Kapsch Carrier. Com Introduction ■ Standardisation work needed to include ER-GSM band into relevant

Kapsch Carrier. Com Introduction ■ Standardisation work needed to include ER-GSM band into relevant Standards ■ ETSI TC RT activities closed ■ 3 GPP GERAN activities closed ■ ETSI MSG activities ongoing ER-GSM Mobile Network Operators 873 RTEGSM-R #18 | 880 ETSI & GERAN update on ER-GSM band introduction Mobile Network Operators 915 918 925 960 |2

Kapsch Carrier. Com Frequency ecosystem in the Standards 3 GPP step concluded GSM GPRS

Kapsch Carrier. Com Frequency ecosystem in the Standards 3 GPP step concluded GSM GPRS EDGE • TS 45. 001 • TS 45. 005 • TS 45. 008 (RF parameters) • TS 51. 010 • TS 51. 021 (conformance testing) TSG CT CN Function (VGCS, billing) • TS 24. 008 TC RT GSM railway TSG GERAN Change Request needed to refer to ERGSM band ETSI New version of 3 GPP specification referencing ERGSM band EN defining R-GSM band • 301 515 MSG European Harmonized Standards EN defining R-GSM band • 301 502 • 301 511 Harmonized Standard = applicable at EU level (signalling capabilities) RTEGSM-R #18 | ETSI & GERAN update on ER-GSM band introduction |3

Kapsch Carrier. Com 3 GPP GERAN activities ■ During 3 GPP GERAN #61 several

Kapsch Carrier. Com 3 GPP GERAN activities ■ During 3 GPP GERAN #61 several Change Requests were approved ■ CR to TS 51. 021 - Base Station System (BSS) equipment specification; Radio aspects ■ Minor discussions to come to an agreement on the final version ■ Coordinated/Uncoordinated deployment cases defined in BTS test specification ■ CR to TS 51. 010 -1 - Mobile Station (MS) conformance specification ■ Part 1: Conformance specification ■ Part 2: Protocol Implementation Conformance Statement (PICS) proforma specification Work Item on ER-GSM band introduction 100% completed RTEGSM-R #18 | ETSI & GERAN update on ER-GSM band introduction |4

Kapsch Carrier. Com ETSI MSG activities ■ New Work Item proposed to update Harmonised

Kapsch Carrier. Com ETSI MSG activities ■ New Work Item proposed to update Harmonised Standards ■ EN 301 502 "Harmonized EN for Base Station Equipment covering the essential requirements of article 3. 2 of the R&TTE Directive" ■ Update to reflect the inclusion of ER-GSM band in Rel-12 for BTS (taking into account restrictions on power emission) ■ EN 301 511 "Harmonized EN for mobile stations in the GSM 900 and GSM 1800 bands covering essential requirements under article 3. 2 of the R&TTE directive (1999/5/EC)" ■ Same activity on the MS side RTEGSM-R #18 | ETSI & GERAN update on ER-GSM band introduction |5

Kapsch Carrier. Com Next steps ■ ETSI TC MSG #39 meeting on 10 April

Kapsch Carrier. Com Next steps ■ ETSI TC MSG #39 meeting on 10 April (online meeting) ■ Continuation of the WI RTEGSM-R #18 | ETSI & GERAN update on ER-GSM band introduction |6

Kapsch Carrier. Com Thank you for your attention. Thomas Chatelet Railways Regulatory Affairs Railways

Kapsch Carrier. Com Thank you for your attention. Thomas Chatelet Railways Regulatory Affairs Railways Customer Solutions Management Kapsch Carrier. Com France SAS SITE DE IMMONTIGNY | 1 RUE JEAN PIERRE TIMBAUD | CS 80737 | 78066 SAINT QUENTIN EN YVELINES CEDEX Phone +33 (0)1 30 23 71 43 | Mobile +33 (0)6 64 04 78 81 E-mail thomas. chatelet@kapsch. net | www. kapsch. net | Titel der Präsentation Untertitel der Präsentation |