River Park Leisure Centre • More than 40 years old • Limited ability to meet the needs of a growing population • Range of options considered
City Council Objectives • To expand facilities to meet existing demand estimated local population growth up to 2030 • To increase participation in sport and physical activity • To improve the quality and efficiency of District’s main leisure facility • To improve the wellbeing of the local community, through access to high quality leisure facilities
Update • September 2015 WCC Cabinet decided the preferred location for a leisure centre, if affordable and deliverable, is to the east of the University of Winchester Sports Stadium, at Bar End. • July 2016 the facility mix of the centre was agreed • November 2016 the owner of the Garrison Ground agreed terms to sell the site to WCC
Current Preferred Option – March 2016
Issues and Opportunities
Update • Consultation: – Land Owners, Key Stakeholder and Partners – Leisure Centre Users – Sports Clubs – University Students – National Governing Bodies of Sport – Residents (Highcliffe and neighbours to the site) • Technical Studies • Financial Options Review and Business Case
Facility Mix • • • 50 m Pool, Teaching Pool and Water Play Area Sports Hall - 12 Badminton Courts 4 Squash Courts 180 Station Gym 4 Studios Hydrotherapy Treatment Rooms Soft Play Wet Side & Dry Side Changing Rooms Reception and Café
Swimming Pool Option Pools Leisure Water play area Community Pool / Teaching Pool 20 m x 10. 5 m Main Pool 50 m x 8 lanes Gallery Seating for Spectators 400 seats Temporary Poolside Seats (for competitors and officials) 250 seats
Additional Suggested Facilities • Second Full Size Artificial Turf Pitch • Tennis Courts • Gymnastics Hall • Indoor Athletics Hall • Boxing Gym Built Facilities Audit and Strategy
Next Stages • Agree Location • Concept Design / Workshops – inc. clubs • Seek Approval to Submit Planning Application • Technical Design and Construction
Thank You Any Questions?