LS 2 preparatory meeting A Tauro General information

  • Slides: 42
Download presentation
LS 2 preparatory meeting A. Tauro

LS 2 preparatory meeting A. Tauro

General information • LS 2 duration: 27 months • Access mode: general • Underground

General information • LS 2 duration: 27 months • Access mode: general • Underground visits: possible from 16 December 2018 (no visits during Xmas closure) • IMPACT requests: possible to make one request per activity (e. g. TPC disconnection). Not possible to make generic request to cover 1 year… • RP: personal dosimeter needed (no declassification) 25/1/19 LS 2 preparatory meeting 2

LS 2 master plan 25/1/19 LS 2 preparatory meeting 3

LS 2 master plan 25/1/19 LS 2 preparatory meeting 3

TPC extraction timeline Install Delphi Frame Remove SPD, FWD detectors and beampipe Remove TPC

TPC extraction timeline Install Delphi Frame Remove SPD, FWD detectors and beampipe Remove TPC and bring it to SXL 2 Done Miniframe extraction 7 Jan ‘ 19 9 Jan Remove ITS TPC to parking position 23 Jan 11 Feb LS 2 preparatory meeting 20 Feb 26 Feb 1 Mar ‘ 19 4

TPC preparation (cleanroom) Delivered to CERN end Jan-beg. Feb 25/1/19 LS 2 preparatory meeting

TPC preparation (cleanroom) Delivered to CERN end Jan-beg. Feb 25/1/19 LS 2 preparatory meeting 5

EN-EL interventions • AUG on Monday 25 March 2019 - no access on site

EN-EL interventions • AUG on Monday 25 March 2019 - no access on site (both surface and underground) • Diesel maintenance: 1 Apr 2019 • CERN wide 66 k. V maintenance: 28 May 2019 to 19 July 2019 – reduced consumption (i. e. no magnets) • 18 k. V, 3. 3 k. V and LV network maintenance: • • Mon 20 to Wed 22 Jan 2020: 3 days no general services - no access on site (both surface and underground) Thu 23 to Fri 24 Jan 2020: 2 days ‘’Limited access’’ details being worked out • AUG on Monday 27 January 2020 - no access on site (both surface and underground) • Auto transfer test: 11 Apr 2020 • BIW test: 5 and 6 Oct 2020 from 18: 00 to 00: 00 – no access underground 25/1/19 LS 2 preparatory meeting 6

EN-CV interventions • Big maintenance: • • • SF: from Nov 2019 to mid

EN-CV interventions • Big maintenance: • • • SF: from Nov 2019 to mid Jan 2020. NO impact on ALICE as both magnets will be OFF. UW: stop UX mixed water for 2 days in week 40/2019 (October). SU: various small perturbations + 1 day stop all cooling UX + 1 day stop all cooling SXL 2 in week 16/2020 (April). • Small maintenance: • • UW: from mid Aug 2020 to mid Sep 2020. Stop mixed water UX for 1 day in week 37/2020 (September). SF+SU: weeks 45 -47/2020: cleaning towers (stop SF 1 week) + 1 day stop all cooling UX. • Ventilation: • • Maintenance SXL 2 cleanroom before April 2019. Procedure to be established (CV). SG 2: w 7/2019 Gas extraction: w 8/2019 UX 25 cavern: May 2020 (tbc) MCH and MTG: Apr 2020 (tbc) L 3: Apr 2020 (tbc) ITS: Apr 2020 (tbc) • Raw water: • Test after Apr 2019. Short interruption (1 day), can be used tap water during the test. 25/1/19 LS 2 preparatory meeting 7

Gas systems status LS 2 status TPC Detailed plan exists TRD Xe recuperation early

Gas systems status LS 2 status TPC Detailed plan exists TRD Xe recuperation early Jan-19 Run CO 2 till Oct-19, and with Xe from Nov-19 TOF Back-up with R 134 a until late 2020. Need a few weeks with system ON in late 2019 or 2020 (tbc) HMP Always under Ar backup PHO OFF till Oct-19, then need N 2 CPV OFF till Oct-19, then need gas (Ar/CO 2 80/20) Need humidifier in RUN 3 PMD Dismounting MCH OFF till May-19, then need gas (Ar/CO 2 80/20) MTR missing info 25/1/19 LS 2 preparatory meeting 8

Safety systems maintenance • • Fire detection: w 2 -3/2019 Gas detection: w 7/2019

Safety systems maintenance • • Fire detection: w 2 -3/2019 Gas detection: w 7/2019 (in parallel to SG 2 ventilation maintenance) Red emergency phones: 20/2/2019 Fire detection (racks): w 10/2019 25/1/19 LS 2 preparatory meeting 9

CERN Open Days • 14 and 15 September 2019 25/1/19 LS 2 preparatory meeting

CERN Open Days • 14 and 15 September 2019 25/1/19 LS 2 preparatory meeting 10

Optical fibers installation Planning copper cables (EN-EA) Mar to Aug: pull cables ALICE tech.

