July 2016 doc IEEE 802 15 16 0575

  • Slides: 157
Download presentation
July 2016 doc. : IEEE 802. 15 -16 -0575 -00 103 rd Session of

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 103 rd Session of meetings of the IEEE 802. 15 Working Group for Wireless Specialty Networks July 24 -29, 2016 Manchester Grand Hyatt San Diego, CA, USA Submission Slide 1 Robert F. Heile, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 802. 15 Organization Chart

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 802. 15 Organization Chart To add your name to the WG/TG/SG/IG reflectors please go to www. ieee 802. org/15 802. 15 WG Chair Bob Heile, Wi-SUN Alliance 802. 15 Vice Chairs Rick Alfvin, Veri. LAN Pat Kinney, Kinney Consulting Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike Mc. Innis, Boeing STUDY GROUPS: SCs for New Projects (WNG), Maintenance, Rules Chair: Pat Kinney, Kinney Consulting Task Groups TG 3 d 100 Gbps PHY Thomas Kürner, Chair Technische Universität Braunschweig TG 3 e High Rate Close Proximty Chair: Andrew Estrada, Sony TG 3 m 15. 3 Revison 1 Chair: James Gilb, Gilb Consulting TG 4 s Spectrum Resource Use (SRU) Chair: Shoichi Kitazawa, ATR Wave Eng TG 4 t High(er) Rate PHY (HRP) Chair, Clint Powell, Powell Consulting TG 4 u India 865 -867 Band PHY (ISB) Chair, Phil Beecher, Wi- SUN Submission Working Group Technical Editor James Gilb TG 4 v Regional Sub Gig Bands (RSB) Chair, Phil Beecher, Wi-SUN Alliance TG 7 R Optical Wireless Communications Yeong Min Jang, Kookmin University Chair TG 8 Peer Aware Communications Chair: Myung Lee, CUNY TG 10 Layer 2 Routing Chair: Clint Powell, Self TG 12 Consolidated ULI Chair: Pat Kinney, Kinney Consulting Slide 2 INTEREST GROUPS IG Tera. Hertz (THZ) Chair: Thomas Kürner, Technische Universität Braunschweig IG Dependability (of Radio Links) Chair: Ryuji Kohno, IG High Rate Rail Communications Chair: Junhyeong Kim, ETRI IG 15. 4 Guide Chair: TBD STANDING COMMITTEES SC IETF Chair: Pat Kinney, Kinney Consulting SC WNG Chair: : Pat Kinney, Kinney Consulting SC Maintenance Chair: : Pat Kinney, Kinney Consulting SC Rules Chair: : Pat Kinney, Kinney Consulting Robert F. Heile, Wi-SUN Alliance Hibernating: TG 4 r 15. 4 ranging

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 San Diego Session Objectives

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 San Diego Session Objectives July 24 -29, 2016 TASK GROUP 3 d – 100 Gbps THz PHY 1. Review and Discuss Contributions from CFP 2. Update Project Plan/Timeline TASK GROUP 3 e –High Rate Close Proximity (HRCP) 1. Seek approval to start Sponsor Ballot 2. Update Project Plan/Timeline TASK GROUP 3 m – 15. 3 REVISIONa 1. Project complete awaiting publication Submission Slide 3 Robert F. Heile, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 San Diego Session Objectives

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 San Diego Session Objectives July 24 -29, 2016 TASK GROUP 4 s Spectrum Resource Utilization(SRU) 1. Work on Technical Guidance Doc (TGD) 2. Work on parts of draft 3. Update Project Timeline Task Group 4 t 15. 4 High(er) Rate PHY (HRP) 1. 2. Letter Ballot comment resolution Update Project timeline Task Group 4 u PHY for 865 -867 band in India 1. 2. 3. Submission Sponsor Ballot comment resolution Seek conditional approval to forward to Rev. Com Update project timeline as needed Slide 4 Robert F. Heile, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 San Diego Session Objectives

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 San Diego Session Objectives July 24 -29, 2016 Task Group 7 m Optical Wireless Communications (OWC) 1. 2. 3. Review and discuss contributions Continue developing TGD Generate/Update Project Timeline TASK GROUP-8 Peer Aware Communications 1. 2. Letter Ballot comment resolution Update Project Plan/Timeline TASK GROUP 9 –Key Management Protocol: 1. Submission Project complete-awaiting publication Slide 5 Robert F. Heile, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 San Diego Session Objectives

