LIU BWS Func Specs Status Remarks Plans FR
LIU BWS Func. Specs Status, Remarks, Plans FR – 08 -Nov-2019
Status § PSB EDMS PSB-BWSRF-ES-0001 approved § PS EDMS PS-BWSRB-ES-0001 Version 1 circulated § SPS draft document (+ already some SW specs for OP-GUI mockup)
Status Working on general tech specs document 11/23/2020 Document reference 3
Remarks § “Inconsistency” between PSB and PS required accuracy/precision (100 um vs 20 um, more details in M. F. ’s comments on PS EDMS) § How to cope with PS RF harmonics and gymnastics under discussion § Interface to OP GUI: ~advanced for SPS (last to start!) less advanced with PSB and PS § (to-be-agreed/accepted) Final Func. Specs: • • ~little influence on control FW(s) Heavily affecting PMT DAQ FW and SW 11/23/2020 Document reference 4
Plan § Produce summary table comparing 3 machines specs à à § Evaluate pro&cons (and feasibility) of common FW and SW blocks Clarify trigger/timing differences (e. g. sync. to RF, BST/no BST etc…) Reiteration on PS specs, dedicated BI-TB à OP-ABP to clearly explain expected long. Structures and bunch patterns § SPS Func specs to converge into EDMS doc. § Advance (ASAP) PSB OP-GUI – FESA interface § BI to produce engineering specs (ideally matching func. Specs) 11/23/2020 Document reference 5
- Slides: 5