March 2015 doc IEEE 802 11 150224 r

  • Slides: 33
Download presentation
March 2015 doc. : IEEE 802. 11 -15/0224 r 2 802. 11 March 2015

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 802. 11 March 2015 WG Motions Authors: Submission Date: 2015 -03 -12 Slide 1 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Abstract • This document

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Abstract • This document is a composite of all 802. 11 sub-group motions that are brought to the March 2015 802. 11 WG plenary meetings. • R 0: motions for Wednesday • TBD: – – Submission R 1: at conclusion of Wednesday WG 11 plenary R 2: containing motions for Friday WG 11 plenary R 3: at conclusion of Friday WG 11 plenary R 4: at conclusion of Friday EC meeting (Plenary session only) Slide 2 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 WEDNESDAY Submission Slide 3

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 WEDNESDAY Submission Slide 3 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion – NG 60

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion – NG 60 PAR • Believing that the PAR contained in the document referenced below meets IEEE-SA guidelines, • Request that the PAR contained in 11 -14/1151 r 8 be posted to the IEEE 802 Executive Committee (EC) agenda for EC approval to submit to Nes. Com. • Moved by: Edward Au • Seconded: Rakesh Taori • Result: 119 -0 -6 Passes • NG 60 SG vote: Moved: Carlos Cordeiro (Intel), Second: Yan Xin (Huawei), Results: 37/0/0 Submission Slide 4 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion – NG 60

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion – NG 60 CSD • Believing that the CSD contained in the document referenced below meets IEEE-SA guidelines, • Request that the CSD contained in 11 -14/1152 r 8 be posted to the IEEE 802 Executive Committee (EC) agenda for EC approval to submit to Nes. Com. • Moved by: Edward Au • Seconded: George Calcev • Result: 116 -0 -7 Passes • NG 60 SG vote: Moved: Carlos Cordeiro (Intel), Second: Yan Xin (Huawei), Results: 37/0/0 Submission Slide 5 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion - WGLB on

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion - WGLB on P 802. 11 mc D 4. 0 (Unchanged) • Having approved comment resolutions for all of the comments received from LB 206 on P 802. 11 mc D 4. 0 • Approve a 15 day Working Group Recirculation Ballot asking the question “Should P 802. 11 mc D 4. 0 be forwarded to Sponsor Ballot? ” • Moved: Dorothy Stanley on behalf of TGmc • Result: 126 -0 -3 Passes • TG Result: Moved: Edward Au, Seconded: Mike Montemurro, Result: 12 -0 -1 Motion Passes Submission Slide 6 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion – DSRC TT

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion – DSRC TT Report • Believing that the report in document 11 -15/0347 r 0 represents the work of the DSRC Coexistence Tiger Team, forward it to 802. 18 for approval to send to the EC for its approval and submittal to the FCC. • Moved by: Rich Kennedy • Seconded by: Dick Roy • Vote: 53 -48 -34 Motion Passes Submission Slide 7 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 FRIDAY Submission Slide 8

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 FRIDAY Submission Slide 8 Dorothy Stanley, Aruba Networks

March 2015 Group CAC REG SC TGaj TGah TGai TGak TGaq TGmc TGax NG

March 2015 Group CAC REG SC TGaj TGah TGai TGak TGaq TGmc TGax NG 60 NGP Submission Teleconferences doc. : IEEE 802. 11 -15/0224 r 2 Date(s) Monday March 30, May 4 Bi-weekly Thursdays March 26 through June 4 th Tuesday April 28 April 14, 21, 28, May 5 Weekly Tuesday, Mar 24 – May 9 Monday Apr 6, 27, May 4 Fri Mar 27, Apr 10, 17, 24, May 1 March 30 Thursday April 9 10: 00 ET, April 30 20: 00 ET Thursday March 19 Wednesday April 15 Motion to approve: Slide 9 Start 12: 00 ET 12: 30 ET Duration 1 1 hr 21: 00 ET 20: 00 ET 1 hr 2 hrs 10: 00 ET 11: 00 ET 12: 00 ET 10: 00 ET 1 hrs 1 hr 2 hrs 10: 00 ET 2 hrs 1 hr Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 802. 11 Operations Manual

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 802. 11 Operations Manual (OM) changes • Accept document 11 -14/0629 r 9 as the 802. 11 operations manual. • Moved: Dorothy Stanley • Seconded: • Result: • (Revision 10 will also be uploaded containing tracked changes accepted). Submission Slide 10 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion for EC Approval

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion for EC Approval on P 802. 11 mc D 4. 0 • Approve document 11 -15 -0287 r 5 as the report to the IEEE 802 Executive Committee on the requirements for conditional approval to forward Draft P 802. 11 REVmc/D 4. 0 to sponsor ballot, granting the chair editorial license and • Request the IEEE 802 Executive Committee to conditionally approve forwarding Draft P 802. 11 REVmc/D 4. 0 to sponsor ballot. • Moved: Dorothy Stanley • Seconded: • Result: • TG motion result: Moved: Jon Rosdahl, Seconded: Mark Hamilton, Result: 14 -0 -3 Motion Passes Submission Slide 11 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 TGah Working Group LB