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 San Diego Session Objectives July 24 -29, 2016 TASK GROUP 10 --Layer 2 Routing (L 2 R): 1. Sponsor Ballot comment resolution 2. Update Project Plan/Timeline TASK GROUP 12 -15. 4 Upper Layer Interface (ULI) 1. Structure work plan and issue CFP 2. Joint Meeting with 802. 1 3. Create Project Plan/Timeline TASK GROUP 4 v –Add/Update Regional Sub Gig Bands 1. Review work plan 2. Review draft proposals 3. Update Project Plan/Timeline Submission Slide 6 Robert F. Heile, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 San Diego Session Objectives

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 San Diego Session Objectives July 24 -29, 2016 Dependability Interest Group: 1. Discuss Contributions 2. Evaluate if Study Group is warranted High Rate Railroad Communications IG 1. Discuss opportunities for standards work 2. Review ongoing mission of the group THz Interest Group: 1. Hear contributions relating to THz comms. 2. Review ongoing mission/goals/new project potential Submission Slide 7 Robert F. Heile, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 San Diego Session Objectives

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 San Diego Session Objectives July 24 -29, 2016 IETF Standing Committee 1. 2. 3. IETF 96 Outcomes Hear contributions Next steps NEW PROJECTS SUBCOMMITTEE (WNG) 1. Review/discuss contributions MAINTENANCE SUBCOMMITTEE 1. Review/discuss contributions RULES SUBCOMMITTEE 1. Submission Review/discuss contributions Slide 8 Robert F. Heile, Wi-SUN Alliance

July 2016 Submission doc. : IEEE 802. 15 -16 -0575 -00 Slide 9 Robert

July 2016 Submission doc. : IEEE 802. 15 -16 -0575 -00 Slide 9 Robert F. Heile, Wi-SUN Alliance

March 20 16 doc. : IEEE 802. 15 -16 -0575 -00 TG 3 d

March 20 16 doc. : IEEE 802. 15 -16 -0575 -00 TG 3 d July 2016 Closing Report Submission Slide 10 Thomas Kürner, TU Braunschweig

March 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meetings/Contributions • 5 meetings

March 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meetings/Contributions • 5 meetings (thereof 1 joint meeting with IG THz) • 3 Contributions in TG 3 d-only meetings: – Contribution #1: • TU Braunschweig/Univ. of Glasgow, “Preliminary Proposal for THz PHY in IEEE 802. 15. 3, ” (15 -16 -0481 r 01) – Contribution #2: • NICT/Univ. of Hiroshima, “Preliminary Proposal for TG 3 d Cf. P” (15 -160482 r 1) – Contribution #3: • Sebastian Rey (TU Braunschweig), “Thoughts towards a baseline for a proposal , ” (15 -16 -0510) Submission Slide 11 Thomas Kürner, TU Braunschweig

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting TG 3

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting TG 3 d/IG THz • 4 contributions: • S. Rey (TU Braunschweig), “Simulation Results of a Phased Array at 300 GHz, ” (15 -16 -0491 r 00) • S. Rey (TU Braunschweig), “Progress in Regulation above 275 GHz, ” (15 -16 -0492 r 00) • Liaison statement from ITU-R WP 5 A, (15 -16 -0494 r 00; 15 -16 -0507 r 00) • Liaison statement from ITU-R WP 5 C (15 -16 -0513 r 00; 15 -160514 r 00) Submission Slide 12 Thomas Kürner, TU Braunschweig

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Tasks Completed • •

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Tasks Completed • • • Listening preliminary proposals Discussion of merging proposals to one final proposal Discussion on spectrum issues (Kick-off activities: PAR for 802. 1 AC amendment) Review of Time Planning (15 -14 -0155 r 11) Submission Slide 13 Thomas Kürner, TU Braunschweig

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Tasks for September Meeting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Tasks for September Meeting • Presentation of final proposal in September 2016 • Preparation of baseline document for draft standard • Preparation of response to liaison statement from ITU -R WP 5 A and ITU-R WP 5 C • (Preparation of TG 3 d PAR change) Submission Slide 14 Thomas Kürner, TU Braunschweig