Optical fibers installation Planning copper cables (EN-EA) Mar to Aug: pull cables ALICE tech. EN-EA 25/1/19 LS 2 preparatory meeting 11

Planning optical fibers (EN-EL) Feb to October: install and test all trunk cables 25/1/19

Planning optical fibers (EN-EL) Feb to October: install and test all trunk cables 25/1/19 LS 2 preparatory meeting April 2020: install TPC/ITS fibers after Miniframe installation 12

Miniframe planning (rework in SX 2) Details about ITS PP 1 -PP 2 cables

Miniframe planning (rework in SX 2) Details about ITS PP 1 -PP 2 cables missing ALICE tech. EN-EL EN-EA LS 2 preparatory meeting 13

Day-by-day sequence w 4 ALICE technicians Institutes Transport Scaffolding EN-EA Other CERN groups Pakistani

Day-by-day sequence w 4 ALICE technicians Institutes Transport Scaffolding EN-EA Other CERN groups Pakistani team 25/1/19 LS 2 preparatory meeting 14

UX 25 activities w 4 – Mon 21 Jan 2019 ST 3 Disconnect PHOS

UX 25 activities w 4 – Mon 21 Jan 2019 ST 3 Disconnect PHOS TOF DRM 1 TPC I-bars Remove Aside cables ALTEAD: remove 13 th PX 24 beam (interference with DF): nobody A-side when beam is lifted (AM) Remove ITS/SPD inox pipes Cable trays 25/1/19 Put nacelle here LS 2 preparatory meeting Install Solar crates, remove CROCUS, 15 cables, boxes (nacelle, scaffolding)

UX 25 activities w 4 – Tue 22 Jan 2019 Load test Yellow Platform

UX 25 activities w 4 – Tue 22 Jan 2019 Load test Yellow Platform (SXL 2) (PM) ALTEAD: displace cage (SX 2) Drill concrete ST 3 Disconnect PHOS TOF DRM 1 TPC I bars + blocks (AM) TPC frame (PM) TPC VHV box Remove Aside cables Drill 2 holes for MID services (SMB) Remove ITS/SPD inox pipes Cable trays 25/1/19 Access with ladders LS 2 preparatory meeting 16

UX 25 activities w 4 – Wed 23 Jan 2019 ALTEAD: transport TPC GEM

UX 25 activities w 4 – Wed 23 Jan 2019 ALTEAD: transport TPC GEM chambers Drill concrete ST 3 Disconnect PHOS TOF DRM 1 Remove Aside cables Remove PX 24 ventilation duct Call CV beforehand. In case of evacuation use PM 25. Reinstall right after DF Remove ITS/SPD inox pipes Cable trays 25/1/19 LS 2 preparatory meeting 17

UX 25 activities w 4 – Thu 24 Jan 2019 No access in/out L

UX 25 activities w 4 – Thu 24 Jan 2019 No access in/out L 3 during Delphi Frame handling with crane Delivery 8 empty ST 1 boxes Cleaning SXL 2 and SX 2 (5: 00 AM) And complete rail assembly. TRD people must be around Topnet: cavern cleaning Ouvaroff: complete scaffolding Miniframe (SX 2) Remove ITS/SPD inox pipes ST 3 ST 1 Disconnect PHOS TOF A 1395 -6 Fix TPC transfer rails Disconnect quadrants 25/1/19 LS 2 preparatory meeting 18

Status as of today • Underground • Delphi Frame lowered to Low-Beta platform on

Status as of today • Underground • Delphi Frame lowered to Low-Beta platform on Wednesday, installation in front of L 3 today • Last PX 24 beam and ventilation pipe removed • TPC A-side I-bars installed, TPC transfer rails installed in parking position • PHOS fully disconnected • TOF work completed • Surface: • Yellow platform load test 25/1/19 LS 2 preparatory meeting 19

Highlights w 4 Jan 21 Jan 22 Jan 23 25/1/19 Activities w 4: LS

Highlights w 4 Jan 21 Jan 22 Jan 23 25/1/19 Activities w 4: LS 2 preparatory meeting • Last PX 24 beam and ventilation pipe removed • TPC A-side I-bars • Installation Delphi frame • Preparation TPC extraction 20

Jan 23 at 17: 00 ALICE TB - A. Tauro 21

Jan 23 at 17: 00 ALICE TB - A. Tauro 21

UX 25 activities w 4 – Fri 25 Jan 2019 Nacelles here! 25/1/19 Once

UX 25 activities w 4 – Fri 25 Jan 2019 Nacelles here! 25/1/19 Once aligned, fix frame to blocks LS 2 preparatory meeting ST 3 ST 1 Disconnect PHOS Install Delphi Frame + adjust frame TOF A 1395 -6 Reinstall fences Survey DF rails Remove A-side services Remove survey tripods 22

February schedule 24/1/19 ALICE TB - A. Tauro 23

February schedule 24/1/19 ALICE TB - A. Tauro 23

TPC preparation (cleanroom) Delivered to CERN end Jan-beg. Feb 24/1/19 ALICE TB - A.