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 TGah Working Group LB Recirculation • Having approved comment resolutions for all of the comments received from LB 207 on P 802. 11 ah D 4. 0 • Instruct the TGah editor to prepare P 802. 11 ah D 5. 0 from incorporating these resolutions and changes approved by TGah at this session and • Approve a 15 day Working Group Recirculation Ballot asking the question “Should P 802. 11 ah D 5. 0 be forwarded to Sponsor Ballot? ” • Moved: Yongho Seok on behalf of TGah • Seconded: • Result: • TG result: Moved: Menzo Wentink, Seconded: Chittabrata Ghosh, Result: Motion Passed (Yes 10 No 0 Abstain 1) Submission Slide 12 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 TGak Initial Working Group

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 TGak Initial Working Group LB • Motion: • Having approved changes to P 802. 11 ak_D 0. 07, as specified in 1115/237 r 9, • Instruct the Editor to prepare a P 802. 11 ak_D 1. 0 incorporating the changes, and • Approve a 30 day Working Group Technical Letter Ballot asking the question “Should P 802. 11 ak_D 1. 0 be forwarded to Sponsor Ballot? ” • Moved: Donald Eastlake on behalf of Tgak • Result: • TGak result: Mover: Mark Hamilton, Seconder: Richard Roy, Yes: 5 No: 0 Abstain: 0 Submission Slide 13 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NG 60 Study Group

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NG 60 Study Group extension • Request the IEEE 802 LMSC to extend the IEEE 802. 11 NG 60 Study Group. • Moved: Edward Au • Second: Stephen Mc. Cann • Result: • NG 60 Study Group vote: Move: Carlos Cordeiro (Intel), Second: Rob Sun (Huawei), Results: 37/0/0 Submission Slide 14 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 802. 24 Io. T

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 802. 24 Io. T Task Group motion Moved: IEEE 802. 11 working group supports the formation of the IEEE 802. 24. 2 Io. T Task Group with the scope contained in document 24 -15 -0003 -01 -0000 iot-scope-form. docx * *https: //mentor. ieee. org/802. 24/documents • Moved: Tim Godfrey • Second: • Result: Submission Slide 15 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion – Cipher Suite

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion – Cipher Suite Selector for 802. 15. 9 • IEEE 802. 15 requests the assignment of an 802. 11 Cipher Suite Selector for use in the 802. 15. 9 (Key Management Protocol Transport) Recommended Practice. Suggested values for the addition to Table 8128 are: • Moved by: Peter Yee • Seconded by: • Vote: Submission Slide 16 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NGP Study Group extension

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NGP Study Group extension (first) • Request the IEEE 802 LMSC to extend the IEEE 802. 11 NGP Study Group. • Moved: Jonathan Segev • Second: Edward Au • Result: Submission Slide 17 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion to Forward drafts

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Motion to Forward drafts to ISO The IEEE 802. 11 WG approves the liaising of the latest drafts of 802. 11 ah, 802. 11 ai and 802. 11 mc to SC 6 for information purposes, anticipating they will be submitted in the future to ISO/IEC JTC 1 for ratification under the PSDO agreement • Moved: Andrew Myles • Second: Mark Hamilton • Result: Submission Slide 18 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 FRIDAY – EC MOTIONS

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 FRIDAY – EC MOTIONS Submission Slide 19 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Next Generation 60 GHz

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Next Generation 60 GHz to Nes. Com Motion • Approve sending the PAR in the PAR document cited below for P 802. 11 ay to Nes. Com • And confirm the PAR and 5 C cited below – PAR document: https: //mentor. ieee. org/802. 11/dcn/14/11 -14 -115108 -ng 60 -proposed-par. docx – 5 C document: https: //mentor. ieee. org/802. 11/dcn/14/11 -14 -115208 -ng 60 -proposed-csd. docx – In the WG: PAR approval motion: 119 -0 -6; 5 C approval motion 116 -0 -7: • Moved: Adrian Stephens • Seconded: Jon Rosdahl • Result: Submission Slide 20 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NG 60 PAR Scope

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NG 60 PAR Scope • Supporting a maximum throughput of at least 20 Gbps – Throughput is measured at the MAC data service access point – Expected to provide improvements of over 3 times • Maintaining or improving the power efficiency per station • Indoor and outdoor operations in license-exempt bands above 45 GHz • Enabling backward compatibility and coexistence with legacy directional multi-gigabit devices (defined by IEEE 802. 11 ad 2012 amendment) operating in the same band Submission Slide 21 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Need for the Project

