Main Resources Electronic CAD (Sun + Cadence) DS 20 ESA 12000 FC 1, 5

Main Resources Electronic CAD (Sun + Cadence) DS 20 ESA 12000 FC 1, 5 TB HDS 9570 FC 4 TB Gb Ethernet • NFS • SMB • Appletalk • www • Mail • Print Linux Experiments (30 CPUs) GRID Fram (10 CPUs) DS 20 e Xterm Alpha Experiments (8 CPUs) Mac (100) PC (300) 100 Mb 10 Mb 24/5/2004 LAL Site Report - HEPix - Edinburgh 2004 LSF Cluster 100 Go

Main Resources Changes • More Linux CPUs – 25 dual Opteron 2, 2 on

Main Resources Changes • More Linux CPUs – 25 dual Opteron 2, 2 on order (IBM E 325, 1 U) • More TBs – HDS 9570 V : 2, 5 TB added • Running very well • Less budget… – Budget uncertainty (always changing) • No OS upgrade since last meeting 24/5/2004 LAL Site Report - HEPix - Edinburgh 2004

Mail Service • Virus/Spam filtering production – Spam Assassin + Mime. Defang – Tunning

Mail Service • Virus/Spam filtering production – Spam Assassin + Mime. Defang – Tunning in progress to increase efficiency (~70%) • Late with all our main projects for mail service – SIEVE for filtering at message delivery (server based) – Upgrade IMAP server to Cyrus v 2 • Required for SIEVE filtering – Authenticated SMTP • Conversion of our current SASL db for transparent user migration with same password db for IMAP and Sendmail 24/5/2004 LAL Site Report - HEPix - Edinburgh 2004

Windows Infrastructure • IN 2 P 3 forest in production – – 9 labs

Windows Infrastructure • IN 2 P 3 forest in production – – 9 labs in production (8 sites) 4 labs should join shortly (by the end of June) No problem so far… Forest management not to heavy • Domain management delegated to labs • Move of LAL domain to IN 2 P 3 forest delayed – Planned this summer – Challenge : transparent to users, preserving GPOs – Back to NT 4 domain and reupgrade to Active. Directory (2003) 24/5/2004 LAL Site Report - HEPix - Edinburgh 2004

Virus • Not too much affected – – Ports attacked filtered in border router

Virus • Not too much affected – – Ports attacked filtered in border router 2 PCs infected by Sasser outside LAL Checking is time consuming… Proactive patch installation is critical • Main tool : SMS – Rapid deployment of fixes : 2 hours for 90% of running PCs – Integrating SMS and SUS : SUS feature pack • SUS integrated with SMS inventory and logging capabilites 24/5/2004 LAL Site Report - HEPix - Edinburgh 2004

Resources Monitoring • Operation Control Center (Tableau de bord) – LAL Solution based on

Resources Monitoring • Operation Control Center (Tableau de bord) – LAL Solution based on Nagios and RRDTools – HTML front end with a service oriented view • Grouping / aggregation of Nagios status – Alerts and notifications capabilities – Proactive/corrective actions associated with alerts – Performance data with RRDTools (former MRTG) • Services monitored by plugins – Almost everything can be monitored – No platform / OS dependency • Remote execution of plugins through SSH 24/5/2004 LAL Site Report - HEPix - Edinburgh 2004

Operation Control Center 24/5/2004 LAL Site Report - HEPix - Edinburgh 2004

Operation Control Center 24/5/2004 LAL Site Report - HEPix - Edinburgh 2004

Operation Control Center 24/5/2004 LAL Site Report - HEPix - Edinburgh 2004

Operation Control Center 24/5/2004 LAL Site Report - HEPix - Edinburgh 2004

GRID • Strong involvement from LAL in EDG / LCG / EGEE – 3

GRID • Strong involvement from LAL in EDG / LCG / EGEE – 3 FTE during EDG/LCG (including EDG Integration Team leader) – EGEE : 1 of the official french site, 2 FTE funded • 1 middleware, 1 application deployment – Fabric update : 26 CPUs to be added shortly (total : 36) • Mainly Xeon 3 Ghz and Opteron 2, 2 Ghz • Involved in a P 2 P computing project (Xtrem. Web) – – Partnership with LRI (Orsay, computing research) 1 FTE (LAL engineer preparing a PHD) 30 CPUs (mainly Xeon 3 Ghz and Opteron 2, 2 Ghz) LAL interest : use of P 2 P ressource as a fabric via OGSA 24/5/2004 LAL Site Report - HEPix - Edinburgh 2004

Miscellaneous Projects • Unattended Linux installation server – Currently based on Kickstart for initial

Miscellaneous Projects • Unattended Linux installation server – Currently based on Kickstart for initial installation – Still planning to investigate EDG WP 4 Quattor • Initial installation and updates • Servers and desktops • In conjunction with EGEE involvement (P. Ponianski may join LAL) • Automatic visitor registration and DHCP quarantine – Coupled with a rework of our computers database – Expected one fellow but he resigned after 2 weeks… 24/5/2004 LAL Site Report - HEPix - Edinburgh 2004