TPC preparation (cleanroom) Delivered to CERN end Jan-beg. Feb 24/1/19 ALICE TB - A. Tauro 24

Day-by-day sequence w 5 ALICE technicians Institutes Transport Scaffolding EN-EA Other CERN groups Pakistani

Day-by-day sequence w 5 ALICE technicians Institutes Transport Scaffolding EN-EA Other CERN groups Pakistani team 25/1/19 LS 2 preparatory meeting 25

UX 25 activities w 5 – Mon 28 Jan 2019 SDD: remove SDD crates

UX 25 activities w 5 – Mon 28 Jan 2019 SDD: remove SDD crates UX 25 and CR 4 Cable trays ALTEAD + PHOS: remove 11 PHOS boxes from the cavern (10: 00) Align TPC Scaffolding DF feet+rail Fix TPC transfer rails And discuss at 9: 00 about baby-frame access 25/1/19 ST 3 ST 1 Remove A-side services Fix TPC transfer rails LS 2 preparatory meeting Install Solar crates, remove CROCUS, cables, boxes. Need nacelle INSIDE 26

UX 25 activities w 5 – Tue 29 Jan 2019 P 2 tech: pre-assemble

UX 25 activities w 5 – Tue 29 Jan 2019 P 2 tech: pre-assemble TPC omega platforms in SX 2 (tbc) Inspect DCal frames (Jean-Se + Joseph) ALTEAD: transport 8 empty ST 1 boxes to C-O/side ST 3 V 0 C Preparation TPC extraction ST 1 Fix TPC transfer rails Cable trays Remove A-side services Need nacelle! Cable trays ALTEAD: transport 13 th PX 24 beam outside SX 2 Fix TPC transfer rails 2 ALTEAD people needed Removal V 0 C PMTs and electronics 25/1/19 LS 2 preparatory meeting 27

UX 25 activities w 5 – Wed 30 Jan 2019 Cleaning Yellow Platform (Topnet)

UX 25 activities w 5 – Wed 30 Jan 2019 Cleaning Yellow Platform (Topnet) (SXL 2) Delivery TPC manipulator (transport from Heidelberg) Cable trays Inspect DCal frames (Jean-Se + Joseph) ST 3 ST 1 Preparation TPC extraction Cut cables/fibers Remove A-side services Fix TPC transfer rails 25/1/19 LS 2 preparatory meeting 28

UX 25 activities w 5 – Thu 31 Jan 2019 Cleaning Yellow Platform (Topnet)

UX 25 activities w 5 – Thu 31 Jan 2019 Cleaning Yellow Platform (Topnet) (SXL 2) L. Simonetti at CERN (until end February) Cable trays Cleaning cavern (Topnet) ST 3 ST 1 Remove Baby Frame scaffolding Install omega platforms Remove A-side services Fix TPC transfer rails 25/1/19 LS 2 preparatory meeting 29

UX 25 activities w 5 – Fri 1 Feb 2019 Cleaning Yellow Platform (Topnet)

UX 25 activities w 5 – Fri 1 Feb 2019 Cleaning Yellow Platform (Topnet) (SXL 2) 25/1/19 Cable trays LS 2 preparatory meeting ST 3 Install ITS rails ST 1 Remove A-side services ALTEAD: transport 4 +4 chambers (inside boxes) to b. 3297 30

Day-by-day sequence w 6 ALICE technicians Institutes Transport Scaffolding EN-EA Other CERN groups Pakistani

Day-by-day sequence w 6 ALICE technicians Institutes Transport Scaffolding EN-EA Other CERN groups Pakistani team 25/1/19 LS 2 preparatory meeting 31

UX 25 activities w 6 – Mon 4 Feb 2019 Cleaning cleanroom roof (Topnet)

UX 25 activities w 6 – Mon 4 Feb 2019 Cleaning cleanroom roof (Topnet) Cleaning ARC moquette (5: 00 AM) – no access for 24 h Can only be done after removing all ST 1 quadrants! ALTEAD: transport ITS CYL frame to UX 25 cavern MCH: test ST 1 and ST 2 quadrants with X-ray source (SX 2) – whole month Cable trays Install ITS rails Optical fibers Disconnect DCal Remove A-side services Adriano at CERN ST 3 Scaffolding cables/pipe s Cleanroom maintenance (CV) - tbc Remove optical sub-racks covers in backframe (Giuseppe+1 technician) 25/1/19 LS 2 preparatory meeting 32

