Current setup at Cockroft (“version 2”) 3 D model: Tom Dodington

Current setup at Cockroft (“version 2”) 3 D model: Tom Dodington

Slide: Hao Zhang n. XDS 10 i scroll pump from Edwards HIPACE 300 L/s

Slide: Hao Zhang n. XDS 10 i scroll pump from Edwards HIPACE 300 L/s SP 25 K Speedivalve 2 m 25 KF hose This Channel is used for initial pumping, will be turned of when Turbo turns on. DN 16 ISO-KF to DN 25 KF adaptor DN 100 – DN 40 CF adaptor and DN 40 CF to KF 25 adpator SP 25 K Speedivalve HIPACE 300 L/s DN 16 ISO-KF to DN 25 KF adaptor SP 25 K Speedivalve 1 m 25 KF hose n. XDS 15 i scroll pump from Edwards HIPACE 700 1 m 25 KF 700 L/s SP 25 K Speedivalve hose KF 25 Tee 0. 5 m 25 KF hose n. XDS 15 i scroll pump from Edwards HIPACE 300 L/s HIPACE 700 L/s DN 16 ISO-KF to DN 25 KF adaptor SP 25 K Speedivalve HIPACE 300 700 L/s SP 25 K Speedivalve 2 m 25 KF hose 0. 75 m 25 KF hose 2* KF 25 Tee 1 m 25 KF hose n. XDS 15 i scroll pump from Edwards

Dump area ~1 E-5 mbar max. 1 E-3 mbar nozzle sk 1 im ~1

Dump area ~1 E-5 mbar max. 1 E-3 mbar nozzle sk 1 im ~1 E-7 mbar 2 im sk Gauge: 2 x. Penning + Pirani 5 10 bar injection 32 mm Interaction chamber blackened tube 2 DN 63 CF/KF adpt. separa tor con e DN 63 3 DN 63 63/100 adpt. TMP 300 l/s DN 63 min. spacing 200 mm 1 Backscattering reducer 4 ~1 E-9 mbar Between skimmers 2 -3 V 3 goal: DN 63 valve with ~25 mm backscattering reducer The 90 -deg turn can be replaced by tilted turbo, to be finalized V 3 goal: use DN 63 valve Gauge: 2 x. Penning + Pirani 3 Gauge: 2 x. Penning + Pirani Between skimmers 1 -2 Gauge: Penning 2 V 3 goal: use flat skimmer instead of pyramidshape Gauge: Piezoelectric (? ) Hi-pressure nozzle primary from CERN Hao: experimental skim 3 Ne V 3 goal: most probably primary only 1 4 5 DN 63 63/100 adpt. DN 63 TMP 300 l/s 63/100 adpt. TMP Gauge: Penning + Pirani 300 l/s Primary • Leak det. valve • 2 venting valves Primary • Leak det. valve • 2 venting valves V 3 goal: DN 63 opening, DN 63 ->100 adaptor and 300 l/s pumps Primary • Leak det. valve • 2 venting valves

Goal: • Imitate version 3 schematics with experimental setup • Get “matrix of pressures”

Goal: • Imitate version 3 schematics with experimental setup • Get “matrix of pressures” at every step • Change 1 parameter at a time • Pressures as a function of injection pressure (0 -10 bar) • Each data point with e-gun off/on

DN 100 gasket with 63 hole I don’t think DN 160 gasket with 63

DN 100 gasket with 63 hole I don’t think DN 160 gasket with 63 mm hole needed since there is 3 skimmer upstream DN 160 gasket with 32 mm hole Hi. PACE 700 here with standard gasket before CERN Elbow arrived Hi. PACE 700 with 63 mm hole gasket here before CERN Primary pump arrived DN 160 to DN 100 adaptor + DN 100 gasket with 63 hole + Hipace 300 Slide: Hao Zhang

TE-VSC: Testing dry pump Images: Eric Page

TE-VSC: Testing dry pump Images: Eric Page