LOGO Point Electronics Corporation Team HDX Tariq Yousafzai

  • Slides: 6
Download presentation
LOGO Point Electronics Corporation Team HDX Tariq Yousafzai Ghayyur and Basit

LOGO Point Electronics Corporation Team HDX Tariq Yousafzai Ghayyur and Basit

Scheme of Presentation Process Map for HDTV Q. 4 Q. 3 Problems and bottlenecks

Scheme of Presentation Process Map for HDTV Q. 4 Q. 3 Problems and bottlenecks Limmer Trip Who should make the visit & what to investigate Q. 2 Krisheads selection of the labor cost KPI Whether on target or wayward Q. 1 A Case Study of Team HDX Randall suggestions regarding the facility setup. Should Limmer follow them or come up with another plan

14 -4. Process Map for HDTV

14 -4. Process Map for HDTV

14 -3. Trip to Jakarta, Indonesia • He should concentrate on un-programmed decisions •

14 -3. Trip to Jakarta, Indonesia • He should concentrate on un-programmed decisions • Contingency Planning such as coming up a multi sourcing strategy for LCD displays. INSTEAD • Send a representative having expertise in the problem area • He or She should investigate in below manner (a) Take a Transit Walk of the facility (b) Packaging and material handling equipment (c) Inspect their variety of glasses as pointed out by Sunny representative. (D) Give advise to Suny as to how to fix defects

14 -2 Labor as KPI? Yes/No CSF and KPIs should support operations, overall objectives

14 -2 Labor as KPI? Yes/No CSF and KPIs should support operations, overall objectives and end-user requirements. Differences between Cathode Ray Tube televisions & HDTV Operations exist by design or default. Labor Cost is part of Overall Cost. Therefore not meaningful when used in isolations KPIs should be measurable, somewhere (5 -6) and support overall organizational objectives.

14 -1. Recommendations of Randall Questions is what type process layout are the using

14 -1. Recommendations of Randall Questions is what type process layout are the using today? Layout should help in moving materials, people and equipments. Therefore the above concerned should be taken into confidence before making any decisions. We believe Randall suggestions are practical as it involves little change in facility layout. The reasons are (a) Continuous innovation and not a breakthrough (b) Cost effective as not retraining (c) Establishing new setup in short span of time is somewhat unrealistic