UX 25 activities w 6 – Tue 5 Feb 2019 Cleaning cleanroom roof (Topnet)

UX 25 activities w 6 – Tue 5 Feb 2019 Cleaning cleanroom roof (Topnet) Adriano at CERN Remove TPC and TOF (DAQ) terminal plates (Giuseppe) 25/1/19 LS 2 preparatory meeting Cable trays MID ST 3 Beampipe support Optical fibers Disconnect DCal Remove A-side services Install beampipe support, remove valve, transfer beampipe to rails, remove beampipe support Installation XBEE. Need nacelle I-side 33

UX 25 activities w 6 – Wed 6 Feb 2019 Cavern lift maintenance: no

UX 25 activities w 6 – Wed 6 Feb 2019 Cavern lift maintenance: no access between 6: 00 AM and 8: 00 AM ALTEAD: open cleanroom roof, put YP inside cleanroom and assemble various extensions + cleanroom maintenance (tbc) EN-CV: fix leaks cleanroom walls (rubber) (special nacelle) (tbc) Adriano at CERN 25/1/19 LS 2 preparatory meeting Cable trays MID ST 3 ITS cables Disconnect DCal Remove A-side services Install CYL frame, put cable trays horizontal, arrange cables into CYL frame 34

UX 25 activities w 6 – Thu 7 Feb 2019 ALTEAD/TPC: put VHV power

UX 25 activities w 6 – Thu 7 Feb 2019 ALTEAD/TPC: put VHV power supply and gas equipment inside cleanroom ALTEAD + P 2 tech: assemble YP, extension, green crane, TPC manipulator and sector mockup EN-CV: fix leaks cleanroom walls (rubber) (special nacelle) + cleanroom maintenance (tbc) ALTEAD + P 2 tech: close cleanroom roof 25/1/19 LS 2 preparatory meeting Cable trays MID ST 3 ITS cables Disconnect DCal Remove A-side services Cleaning cavern (Topnet) 35

UX 25 activities w 6 – Fri 8 Feb 2019 Cleaning cleanroom (Topnet) 25/1/19

UX 25 activities w 6 – Fri 8 Feb 2019 Cleaning cleanroom (Topnet) 25/1/19 LS 2 preparatory meeting Cable trays ST 3 Disconnect DCal Transfer ITS to rails Remove omega platforms Remove A-side services Remove service CONES and omegas from A-side (put them in service frame), transfer ITS + service chariot on rails 36

Day-by-day sequence w 7 ALICE technicians Institutes Transport Scaffolding EN-EA Other CERN groups Pakistani

Day-by-day sequence w 7 ALICE technicians Institutes Transport Scaffolding EN-EA Other CERN groups Pakistani team 25/1/19 LS 2 preparatory meeting 37

UX 25 activities w 7 – Mon 11 Feb 2019 MCH: test ST 1

UX 25 activities w 7 – Mon 11 Feb 2019 MCH: test ST 1 and ST 2 quadrants with X-ray source (SX 2) – whole month Certification cleanroom Ton at CERN (2 weeks). Remove SSD crates when possible 25/1/19 LS 2 preparatory meeting Cable trays ST 3 Install omega platforms Disconnect DCal Move TPC to parking position Disconnect TPC gas Remove A-side services EN-CV: SG 2 ventilation maintenance (whole week) + gas detection maintenance 38

UX 25 activities w 7 – Tue 12 Feb 2019 Cable trays Install ITS

UX 25 activities w 7 – Tue 12 Feb 2019 Cable trays Install ITS protection ST 3 Remove A-side services Dry test TPC ROC installation in the cleanroom (whole week) Ton, Pieter 25/1/19 LS 2 preparatory meeting 39

Cable trays Disconnect ITS PP 2/3 ST 3 Remove A-side services UX 25 activities

Cable trays Disconnect ITS PP 2/3 ST 3 Remove A-side services UX 25 activities w 7 – Wed 13 Feb 2019 (Ton, Flavio, Michel) 25/1/19 LS 2 preparatory meeting 40

UX 25 activities w 7 – Thu 14 Feb 2019 25/1/19 LS 2 preparatory

UX 25 activities w 7 – Thu 14 Feb 2019 25/1/19 LS 2 preparatory meeting Cable trays Disconnect ITS PP 2/3 ST 3 Remove A-side services Cleaning cavern (Topnet) 41

25/1/19 Remove FMD 2 And remove beampipe support, install LS 2 preparatory meeting bakeout

25/1/19 Remove FMD 2 And remove beampipe support, install LS 2 preparatory meeting bakeout shell Cable trays Move away service chariot ST 3 Remove A-side services UX 25 activities w 7 – Fri 15 Feb 2019 42