LIU Ions R Scrivens for the LIU IONS

  • Slides: 11
Download presentation
LIU Ions R. Scrivens for the LIU IONS PS Injector team 09/12/2016

LIU Ions R. Scrivens for the LIU IONS PS Injector team 09/12/2016

Outline Ø Beam Instruments – Pick Ups Ø Low Level RF Ø Linac. Booster.

Outline Ø Beam Instruments – Pick Ups Ø Low Level RF Ø Linac. Booster. Spectrometer Line Ø Non Baseline Options Ø General Schedule.

Beam Instruments Injection Pick Ups • Production is ongoing for 2 pick ups, and

Beam Instruments Injection Pick Ups • Production is ongoing for 2 pick ups, and 9 supports and ancillaries. • EN-MME very proactive on 316 LN raw material procurement problem. First two items will be 304 L of a different production method. • Installation schedule meeting planned for next week. Ring Orbit Electronics • To be installed in EYETS – VXS crate procurement is being worked on. • Planned to be ready for 2017 start up. Cost review for instrumentation to be done.

Injection Pick Ups #2 #1 (ITE line) #3 #4 (ETL line) #5 #6 #7

Injection Pick Ups #2 #1 (ITE line) #3 #4 (ETL line) #5 #6 #7 Ions § 9 BPMs TO BE INSTALLED ON ITE, ETL, EI LINES § 2 (#1, #2) TO BE INSTALLED DURING EYETS (ITE by March 2017), or TS 1 2017 #8 (EI line) #9

Low Level RF • MDs on 2 cavity operation has shown limitation on aperture

Low Level RF • MDs on 2 cavity operation has shown limitation on aperture in dispersive regions. • Decision is not to ask for 2 cavities for operation, but maintain possibility for MDs. • Modulated frequency capture could further increase the extracted intensity. Delivered to the LHC. • Critical consolidation issue for LLRF for Linac 3 energy ramping. RF need to make a proposal, especially considering manpower limitations. S Albright

LBS Line • ECR on vacuum modifications being prepared (waiting for integration finalisation). Production

LBS Line • ECR on vacuum modifications being prepared (waiting for integration finalisation). Production is launched. • Handling (removal of LTL and installation in LBS) clarified during connection of Linac 4, and the tooling availability understood. • Handling design starts 2017. • Controls specification for LBS beam transfer on-going.

Dump • 3 Dumps fabricated. • Design of the bending Y chamber is with

Dump • 3 Dumps fabricated. • Design of the bending Y chamber is with MME vacuum design team, to be done early 2017. • ECR prepared, integration pending Y-Chamber final design – more efficient to finish and avoid SRR. • Controls solution for destination selection being worked on. • Discussion to improve slits after source (refurbishment and improvement as diagnostics) to be made very soon.

2018 MDs and Operation • Longer operation in 2018, especially for SPS MDs. •

2018 MDs and Operation • Longer operation in 2018, especially for SPS MDs. • Make a proposal. • Discuss with critical groups (OP, ABP, RF). • Put on the table at Chamonix (Hannes talk)?

Options • Coming to the end of the study period. • Use the study

Options • Coming to the end of the study period. • Use the study reviews planned for January and February to reach conclusions on these (three review meetings being planned). • Discussion with STI is requested sooner (early January).

Topic Linac 3 Slits Beam stoppers Group LIU Budget EN-STI 200 EN-STI Power Convertors

Topic Linac 3 Slits Beam stoppers Group LIU Budget EN-STI 200 EN-STI Power Convertors for TE-EPC RF systems for additional cavity Power converters / Magnets for ITL steerers TE-EPC / TE-MSC BE-BI Decision Point The earlier decided, the easier to get manpower from STI 200 Is consolidation N/A To be proposed for consolidation If we want to use 2 cavities for production, need a 170 third spare converter. EPC can divert their End 2016, after consolidation resources to 2 cavity tests. this? End 2016, after 2 cavity tests. By end 2016 150 Comment To improve ITL slits for more accurate guillotine scans after the source, the only known option for single 500 particle type profile measurement Early 2017 If we want to use 2 cavities for production, need a third spare converter. BE-RF Microwave generator spare BE-ABP Improved Source Diagnostics 90 Consolidation budget Benefit for LIU 2018 Study foreseen in next weeks.

Thanks To R. Alemany Fernandez, M-E. Angoletta, J. Axensalva, S. Albright, H. Bartosik, G.

Thanks To R. Alemany Fernandez, M-E. Angoletta, J. Axensalva, S. Albright, H. Bartosik, G. Bellodi, N. Biancacci, A. Blas, M. Bodendorfer, M. Bozzolan, J. Broere, C. Carli, J-M. Cravero, P. Dahlen, A. Findlay, A. Dworak, A. Frassier, S. Gilardoni, S. Hancock, B. Holzer, A. Huschauer, D. Kuchler, M. Jaussi, S. Jensen, V. Kain, M. Maintrot, D. Manglunki, J. Marques, C. Mastrostefano, A. Michet, M. Migliorati, R. Mompo, M. O’Neil, S. Pasinelli, A. Perillo, G. Piccinini, T. Rijoff, F. Roncarolo, G. Rumolo, S. Sadovich, L. Soby, G. Sterbini, L. Timeo, V. Toivanen, G. Tranquille, F. Wenander, M. Zerlauth, + more….