LS 2 Installation Worshop: CALO electronics & SPD/Lead/PS dismantling 16 May 2018 Pascal Perret

LS 2 Installation Worshop: CALO electronics & SPD/Lead/PS dismantling 16 May 2018 Pascal Perret LPC Clermont Ou t Ø D line: Ø P ocum Ø T lannin entatio ns Ø T rainin g tatu g o s Ø D ols & est sto i n rem atio rage ove n o dp f arts

Documentation status u Work Package Procedure: List of the steps involved n n n

Documentation status u Work Package Procedure: List of the steps involved n n n n In wo rk Step 1: Preparation of the work site Step 2: Consignation, isolation and emptying of circuits Step 3: PS/SPD electronics on ECAL platforms Step 4: XCAL electronics on XCAL platforms Step 5: SPD cables Step 6: PS cables Step 7: PS/SPD cooling system Step 8: PS/SPD cable trays Step 9: PS/SPD supermodules Step 10: Lead panels Step 11: PS/SPD supermodules and lead infrastructure Step 12: CALO cables between XCAL platforms and barracks Step 13: CALO electronics inside the barracks (D 3 and B 1 B 01 Pascal Perret - LPC Clermont rack) 16/05/2018 2

Actions needed (Oct. 2017) Action Responsible The PS platform on ECAL must be rebuild

Actions needed (Oct. 2017) Action Responsible The PS platform on ECAL must be rebuild and store in a safe place. General dimensions are reported in LHCb TC the calculation note stored in EDMS Refurbishing of minor parts of the PS platform LHCb TC supports. Investigate if the “floor above RICH 2” can be put in LHCb TC place with the “access tower” in position The C-Palonnier has to be refurbished. HSE have to HSE with LHCb perform a preliminary investigation TC Deadline/comments ~O K Spring 2018 By the final version By the final draft/refurbish on Spring 2018 (in case) Cradles for the Supermodules preliminary design: dismantling/transport/storage CALO/LAPP By the final draft/production drawings and Safety File for March 2018 Cradles for the lead preliminary design: dismantling/transport/storage CALO/LAPP By the final draft/ production drawings and Safety File for March 2018 The cradle for lead has to be refurbished. HSE have HSE with LHCb to perform a preliminary investigation TC Reverse engineering of the present cradle for lead By the final draft/refurbish on Spring 2018 (in case) LHCb TC The sections of plates of the floor for the access above the muon filters have to be retrieved and LHCb TC Pascal Perret - LPC Clermont stored in a safe 16/05/2018 place. ASAP Spring 2018 3

Actions needed (Oct. 2017) To To estimate the working area dose, the WPL should

Actions needed (Oct. 2017) To To estimate the working area dose, the WPL should include in the WPP the number of person involved in the dismantling and the time person of work in the different zone closed to the detector. WPL By the final version The people involved in the activities have to be properly trained before that the activity starts. Identify the proper safety courses needed and report them in the WPP. A list of the courses offered at CERN can be found in the Training Catalogue. WPL with HSE/SEE By the final version Ensure that ECAL/HCAL can be moved according to the needs. LHCb TC By the final version The specific Work Package activities plan should be uploaded in the proper folder “Work Packages activities plan”. Include the crane needs. WPL Spring 2018 16/05/2018 Pascal Perret - LPC Clermont do 4

Actions needed u PS/SPD supermodules and Lead removal: to be checked! n The cavern

Actions needed u PS/SPD supermodules and Lead removal: to be checked! n The cavern environment is different from the installation time l Services: pipes, cables, CALO access tower, etc. 16/05/2018 Pascal Perret - LPC Clermont 5

Actions needed u PS/SPD supermodules and Lead removal: to be checked! n The cavern

Actions needed u PS/SPD supermodules and Lead removal: to be checked! n The cavern environment is different from the installation time l n Services: pipes, cables, CALO access tower, etc. Extension of the rail? How? : under investigation l Done by CERN: Joao and Olivier in the past. Pascal Perret - LPC Clermont 16/05/2018 6

Working area XCAL cables PS/SPD cables SM & lead panels dismantling 16/05/2018 Pascal Perret

Working area XCAL cables PS/SPD cables SM & lead panels dismantling 16/05/2018 Pascal Perret - LPC Clermont 7

Preliminary schedule M 1, ECAL Th dif e m fic os ult t !

