LIGO and LCGT collaboration Hiro Yamamoto LIGO Lab
LIGO and LCGT collaboration Hiro Yamamoto / LIGO Lab l Based on the meeting at Caltech on Sep. 8 th to discuss about the productive collaboration for LIGO and LCGT » Kuroda, Nakatani, Jay, Albert, Stan, Dave Reitze (LSC), David Shoemaker (a. LIGO), Hiro l l Under negotiation for the final agreement Specifics of the collaboration are not included in the MOU/attachment ⇦ my talk is about the guideline of this issue » Each activity/visit/instance will be accompanied by a requesting letter and an accepting letter from the respective directors. l MOU is symmetric between two parties » All my slides should be duplicated by exchanging LIGO and LCGT LIGO-G 1000839 -v 1 LCGT-G 1000174 -v 1 Hiro Yamamoto at LCGT f 2 f mtg @ ICRR on September 28 th, 2010 1
Procedure to arrange specific resource exchange When LCGT invites people from LIGO, sends people to LIGO, and acquires knowledge from LIGO (MOU/attachment item 4, 5 and 6) 1. Every three months, LCGT sends an official request to LIGO with a list of prioritized items » This is to avoid cases that low priority requests submitted earlier would not compromise higher priority requests which come out later. » Emergency requests will be sent as needed. 2. 3. LIGO will review the request and will issue a formal answer to LCGT. Items agreed between LIGO and LCGT will be documented in a web page with proper documents referenced. LIGO-G 1000839 -v 1 LCGT-G 1000174 -v 1 Hiro Yamamoto at LCGT f 2 f mtg @ ICRR on September 28 th, 2010 2
Collaboration by understanding both are very busy projects with limited resources Oct 2010 L 1 H 2 H 1 Jul 2013 PSL/ IO table Install IMC Install Rec’ld vertex MICH Full interferometer Visits from LCGT staff to the LIGO Lab to learn about Advanced LIGO are welcome, but will need 6 months planning and a mutual understanding to ensure both a PSL/ Rec’ld and also of IO vertex Installsuccessful Singlelearning arm cavity experience IMC Installa minimum Full interferometer table MICH distraction from the Advanced LIGO Project. Squeezer install Squeezing Test Install PSL/ IO table Install IMC Install Rec’ld vertex MICH From LIGO-G 1000459 -v 2 LIGO-G 1000839 -v 1 LCGT-G 1000174 -v 1 Hiro Yamamoto at LCGT f 2 f mtg @ ICRR on September 28 th, 2010 3
Joining LIGO activities Oct 2010 L 1 H 2 H 1 Full a. LIGO PSL/installation IO table Install IMC Install Rec’ld vertex MICH Jul 2013 Full interferometer Single arm lock PSL/ using green laser Rec’ld Install Single arm cavity Squeezer install Squeezing Test IO table IMC Install vertex MICH e. LIGO PSL/ with squeezing Install IO table Install IMC Full interferometer Install Rec’ld vertex MICH Visitors who wish to join teams assembling, testing, installing, and commissioning Advanced LIGO hardware can participate fully as members of the teams, following LIGO safety, documentation, and configuration and contamination control. LIGO-G 1000839 -v 1 LCGT-G 1000174 -v 1 4 Hiro Yamamoto at LCGT f 2 f mtg @ ICRR on September 28 th, 2010
Procedures of LCGT visitors to Adv LIGO l l Contact with David Shoemaker to identify good Advanced LIGO partners and to check on timing Schedule of the trip should be agreed upon before the visit. Minimize the time and maximize the efficiency of the interaction with a. LIGO people by properly preparing before and during the visit. If LCGT visitors can help accomplish Advanced LIGO scope while visiting, it is of course very welcome; all these activities must be coordinated in advance with the Advanced LIGO staff, though. LIGO-G 1000839 -v 1 LCGT-G 1000174 -v 1 Hiro Yamamoto at LCGT f 2 f mtg @ ICRR on September 28 th, 2010 5
Human resources from LIGO lab l Riccardo » Detail scheduling of visiting Japan under way l Hiro » Same levels of commitments as until now » on demand support in modeling and optics, exchanging information between LIGO and LCGT, and attending LCGT meetings l It is very difficult to expect any other commitments of LIGO Lab personnel » a. LIGO has barely enough people to build a. LIGO on schedule » Support may be needed for LIGO-Australia LIGO-G 1000839 -v 1 LCGT-G 1000174 -v 1 Hiro Yamamoto at LCGT f 2 f mtg @ ICRR on September 28 th, 2010 6
LIGO DCC l l DCC access privilege is currently tied to access privileges to web sites containing data, so there is no simple way to provide a special LCGT privilege setup to access only LIGO DCC for now. All DCC documents appropriate for access by LCGT will be assigned public access privilege. Non-public ones either contain LIGO-private information or are not useful outside the Laboratory. There is an internal review process to make a document pubic (e. g. , check to see that there are no copyrighted issues, etc), so there may be some (usually short) time lag to become public. When some documents are needed that are not yet public, make a direct request to David Shoemaker, Hiro or the authors of the document. LIGO-G 1000839 -v 1 LCGT-G 1000174 -v 1 Hiro Yamamoto at LCGT f 2 f mtg @ ICRR on September 28 th, 2010 7