The air would flow into the top access drift, down the chamber ramps and boreholes, and out of the bottom access drift on the 7100 and back to 31 Exhaust. Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Cooling The 350 -ton Dunham-Bush chiller will be used

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Cooling The 350 -ton Dunham-Bush chiller will be used to cool development of the tops of the chambers via chilled water coils. Three chambers can be excavated at the same time. It is currently planned to keep the ultra-pure detector water at 50°F. Two or three 575 -ton machines in the 6950 Vent Plant could supply chilled water for this task. Insulated 12“ supply and return chilled water lines will be installed across the 6950 level to the detector area Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Construction Methodology Estimated Timeline Estimated Costs Assumptions Mark A.

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Construction Methodology Estimated Timeline Estimated Costs Assumptions Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Construction Methodology Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Construction Methodology Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR General Parameters Used for Schedule & Cost Work Schedule

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR General Parameters Used for Schedule & Cost Work Schedule 3 Shifts / Day x 5 Day / Week Manpower -3 Supervisors 24 Hourly Employees For One Chamber 41 Hourly Employees For Three Simultaneous Chambers Equipment For Construction Of 1 or 3 Simultaneous Chambers 4 LHD’s 2 Bolters 2 Face Jumbos 1 Long Hole Drills 2 Bench Drills 2 Lift Trucks 2 Support Vehicles Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Estimated Timeline Year One 80 ft Cable Bolts Shotcrete

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Estimated Timeline Year One 80 ft Cable Bolts Shotcrete 1 ft Shrink Cut Sill Cut Diamond Drill 6950 Borehole Development 7100 Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Year Two Estimated Timeline Decking 60 ft Cable Bolts

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Year Two Estimated Timeline Decking 60 ft Cable Bolts 6950 4 Bottom Cuts Development Precast Liners Borehole 7100 Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Year Three Estimated Timeline Precast Liners 6950 60 ft

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Year Three Estimated Timeline Precast Liners 6950 60 ft Cable Bolts 6 Bottom Cuts 7100 Development Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Year Four Estimated Timeline Waterproof Liner 6950 Precast Liners

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Year Four Estimated Timeline Waterproof Liner 6950 Precast Liners 60 ft Cable Bolts 4 Bottom Cuts 7100 Shotcrete 1 ft Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Estimated Timeline Total time for excavation and construction 208

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Estimated Timeline Total time for excavation and construction 208 Weeks or 4 Years Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Estimated Costs For 1 Chamber Labor & Benefits $

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Estimated Costs For 1 Chamber Labor & Benefits $ 5. 51 $ 9. 06 Other (Outside Contractor) $ 0. 12 15% Contingency $ 2. 20 Mining & Construction Equipment Operation $ 1. 30 Supplies $ 4. 51 Precast Concrete Liner $ 3. 25 Subtotal TOTAL Mark A. Laurenti ($MM) $ 16. 89 March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Estimated Costs Operating Costs Not Included In Estimate Equipment

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Estimated Costs Operating Costs Not Included In Estimate Equipment Purchase or Lease Cost of Waste Handling General Operation of the Mine Engineering, Geology Power and water Consumption Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Assumptions A waste handling system is in place and

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Assumptions A waste handling system is in place and capable of handling up to 540 tons per shift ( 8, 000 tons / week) before the excavation work is started on the chamber. Ventilation is sufficient enough to do more than one activity at a time in the chamber. Labor is multi-tasked in order to operate and construct all aspects of the chamber. After construction, shops areas and other miscellaneous excavations will be used for permanently installed equipment such as that needed for cooling, electronics, etc. Mark A. Laurenti March 2002

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Summary Estimated construction time for one chamber is four

MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR Summary Estimated construction time for one chamber is four years Estimated cost for one chamber is $17. 0 MM This is a snapshot of the planning done to date. Any future changes can only improve the design and reduce the cost and time. Mark A. Laurenti March 2002