Preliminary schedule M 1, ECAL Th dif e m fic os ult t ! CERN LPC, BCN LAL M 1, RICH, OT CERN IHEP, LPC M 1, RICH M 2 -5 IHEP, LAPP IHEP LAL, LAPP, CERN 16/05/2018 Pascal Perret - LPC Clermont 8

Training n Preliminary estimation of needs 16/05/2018 Pascal Perret - LPC Clermont 9

Training n Preliminary estimation of needs 16/05/2018 Pascal Perret - LPC Clermont 9

Tools n A lot of work done on this topic: l CE RN C-palonnier

Tools n A lot of work done on this topic: l CE RN C-palonnier • refurbished l Passerelle • Missing parts bought l Floors above RICH 2 • New design being revisited (Olivier, Alessandro) l Floors above M 2 -M 5: • A lot of plates are missing: new ones will be provided 16/05/2018 Pascal Perret - LPC Clermont 10

Tools & storage n PS&SPD cradles l To build 4 • Adapted design for

Tools & storage n PS&SPD cradles l To build 4 • Adapted design for storage&transport with crane & cherry picker l Lateral bars (32) 16/05/2018 Pascal Perret - LPC Clermont 11

Tools & storage n Lead cradles Refurbish the 2 existing ones l Buy 2

Tools & storage n Lead cradles Refurbish the 2 existing ones l Buy 2 new ones l • Quotation asked to Goslar n New structure for storage l Several iterations 16/05/2018 LA Pascal Perret - LPC Clermont PP 12

Tools & storage n New structure for storage (flex building) LA PP 16/05/2018 Pascal

Tools & storage n New structure for storage (flex building) LA PP 16/05/2018 Pascal Perret - LPC Clermont 13

Tools & storage n New structure for storage (flex building) LA PP 16/05/2018 Pascal

Tools & storage n New structure for storage (flex building) LA PP 16/05/2018 Pascal Perret - LPC Clermont 14

Tools & storage n Planning for cradles production 16/05/2018 Pascal Perret - LPC Clermont

Tools & storage n Planning for cradles production 16/05/2018 Pascal Perret - LPC Clermont 15

Destination of removed parts 16/05/2018 Pascal Perret - LPC Clermont 16

Destination of removed parts 16/05/2018 Pascal Perret - LPC Clermont 16

Conclusion u A lot of activities to do in a short period n 3

Conclusion u A lot of activities to do in a short period n 3 weeks for preparation and electronics removal l n 9 + 1 (contingency) weeks for cables, detector and infrastructure l n u XCAL, M 1, RICH, (IT/OT - Sci. Fi? ) areas are affected 1 week for cables between CALO and patch panel behind M 5 Preparation (tools) is ongoing n n u Should be done in parallel with other activities A long way Almost in time Let’s hope for no bad surprises when the work will start … 16/05/2018 Pascal Perret - LPC Clermont 17

SPARES Pascal Perret - LPC Clermont 18

SPARES Pascal Perret - LPC Clermont 18

Actions needed (June 2017) Action Responsible Deadline/ comments ~O Pascal Perret nd K Define

Actions needed (June 2017) Action Responsible Deadline/ comments ~O Pascal Perret nd K Define the limits of responsibility for the dismantling By 2 Draft / with Laurent of the cables L. Roy has been already informed Roy ~O CALO (Pascal K For the tools, provide all the documents/files ASAP/ Perret and (calculation note, drawings and 3 D models) to P. Perret and B. Lieunard have been Bruno Augusto Sciuccati already informed Lieunard) Pascal Perret, ~O Investigation in-situ has been planned to evaluate Bernard Chadaj 15/06/17 K the conditions of the handling tools and Augusto /annex 1 enclosed Sciuccati A mechanical qualification of the old tools (CLHCb TC and By the 2 nd draft/status report ~ OK Pallonier, lead cradles if case 1) that are supposed to HSE Ready by end of 2018 used will be arranged Supply of access means (PS passerelle, Muon floor LHCb TC and By the 2 nd draft/status report and floor above RICH 2) HSE Ready by end of 2018 By the 2 nd draft/status report ~ Design and supply of new tools (lead cradles if case 2 CALO M OReady for production by the end of ar K and Super. Module cradles) ch 20 Clermont 2017 Pascal Perret - LPC 19 16/05/2018 1

Actions needed (June 2017) ~ RI OK to CH we 2 r? Check if

Actions needed (June 2017) ~ RI OK to CH we 2 r? Check if the “floor above rich-2” installation is prevented from the presence of M 1 LHCb TC (Alessandro Saputi) Provide the document with the code name for each cable to Laurent Roy CALO (Pascal Perret) ASAP Dimension of the components to be stored at CERN in the FLEXBUILDING (with cradles and supporting frames) CALO (Pascal Perret) By the 2 nd Draft Environmental conditions of the FLEXIBUILDING have to be clarified LHCb TC (Gloria Corti) By the 2 nd Draft Availability of the FLEXIBUILDING during LS 2 period have to be clarified LHCb TC (Gloria Corti) By the 2 nd Draft Preliminary estimation of the radiation level of the area LHCb TC (Gloria Corti) By the 2 nd Draft 16/05/2018 Pascal Perret - LPC Clermont ASAP ~O K ~9 ~O x 5 K ~3 x 4 m 6 3 t 20