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IEEE 802. 15. 3

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IEEE 802. 15. 3 e High Rate Close Proximity (HRCP) Closing Report San Diego July 25 -28, 2016 Submission Slide 15 Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 3 e

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 3 e Officers Chair: Vice Chair: Andrew Estrada, Sony Thomas Kürner, Institut für Nachrichtentechnik Technische Universität Braunschweig Secretary: Ken Hiraga, NTT Technical Editor: Ko Togashi, Toshiba Submission Slide 16 Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Goals for this meeting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Goals for this meeting • July: • Prepare Sponsor Ballot package • Approve BRC • Seek unconditional approval to start Sponsor ballot Submission Slide 17 Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 3 e Accomplishments

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 3 e Accomplishments 1. Prepared Sponsor Ballot submission 2. Agreed on BRC and call schedule 3. Approved motion to request conditional approval to start Sponsor Ballot. Submission Slide 18 Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Letter Ballot 124 (Recirc

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Letter Ballot 124 (Recirc 2) VOTERS 103 VOTED 71 YES 65 ABSTAIN 2 NO 4 % VOTERS 68. 93% % YES 94. 20% % ABSTAIN 2. 82% Draft Std P 802. 15. 3 e D 1. 0 Submission Slide 19 103 73 67 2 4 70. 87% 94. 37% 2. 74% D 2. 0 103 76 74 2 0 73. 79% 100. 00% 2. 63% D 3. 0 Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Contributions • No contributions

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Contributions • No contributions this session. Submission Slide 20 Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Schedule Plan Details (updated

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Schedule Plan Details (updated 26 July ‘ 16) • • PAR/CSD Approval – EC – Nes. Com WG Letter Ballot – Initial – Recirc 1 (15 days) – Recirc 2 (15 days) – Recirc 3 (15 days) Form Sponsor Ballot Pool MEC/MDR Done IEEE-SA Sponsor Ballot – EC approval – Initial – Recirc 1 – Recirc 2 Final WG and EC approval Final Rev. Com approval Publication Submission 2015 March 11 2015 March 27 2016 Jan 2016 May 2016 Apr 23 2016 May 19 (start) 2016 July 29 2016 July 2016 Dec – 2017 Jan – 2017 Mar Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG Motion: The Task

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG Motion: The Task Group requests that 802. 15 reviews and approves the CSD [15 -14 -0716 -07 -003 e] and requests unconditional approval from the EC to submit P 802. 15. 3 e_D 04 to Sponsor Ballot. Moved By: Thomas Kuerner Seconded By: Ryuji Kohno Yes/Abstain/No: 12/0/0 Submission Slide 22 Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG Motion Move that

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG Motion Move that 802. 15. 3 e TG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor balloting of the P 802. 15. 3 e_D 04 with the following membership: Andrew Estrada (Chair), Ko Togashi, Itaru Maekawa, Jae Seung Lee, Keitarou Kondou, Keiji Akiyama, and Ken Hiraga. The 802. 15. 3 e BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the 802. 15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P Moved By: Thomas Kuerner Seconded By: Ko Togashi Yes/Abstain/No: Approved by unanimous consent Submission Slide 23 Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 BRC Telecon Schedule •

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 BRC Telecon Schedule • 2 calls between now and Sept 2016 Session • Call 1: Wed, 31 Aug, 21: 00 to 23: 00 PDT • Thur, 1 Sep 0 -2 EST, 5 -7 CET, 13 -15 JST/KST • Call 2: Wed, 7 Sep, 21: 00 to 23: 00 PDT • Thur, 8 Sep 0 -2 EST, 5 -7 CET, 13 -15 JST/KST • Warsaw, 12 -16 Sep Submission Slide 24 Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 WG Motion: 802. 15

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 WG Motion: 802. 15 has reviewed and approves the CSD [15 -14 -0716 -07 -003 e] and requests unconditional approval from the EC to submit P 802. 15. 3 e_D 04 to Sponsor Ballot. Moved By: Seconded By: Yes/No/Abstain: Submission Slide 25 Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 WG Motion Move that