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Need for the Project • Increasing demand for capacity and new applications are driving the desire to enhance throughput of 802. 11 ad to support these needs – Enterprise, residential, operator hotspots, public scenarios – Video traffic is expected to be the dominant type of traffic in WLAN deployments, e. g. , media appliances are moving to UHD content, driving a ten fold increase in storage capacity and bandwidth requirements – Lot of industry interest in fronthaul and backhaul communication using 60 GHz • Better support of real-time applications – WLAN users demand improved performance (including throughput and power efficiency) in delivering their real-time applications – Operators expect sufficient user experience to offload traffic on WLAN Submission Slide 22 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Usage environments • Environments

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Usage environments • Environments discussed in the study group include: – – – Submission Crowded public spaces, e. g. , airports, shopping mall, train stations Enterprise and small offices Data center Home Outdoor hotspots Slide 23 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 New and enhanced applications

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 New and enhanced applications • Applications discussed in the study group include: – – – – Submission Augmented reality and virtual reality Close-reality and interactive gaming Indoor backhaul with multi-hops (e. g. , in data centers) Mass data distribution/video on demand systems in public spaces Mobile fronthauling Mobile offloading Video distribution and streaming at home (e. g. , 3 D UHD, 8 K UHD) Wireless backhauling Slide 24 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Technical Feasibility • The

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Technical Feasibility • The principle of scaling the IEEE 802. 11 PHY and MACs to higher throughput is well established by previous amendments, such as IEEE 802. 11 ac-2014 and IEEE 802. 11 ad-2012 • NG 60 builds on the broad knowledge base and system design experience of IEEE 802. 11 ad devices. – For example, NG 60 will consider MIMO and channel bonding that not only significantly improve throughput, but also allow reuse of technologies and testing being used in the previous amendments. Submission Slide 25 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Distinct Identify and Compatibility

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 Distinct Identify and Compatibility • NG 60 is different from other IEEE 802 wireless standards/projects in that it is specific for 802. 11 WLANs and aims to provide data rates in excess of 20 gigabits per second for point-to-point and point-to-multipoint indoor and outdoor usages for license-exempt bands above 45 GHz. • NG 60 will ensure coexistence and backwards compatibility with IEEE 802. 11 ad, thus creating a solution compatible with existing IEEE 802. 11 deployments. • Coexistence with other systems for license-exempt bands above 45 GHz will be evaluated and documented in Coexistence Assurance document. Submission Slide 26 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 REVmc Conditional Approval Motion

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 REVmc Conditional Approval Motion • As defined in IEEE LMSC Operations Manual (7 Nov 2014), clause 12, conditionally approve sending IEEE P 802. 11 (REVmc) to IEEE-SA Nes. Com. • Moved: Adrian Stephens • Seconded: Jon Rosdahl • In the WG: • See https: //mentor. ieee. org/802. 11/dcn/15/11 -15 -0287 -05 -000 m-p 802 -11 revmc-report-to-ec-on-conditionalapproval-to-go-to-sponsor-ballot. pptx Submission Slide 27 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 BRC Delegation Motion •

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 BRC Delegation Motion • Delegate resolution of the P 802. 11 (REVmc) sponsor ballot comments to the 802. 11 WG chair. • Moved: Adrian Stephens • Seconded: Jon Rosdahl Submission Slide 28 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NGP Extension (consent agenda)

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NGP Extension (consent agenda) • Extend the 802. 11 Next Generation Positioning (NGP) study group • Moved: Adrian Stephens • Seconded: Jon Rosdahl • In the WG: Moved: Jonathan Segev, Seconded: Edward Au, Result: Submission Slide 29 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NGP SG – March

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NGP SG – March 2015 Next Generation Positioning Study Group • • Group met for the 2 nd time. Main goals met this meeting: – – – • Approved working drafts for PAR and CSD. Approved working draft for use case document. Approved SG timelines Supporting material: • 11 -14 -1464 NG Positioning Overview and Challenges • 11 -14 -1193 Beyond Indoor Navigation • 11 -14 -1235 Scalable location Submission Slide 30 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NG 60 Study Group

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NG 60 Study Group Extension (2 nd extension) • Extend the 802. 11 Next Generation 60 GHz (NG 60) study group • Moved: Adrian Stephens • Seconded: Jon Rosdahl Submission Slide 31 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NG 60 SG Progress

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 NG 60 SG Progress Summary • Interest continues to be high in the Study Group – An average of 3 meeting slots assigned every F 2 F meeting – Average attendance per time slot is in the neighborhood of 70 • Completed – PAR and CSD approved by the Working Group in January 2015 – The documents are now under review by 802 EC and Nes. Com • In Progress – Discussions related to usage scenarios and channel modeling – Several submissions addressed specific technologies to enhance performance relative to previous IEEE 802. 11 ad-2012 amendment • Justification for SG Extension – In case extra time is necessary to respond to comments from 802 EC and Nes. Com Submission Slide 32 Dorothy Stanley, Aruba Networks

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 References Submission Slide 33

March 2015 doc. : IEEE 802. 11 -15/0224 r 2 References Submission Slide 33 Dorothy Stanley, Aruba Networks