LIGO commissioning update Nicolas Smith LIGO MITLHO LVC

  • Slides: 10
Download presentation
LIGO commissioning update Nicolas Smith LIGO MIT/LHO LVC Amsterdam Sep. ’ 08 LIGO-G 080460

LIGO commissioning update Nicolas Smith LIGO MIT/LHO LVC Amsterdam Sep. ’ 08 LIGO-G 080460 -00 -D

motivation recap • S 5 done, time before a. LIGO – incremental increase of

motivation recap • S 5 done, time before a. LIGO – incremental increase of sensitivity – factor of 2 range would give factor ~8 in detected volume • prototype new systems • increase power, DC readout, fix some known noises 2 Nicolas Smith – LVC Sep. ‘ 08

milestones • magnets and EQ stops swapped • baffles installed • faradays upgraded •

milestones • magnets and EQ stops swapped • baffles installed • faradays upgraded • 35 W PSLs installed • new TCS ongoing • HAM-ISIs installed • OMCs installed • DC Locked IFOs 3 Nicolas Smith – LVC Sep. ‘ 08

4 Nicolas Smith – LVC Sep. ‘ 08

4 Nicolas Smith – LVC Sep. ‘ 08

upconversion • 1/f^4 model, scales with i^(3/2). current (m. A) pre-swap predicted coefficient measured

upconversion • 1/f^4 model, scales with i^(3/2). current (m. A) pre-swap predicted coefficient measured ratio 1. 1 3. 8 1 5. 1 38 3. 1 1/12 18. 3 260 18 1/14 • see July 17 LHO elog 5 Nicolas Smith – LVC Sep. ‘ 08

dc readout – immunity to sideband/carrier overlap – reduction of junk light causing additional

dc readout – immunity to sideband/carrier overlap – reduction of junk light causing additional shot noise – reduce some technical noise couplings while introducing some new ones – see July 8 LLO elog for preliminary results 6 Nicolas Smith – LVC Sep. ‘ 08

DC readout hardware • septum – low R <100 ppm, low scattering – isolates

DC readout hardware • septum – low R <100 ppm, low scattering – isolates volume • ISI – single stage, active isolation • TTs – alignment controls • OMC-SUS – double pendulum – low <10 Hz eigenfrequencies • OMC – monolithic cavity, ULE breadboard – in-vac, high QE, 3 mm DC-PDs – finesse ~350, 380 MHz FSR, g ~0. 75 • a. LIGO style control system hardware/software 6 Nicolas Smith – LVC Sep. ‘ 08

issues • OMC alignment control – using TTs simultaneously as steering mirrors and telescope

issues • OMC alignment control – using TTs simultaneously as steering mirrors and telescope • input optic jitter – how much is tolerable? 8 Nicolas Smith – LVC Sep. ‘ 08

still to do • noise hunting/budgeting • high power largely unexplored – may cause

still to do • noise hunting/budgeting • high power largely unexplored – may cause problems in IFO alignment servos – tune TCS heating • make permanent switch to DC • beat S 5 9 Nicolas Smith – LVC Sep. ‘ 08

10 Nicolas Smith – LVC Sep. ‘ 08