LIU DAY WELCOME Welcome Frdrick Bordry LIU Day
LIU DAY WELCOME Welcome Frédérick Bordry LIU Day– 11 th April 2014 1
LS 1 from 16 th Feb. 2013 to Dec. 2014 16 th Feb. 11 th April 2013 2014 2015 F M A M J J A S O N D J F M A LHC SPS PS PS Booster beam to beam available for works Physics Beam commissioning Welcome Frédérick Bordry LIU Day– 11 th April 2014 Shutdown Powering tests 2
The European Strategy for Particle Physics Update 2013 c) LHC, including the high-luminosity upgrade of the machine and detectors with a ten times more data than in the initial design, by around 2030. This upgrade programme will also provide view to collecting further exciting opportunities for the study of flavour physics and the quarkgluon plasma. HL-LHC from a study to a PROJECT 300 fb-1 → 3000 fb-1 including LHC injectors upgrade LIU (Linac 4, Booster 2 Ge. V, PS and SPS upgrade) Welcome Frédérick Bordry LIU Day– 11 th April 2014 3
today “…exploitation of the full potential of the LHC, including the high-luminosity upgrade of the machine and detectors…” => High Luminosity LHC project Project Kick-off meeting: 11 th Nov. 2013 (Daresbury) http: //cern. ch/hilumilhc Welcome Frédérick Bordry LIU Day– 11 th April 2014 4
LHC roadmap: schedule beyond LS 1 LS 2 starting in 2018 (July) LS 3 LHC: starting in 2023 Injectors: in 2024 => 18 months + 3 months BC => 30 months + 3 months BC => 13 months + 3 months BC Physics Shutdown Beam commissioning Technical stop (Extended) Year End Technical Stop: (E)YETS 30 fb-1 YETS EYETS Run 2 2 Run YETS LS 2 Run 3 3 PHASE 1 YETS LS 3 Run 4 300 fb-1 LS 4 PHASE 2 Run 5 LS 5 3’ 000 fb-1 Welcome Frédérick Bordry LIU Day– 11 th April 2014 5