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 WG Motion Move that 802. 15. 3 e TG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor balloting of the P 802. 15. 3 e_D 04 with the following membership: Andrew Estrada (Chair), Ko Togashi, Itaru Maekawa, Jae Seung Lee, Keitarou Kondou, Keiji Akiyama, and Ken Hiraga. The 802. 15. 3 e BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the 802. 15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P Moved By: Seconded By: Yes/No/Abstain: Submission Slide 26 Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Thank You! Submission Slide

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Thank You! Submission Slide 27 Andrew Estrada, Sony Corporation

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IEEE 802. 15 TG

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IEEE 802. 15 TG 4 s Closing report San Diego 28 July 2016 Submission Slide 28 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 s schedule

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 s schedule for the week Monday Tuesday Wednesday Thursday AM 1 TG 4 s Golden Hill B TG 4 s La Jolla B TG 4 Gaslamp D AM 2 TG 12+TG 4 s Golden Hill B TG 4 Gaslamp D PM 1 PM 2 Submission Slide 29 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Agenda for the week

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Agenda for the week • TG 4 s meeting call to order • Call for essential patents and policies & procedures reminder • Agenda Setting • Approve KOA and Teleconference meeting minutes • Work on Draft document • TG Motion for LB, BRC and Teleconference • Plan for next meeting • Report on progress to WG and WG Motion for LB and BRC Submission Slide 30 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Accomplishment for the meeting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Accomplishment for the meeting • • • Four meetings and one joint session were held. Approved May and Teleconference meeting minutes. Review and edit Draft Document generate. D 1. 0. TG motion for LB and BRC Confirms plan for September meeting and BRC teleconference. Submission Slide 31 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Time planning • •

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Time planning • • • TG Kickoff Editing 1 st Draft Motion for Letter Ballot Sponsor Ballot Submission to Rev. Com September 2014 May 2015 July 2016 March 2017 November 2017 Timeline of TG 4 s (15 -14 -0559 -r 2) Submission Slide 32 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Timeline Year SG Month

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Timeline Year SG Month 2014 1 3 5 7 2015 9 11 1 3 5 7 2016 9 11 1 3 5 7 2017 9 11 1 3 5 7 9 11 PAR & CSD development Start TG Use Cases & TGD TG Work Items Editing Draft Letter Ballot LB Comment Resolution Initial Sponsor Ballot SB Comment Resolution Submission to Rev. Com Timeline of TG 4 s (15 -14 -0559 -r 2) Submission Slide 33 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Contributions • TG 4

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Contributions • TG 4 s May 2016 Meeting Minutes (15 -16 -382 r 0) • TG 4 s Teleconference Minutes for July 2016 (15 -16 -500) Submission Slide 34 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG Motion #1 Move

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG Motion #1 Move that TG 4 s formally requests that the 802. 15 WG start a WG Letter Ballot requesting approval to forward document P 802 -15 -4 s/D 01, and CA document 15 -160536 -01 -004 s-coexistence-assurance-document-for-802 -15 -4 s. doc to Sponsor Ballot. Moved By: Hidetoshi Yokota Seconded By: Shusaku Shimada y/a/n =4 /0/0 Submission Slide 35 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG Motion #2 Motion

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG Motion #2 Motion for TG Approval to Form a TG 4 s BRC. TG 4 s requests that 802. 15 WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the P 802. 15. 4 s-D 01 with the following membership: Shoichi Kitazawa, Hidetoshi Yokota, and Shusaku Shimada. The 802. 15 TG 4 s BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the 802. 15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P. • Moved by: Jussi Haapola • Seconded by: Pat Kinney • Y/N/A: 4/0/0 Submission Slide 36 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 WG Motion #1 Motion

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 WG Motion #1 Motion for WG Approval to Start Letter Ballot. Move that 802. 15 WG start a WG Letter Ballot requesting approval to forward document P 802 -15 -4 s-D 01, and CA document 15 -16536 r 1 to Sponsor Ballot • Moved By: Shoichi Kitazawa • Seconded By Submission Slide 37 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 WG Motion #2 Motion

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 WG Motion #2 Motion for WG Approval to Form a TG 4 s BRC. Move that 802. 15 WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the P 802. 15. 4 s-D 01 with the following membership: Shoichi Kitazawa, Hidetoshi Yokota, and Shusaku Shimada. The 802. 15. 4 s BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the 802. 15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P • Moved By: Shoichi Kitazawa • Seconded By Submission Slide 38 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Plan for September Meeting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Plan for September Meeting • 2 meeting slots – Comment resolution Submission Slide 39 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 BRC Conference Calls Starting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 BRC Conference Calls Starting BRC conference calls one week after the letter ballot ends. • Weekly every Tuesday 22: 00(EDT) /Wednesday 11: 00 (JST) Submission Slide 40 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Thank you! Submission Slide

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Thank you! Submission Slide 41 Shoichi Kitazawa, ATR

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Project: IEEE P 802.

