LCLS PPS/BCS Requirements Discussion • LCLS Beam line Diagrams • LCLS Personnel Protection System Requirements – Injector to Near Hall, ESD 1. 1 310 -r 0 *, Patrick Krejcik • LCLS Personnel Protection Systems Requirements X-ray Transport, Far Hall, Stephan Moeller • LCLS Beam Containment System Requirements – ESD 1. 1 -311 – (Author to be assigned) • Radiation Physics Department Comments, Stan Mao • Summary & Action Items * http: //www- ssrl. slac. stanford. edu/lcls/internals/documents/prd/ Oct. 24, 2005 LCLS PPS/BCS Requirements Discussion Robert W. Fuller RWF@SLAC. Stanford. Edu
LCLS Beam Line – Phase 1 Aug – Nov. ‘ 06 6 Me. V 135 Me. V rf gun 14. 1 Ge. V Linac-X L =0. 6 m TCa v , B -A L 0 Linac-0 L =6 m 4. 54 Ge. V 250 Me. V Linac-1 L 9 m X Spect. Linac-3 L 550 m 21 -3 b 24 -6 d 25 -1 a 30 -8 c BC-1 L 6 m BC-2 L 22 m SLAC linac tunnel PPS LCLS PPS/BCS Requirements Discussion undulator LTU L =275 m Phase 1, 2006 down Oct. 24, 2005 T-Cav 21 -1 b 21 -1 d Linac-2 L 330 m Dump research yard BCS Robert W. Fuller RWF@SLAC. Stanford. Edu
LCLS Beam Line – Phase 2 Sept. – Nov. ‘ 07 6 Me. V 135 Me. V rf gun 14. 1 Ge. V Linac-X L =0. 6 m TCa v , B -A L 0 Linac-0 L =6 m 4. 54 Ge. V 250 Me. V Phase 2, 2007 down Linac-2 L 330 m Linac-1 L 9 m X Spect. BC-1 L 6 m 21 -3 b 24 -6 d BC-2 L 22 m T-Cav 21 -1 b 21 -1 d Linac-3 L 550 m Phase 2, 2007 down SLAC linac tunnel PPS Oct. 24, 2005 LCLS PPS/BCS Requirements Discussion undulator 25 -1 a 30 -8 c LTU L =275 m Dump research yard BCS Robert W. Fuller RWF@SLAC. Stanford. Edu
LCLS Beam Line - Phase 3 6 Me. V 135 Me. V rf gun 14. 1 Ge. V Phase 3, CF completion Linac-X L =0. 6 m TCa v , B -A L 0 Linac-0 L =6 m 4. 54 Ge. V 250 Me. V Linac-1 L 9 m X Spect. Linac-3 L 550 m 21 -3 b 24 -6 d 25 -1 a 30 -8 c BC-1 L 6 m BC-2 L 22 m PPS LCLS PPS/BCS Requirements Discussion undulator LTU L =275 m SLAC linac tunnel Oct. 24, 2005 T-Cav 21 -1 b 21 -1 d Linac-2 L 330 m Dump research yard BCS Robert W. Fuller RWF@SLAC. Stanford. Edu
LCLS Project Commissioning Milestones Injector Drive Laser – Commissioning – 4/06 thru 11/06 (Requires Laser Safety System Certification) Injector & BC 1 (S 21), Commissioning – 12/ 06 thru 7/07 (May also require BCS modifications) S 21 thru S 30 (BSY SL 1/Sl 2) Commissioning – 12/07 thru 3/08 LTU – Commissioning – 4/08 thru 5/08 Undulator & Dump – Commissioning – June ‘ 08 FEE – Commissioning – June ‘ 08 Near Hall – Commissioning – June ‘ 07 X-ray transport – Commissioning – Nov. ‘ 07 Far Hall – Commissioning – Sep. ‘ 07 Oct. 24, 2005 LCLS PPS/BCS Requirements Discussion Robert W. Fuller RWF@SLAC. Stanford. Edu
Upcomming Activities PPS Conceptual Design Review – November ’ 05 target PPS PLC Safety System Review – To be scheduled BCS Conceptual Design Review – To be scheduled Detailed design reviews Injector & BC 1 (S 21), Linac S 22 thru S 30 – first to be scheduled Other areas - to be scheduled Oct. 24, 2005 LCLS PPS/BCS Requirements Discussion Robert W. Fuller RWF@SLAC. Stanford. Edu
Summary & Action Items Beam Containment System needs resource assignment, definition and review. PPS conceptual design review team and review to be finalized and scheduled, (early November target date). Work Group formation to continue advancement on critical issues? Other action items? Oct. 24, 2005 LCLS PPS/BCS Requirements Discussion Robert W. Fuller RWF@SLAC. Stanford. Edu