Life Cycle Logistics 1 The Total Life Cycle

  • Slides: 9
Download presentation
Life Cycle Logistics 1

Life Cycle Logistics 1

The Total Life Cycle Systems Management Initiative TLCSM Definition: TLCSM is the implementation, management,

The Total Life Cycle Systems Management Initiative TLCSM Definition: TLCSM is the implementation, management, and oversight, by the designated PM, of all activities associated with the acquisition (I. e. , development, production, fielding, sustainment, and disposal) of a Do. D weapon or materiel system across its life cycle. Reference: TLCSM Guidance Template 2

Total Life Cycle Systems Management (TLCSM) The 5000 Model User Needs & Technology Opportunities

Total Life Cycle Systems Management (TLCSM) The 5000 Model User Needs & Technology Opportunities A (Program B Initiation) Concept Technology Refinement Development C IOC Production & Deployment System Development & Demonstration Concept Refinement Decision Critical Design Review Pre-Systems Acquisition ICD ICD: Initial Capabilities Document CDD: Capabilities Development Document CPD: Capabilities Production Document IOC: Initial Operating Capability FOC: Full Operating Capability LRIP: Low-Rate Initial Production OT&E: Operational Test and Evaluation FRP: Full Rate Production CDD LRIP/OT&E FRP Decision Review FOC Operations & Support/ Disposal Sustainment CPD 3

Total Life Cycle Systems Management (TLCSM) TLCSM – Before and After Before TLCSM ………

Total Life Cycle Systems Management (TLCSM) TLCSM – Before and After Before TLCSM ……… PM’s Role Diminishes A C B Initiation) Concept Technology Refinement Development FOC IOC Production & Deployment System Development & Demonstration Concept Refinement Decision Critical Design Review Pre-Systems Acquisition LRIP/OT&E FRP Decision Review Operations & Support/ Disposal Logistics Infrastructure Transition Sustainment After TLCSM ………. PM’s Role Continues A C B Initiation) Concept Technology Refinement Development Concept Refinement Decision Pre-Systems Acquisition M D S E C I TL PL P A System Development & Demonstration Critical Design Review FOC IOC Production & Deployment LRIP/OT&E Systems Acquisition FRP Decision Review Operations & Support/ Disposal Evolutionary 4

Application of TLCSM In the Weapon System Life Cycle Concept Refinement Phase and Technology

Application of TLCSM In the Weapon System Life Cycle Concept Refinement Phase and Technology Development Phase Key Logistics activities that must be completed before MS B: • Preparation and/or assessment of sustainment planning and parameters in the Capabilities Development Document (CDD) • Description of the product support strategy documented in the Acquisition Strategy (ASR) • Description of the appropriate logistics metrics, criteria, and funding requirements in the Acquisition Program Baseline (APB). • Description of the appropriate logistics considerations and test points in the Test and Evaluation Master Plan (TEMP) 5

TLCSM In the Weapon System Life Cycle System Development and Demonstration (SDD) Phase Key

TLCSM In the Weapon System Life Cycle System Development and Demonstration (SDD) Phase Key Logistics activities that must be completed before MS C: • Updated support strategy within the Acquisition Strategy (ASR) • Updated logistics criteria and parameters in the Acquisition Program Baseline (APB) • Logistics and overall sustainment requirements referenced in the Capabilities Production Document (CPD) • Logistics parameters and test points included in the Test and Evaluation Master Plan (TEMP). • Acceptable performance in development, test and evaluation, and operational assessment, to include: - Mature software capability. - Acceptable interoperability. - Acceptable operational supportability. • Demonstration that the system is affordable throughout the life cycle, optimally funded, 6 and properly phased for rapid acquisition.

TLCSM In the Weapon System Life Cycle Production and Deployment Phase Key Logistics activities

TLCSM In the Weapon System Life Cycle Production and Deployment Phase Key Logistics activities that must be completed or updated before Operations and Support Phase: • Satisfaction of sustainment criteria addressed in Initial Operational Test and Evaluation (IOT&E). • Performance Based Logistics Agreements (PM, Product Support Integrator, War fighter and Support Providers). • Fully funded sustainment program. • Pre-Initial Operational Capability (IOC) Review - This review performed at Service – level is carried out to: - Confirm design maturity of the system. - Determine status of correction of any deficiencies identified. - Confirm configuration control. - Certify Product Support Integrator/Providers plans to meet war fighter requirements. - Verify Product Support Integrator/Provider agreements/ contracts and funding in place. 7

TLCSM In the Weapon System Life Cycle Post IOC Sustainment Strategies • Conduct re-assessment

TLCSM In the Weapon System Life Cycle Post IOC Sustainment Strategies • Conduct re-assessment of the existing support strategy vis-à-vis new system performance and support requirements at each evolutionary phase; Make changes as necessary. • Address the support implications of the logistics support strategy for both the initial block and follow-on incremental deliveries. 8

TLCSM In the Weapon System Life Cycle Post Deployment Reviews • Services shall conduct

TLCSM In the Weapon System Life Cycle Post Deployment Reviews • Services shall conduct periodic assessments of system support strategies considering actual vs. expected levels of performance and support. • These reviews occur nominally every three to five years after IOC or when precipitated by changes in requirements/design or performance problems, and should include: - Product Support Integrator/Support Provider performance. - Product improvements incorporated. - Configuration control. - Modification of performance based logistics agreements as needed. 9