Level-1 Calorimeter Trigger: Monitoring and Commissioning o Production Testing o Initial Cable Testing o

Level-1 Calorimeter Trigger: Monitoring and Commissioning o Production Testing o Initial Cable Testing o Full System Installation o Commissioning with Detectors o Timescales: My Opinion – don’t quote me! 27 th November, 2005 Stephen Hillier 1

Production Testing o Timescale: Now to mid-2006 Small scale setups in several labs o

Production Testing o Timescale: Now to mid-2006 Small scale setups in several labs o Testing based on: o o o Monitoring tools used: o o Standalone programs More complex test runs Manual production database maintenance Raw histogram publication ROD crate level data Event sampling at ROS level Current Tools sufficient o But our sampling code needs upgrading 27 th November, 2005 Stephen Hillier 2

Initial Cable Testing o Timescale: o o o Tile Calorimeter trigger cables ~Oct 2005

Initial Cable Testing o Timescale: o o o Tile Calorimeter trigger cables ~Oct 2005 to early 2006 Liquid Argon cables Jan 2006 to mid 2006 Delicate Analogue signals Need to check integrity, crosstalk, calibration, timing etc Currently uses standalone tools o o ROD crate DAQ like readout Private database code o We hope to improve tools: o o 27 th November, 2005 More automation Interface to proper database Full ROD crate DAQ Histograms Stephen Hillier 3

Full System Installation o o Timescale: Jan to mid-2006 Monitoring Requirements similar to current

Full System Installation o o Timescale: Jan to mid-2006 Monitoring Requirements similar to current lab tests o o Histograms o o Just on a larger scale Produced by ROD crates Produced from ROS event sampling Archiving might start to be useful Effort needed (by us!) o o New eformat interface Move to GNAM 27 th November, 2005 Stephen Hillier 4

Commissioning with Detectors o Timescale: partially starts in October 2005 o o o Requires

Commissioning with Detectors o Timescale: partially starts in October 2005 o o o Requires correlation histograms o o o But real work will probably start mid-2006 Would be nice to prototype sooner Common calorimeter/trigger runs Sampling of built events High level event decoding (ATHENA) Event display useful Partially achieved at testbeam o But will not lots of updating 27 th November, 2005 Stephen Hillier 5