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Project: IEEE P 802. 15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG 4 u Opening and Closing Report for July 2016 Date Submitted: July 2016 Source: Phil Beecher, Wi-SUN Alliance, Contact: Phil Beecher, Wi-SUN Alliance. Voice: +44 7765 400948, E-Mail: [email protected] org Re: TG 4 u Report for July 2016 Interim Abstract: Opening and Closing Report for the TG 4 u Session in San Diego Purpose: Support for India Bands Notice: This document has been prepared to assist the IEEE P 802. 15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P 802. 15. Submission Slide 42 Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 u Officers

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 u Officers Chair: Phil Beecher (Wi-SUN Alliance) Vice Chairs: Amarjeet Kumar (Procubed) Editors: Benjamin Rolfe (Blind Creek Associates) Kunal Shah (Silver Spring Networks) Secretary: Benjamin Rolfe (Blind Creek Associates) Submission Slide 43 Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meeting Goals Review results

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meeting Goals Review results of Sponsor Ballot Comment Resolution and initiate Sponsor Ballot recirculation Next Steps Submission Slide 44 Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Sponsor Ballot Result P

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Sponsor Ballot Result P 802. 15. 4 u Standard for Local and Metropolitan Area Networks -Part 15. 4: Low-Rate Wireless Personal Area Networks (LR-WPANs) Amendment for Use of the 865 -867 MHz Band in India • • • BALLOT OPEN DATE: 15 -Jun-2016 BALLOT CLOSE DATE: 15 -Jul-2016 DRAFT #: D 3 • • RESPONSE RATE This ballot has met the 75% returned ballot requirement. 71 eligible people in this ballot group. 62 affirmative votes 1 total negative votes with comments 1 negative votes with new comments 0 negative votes without comments 1 abstention votes: (Lack of time: 1) • • • 64 votes received = 90% returned 1% abstention APPROVAL RATE The 75% affirmation requirement is being met. 62 affirmative votes 1 negative votes with comments 63 votes = 98% affirmative • • COMMENTS: 15 MUST BE SATISFIED COMMENTS: 1 • Comments are posted on Mentor at https: //mentor. ieee. org/802. 15/dcn/16/1516 -0485 -00 -004 u-802 -15 -4 u-sponsor-ballot • -consolidated-comments. xlsx • • Submission Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG Approval of Comment

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG Approval of Comment Resolutions • Task Group Motion: • The Task Group TG 4 u approves comment resolutions in 15 -16 -0485 -03 -004 u-802 -15 -4 u -sponsor-ballot-consolidated-comments • Moved by: Kunal Shah • Seconded by: Gary Stuebing • Unanimous Submission Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG Request for Sponsor

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG Request for Sponsor Ballot Recirculation • Task Group Motion: • The Task Group TG 4 u requests that 802. 15 WG start a Sponsor Ballot recirculation requesting approval to forward document P 802. 15. 4 u_D 4 Draft_Standard to Rev. Com • Moved by: Kunal Shah • Seconded by: Gary Stuebing • Unanimous Submission Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG BRC Motion •

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG BRC Motion • Move that Task Group Tg 4 u requests 802. 15 WG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor ballot recirculation of the P 802. 15. 4 u-D 4 with the following membership: Phil Beecher (chair), Kunal Shah, Amarjeet Kumar, Benjamin Rolfe, Chris Calvert and Gary Stuebing. The 802. 15. 4 u BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the 802. 15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P • Moved By: Amarjeet Kumar • Seconded By: Kunal Shah • Unanimous consent Submission Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Task Group Rev. Com

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Task Group Rev. Com Motion • Motion: Task Group TG 4 u requests that the 802. 15 WG reviews and approves the CSD [15 -15 -0755 -02 -0000_15. 4 u_India_CSD ] and requests conditional approval from the EC to submit P 802. 15. 4 u_D 4 to Rev. Com. • Moved By: Kunal Shah • Seconded By: Ben Rolfe • Unanimous consent Submission Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 802. 15 Working Group

