LLI-010 "Introducing nature tourism for all" / Uni. Green Trail along ROJA seaside 25. 10. 2018
General information Ø Total project funding part for Roja municipality – 62 317, 20 EUR Ø ERAF funding – 52 969, 52 EUR; Ø Roja municipal co-financing – 9 347, 58 EUR
Wooden path trails renovation in Roja public beach 512. 70 m long 2, 00 m wide, with 4 turning squares and benches Trail renovation costs: 49 985, 99 eur. Wooden trail are adapted for peoples with disabilities. Ø Renovation works was finished at 19. 09. 2017 Ø Ø
Info stand for peoples with vision problems Ø At the renovated is located info stand about Roja beach area, available infrastructure for visitors, plants, which are growing around activities what can and can not do at the public beach area. All information is available in brail and also beach map is depicted as tactile map. Ø It was put up at 20. april Ø At 25. april was official trail and info stand openning event Ø Costs: 150 EUR layout designed + 500 eur brail translation and production
Visitors counters Ø We have locate two visitor counters (surveillance camera) at the Roja public beach. Ø Process was long and not so easy! Ø Finaly at 25. september two visitors counters was placed out! Ø Total costs of counters was 2585, 36 EUR
Visitors counters statictic Data from 25. 09 till 24. 10 (morning) Entered Exited 1. camera 846 765 2. camera 786 1285 1632 2050 Avarage number of visitors 1841