LUNA The NeNa Cycle 22 Nep g23 Na

  • Slides: 9
Download presentation
LUNA

LUNA

The Ne-Na Cycle 22 Ne(p, g)23 Na Q=8. 8 Me. V Only upper limits

The Ne-Na Cycle 22 Ne(p, g)23 Na Q=8. 8 Me. V Only upper limits (μe. V) on the strength of the 14 possible resonances below 400 ke. V (factor 2000 on the rate) Ne, Na, Mg and Al yield in AGB and Novae (up to a factor 100) The strength of 6 resonances measured in the first 3 months of the experiment with a ne. V sensitivity Tesi dottorato R. Depalo+ tesi specialistica A. Slemmer

BBN Possible nuclear explanation of the 6 Li problem? D(α, g)6 Li Q=1. 47

BBN Possible nuclear explanation of the 6 Li problem? D(α, g)6 Li Q=1. 47 Me. V M. Anders, D. Trezzi, R. Menegazzo et al. , “First Direct Measurement of the Cross Section D(α, g)6 Li at Big Bang Energies and the Primordial Lithium Problem”, accepted by PRL A. Di Leva, D. Scott, A. Caciolli et al. , “Underground study of the hydrogen burning”, PRC 89 015803 17 O(p, g) 18 F reaction relevant for explosive A. Formicola, C. Bruno, A. Caciolli et al. , “Cross-section measurements at astrophysically relevant energies: The LUNA experiment”, NIM A 742, 258 Articoli in preparazione: CB+2 guest editors 22 Ne(p, g) 23 Na, EPJA topical issue on underground physics (Borexino+Luna), editors:

Misure per completare proposal in corso: 18 O(p, g)19 F 18 O(p, a)15 N

Misure per completare proposal in corso: 18 O(p, g)19 F 18 O(p, a)15 N 22 Ne(p, g)23 Na, BGO set-up 23 Na(p, g)24 Mg LUNA 400 k. V new program 2015 -2018, a bridge toward LUNA MV: 13 C(a, n)16 O – neutron source (LUNA MV) 12 C(p, g)13 N and 13 C(p, g)14 N – relative abundance of rich envelopes of any star 2 H(p, g)3 He in the deepest layers of H- – 2 H abundance in BBN 22 Ne(a, g)26 Mg 6 Li(p, g)7 Be 12 C-13 C – competes with 22 Ne(a, n)25 Mg neutron source (LUNA MV) – improves the knowledge of 3 He(a, g)7 Be key reaction of p-p chain

Astrofisica Nucleare @LNL * Astro-10 B: 10 B(α, n)7 Be @AN 2000 e CN,

Astrofisica Nucleare @LNL * Astro-10 B: 10 B(α, n)7 Be @AN 2000 e CN, interesse x combustibili nucleari e prima misura con gruppo Catania (Trojan Horse), assegno universitario senior di A. Caciolli * CARTA (Carbon Target): misure @CN per determinare purezza in di Carbonio (Luna-MV) 13 C ottenibile in bersagli

Gruppo Padova: C. Broggini 80%, R. Depalo 100%, R. Menegazzo 40% 2. 2 FTE

Gruppo Padova: C. Broggini 80%, R. Depalo 100%, R. Menegazzo 40% 2. 2 FTE (Caciolli associato LNL) Missioni: 24. 5 k. E commissioning al Gran Sasso+turni misura, meetings+gruppi di lavoro+LUNA-MV, misure ancillari a Legnaro e Caserta Inventariabile: 30. 15 k. E PC per sviluppo DAQ, HV per Hp. Ge, impulsatore random, 3 rivelatori Silicio, pompa da vuoto Consumo: 22. 55 k. E camera scattering, passante movimentazione rivelatori, materiale bersagli, cavi e passanti HV, attrezzatura lab. Totale: 77. 2 k. E Elettronica: 1 m. u. , Meccanica: 2 m. u. , Progettazione: 1 m. u.

LUNA-MV LUNA site LUNA MV (approved) Uterminal = 350 – 3500 k. V Imax

LUNA-MV LUNA site LUNA MV (approved) Uterminal = 350 – 3500 k. V Imax = 500 m. A (on target) DE = 0. 7 ke. V Allowed beams: H+, 4 He LUNA 1 (1992 -2001) 50 k. V LUNA 2 (2000 – …) Uterminal = 50 – 400 k. V Imax = 500 m. A (on target) DE = 0. 07 ke. V Allowed beams: H+, 4 He, (3 He) South side of Hall C: definitely assessed in early 2014 7

15/05/2014 presentazione M. Junker al MAC : ok dei referees Rifuggiato e Bisoffi. Verbale

15/05/2014 presentazione M. Junker al MAC : ok dei referees Rifuggiato e Bisoffi. Verbale trasmesso alla Giunta 13/06/2014 Da avvio gara per acceleratore ad acceleratore LUNA MV funzionante in sala C: 39 mesi Preparazione sito: 12 mesi Ottenimento nulla osta Prefettura: 12 -18 mesi Previsione smontaggio OPERA: area libera a dicembre 2016 Da luglio 2014: S. Gazzana ingegnere nucleare con esperienza nel coordinamento cantieri e sicurezza (GLIMOS) per seguire anche lo smontaggio di OPERA