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 802. 15 Working Group Motions Submission Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 WG Request for Sponsor

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 WG Request for Sponsor Ballot Recirculation • Working Group Motion: • Move that 802. 15 WG start a Sponsor Ballot recirculation requesting approval to forward document P 802. 15. 4 u_D 4 Draft_Standard to Rev. Com • Moved by: Phil Beecher • Seconded by: • Y/N/A Submission Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 WG BRC Motion •

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 WG BRC Motion • Move that 802. 15 Working Group approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor balloting recirculation of the P 802. 15. 4 u-D 4 with the following membership: Phil Beecher (chair), Kunal Shah, Amarjeet Kumar, Benjamin Rolfe, Chris Calvert and Gary Stuebing. The 802. 15. 4 u BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the 802. 15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P • Moved By: Phil Beecher • Seconded By: Submission Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Working Group Rev. Com

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Working Group Rev. Com Motion • Motion: The 802. 15 WG has reviewed and approves the CSD [15 -15 -0755 -020000_15. 4 u_India_CSD ] and requests conditional approval from the EC to submit P 802. 15. 4 u_D 4 to Rev. Com. • Moved By: • Seconded By: • Y/N/A Submission Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 BRC Call • 7

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 BRC Call • 7 pm, Monday, 15 August PDT, and weekly unless cancelled by the chair, or amended by BRC participants Submission Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Timeline • • •

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Timeline • • • TG formation Nov 2015 Call for Proposals Dec 2015 Presentation of Proposals Task Group TE prepares draft WG informal Ballot Feb 2016 TG BRC comment resolution Start Letter Ballot Mar 2016 LB comment resolution + 2 recirculations Sponsor Ballot June 2016 SB comment resolution + 2 recirculations Rev. Com submission 2016 Rev. Com approval Sep or Dec 2016 Submission Slide 55 Jan 2016 Feb 2016 Apr – May 2016 July – Aug 2016 Aug or Nov Phil Beecher, Wi-SUN Alliance

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t CLOSING

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t CLOSING REPORT Submission Clint Powell, Powell Consulting

July 2016 Meeting Status Recap May 802. 15 Interim and Current Status Agenda and

July 2016 Meeting Status Recap May 802. 15 Interim and Current Status Agenda and Mins. Approval Review Scope Review LB Results Comment Resolution Re-Establish TG 4 t BRC Review & Update Timeline Next Steps Submission doc. : IEEE 802. 15 -16 -0575 -00 Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Minutes - doc. #

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Minutes - doc. # 15 -16 -0534 -00 Submission Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Timeline

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Timeline (start dates) Letter Ballot 1 st Letter Ballot Recirc. WG & EC Sponsor Ballot Approval Sponsor Ballot 1 st Sponsor Ballot Recirc. 2 nd Sponsor Ballot Recirc. * EC Approval Rev. Com Approval * May not be needed Submission May. 2016 July 2016 Aug. 2016 Sept. 2016 Oct. 2016 Nov. 2016 Dec. 2016 Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Looking Forward Between Now

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Looking Forward Between Now and Warsaw Mtg. in Sept. 1 st Letter Ballot Recirc. Comment Resolution Initial Sponsor Ballot At Warsaw Mtg. in Sept. Initial Sponsor Ballot Comment Resolution Submission Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Looking Forward (cont’d. )

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Looking Forward (cont’d. ) After Warsaw Mtg. 1 st Sponsor Ballot Recirc. Comment Resolution 2 nd Sponsor Ballot Recirc. Submission Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Motion

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Motion 1 Motion to Start a Letter Ballot Recirc. Move that TG 4 t formally request that the 802. 15 WG start a WG Letter Ballot requesting approval to forward document P 802. 15. 4 t/D 01, edited in accordance with the instructions in document 15 -16 -0448 -06, to Sponsor Ballot pending the completion and inclusion of the edits in the draft. Moved: Ed Callaway Discussion: None Objections: None Submission Second: Henk De. Ruijter Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Motion

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Motion 2 Motion for Request to WG to Form a TG 4 t BRC. TG 4 t requests that 802. 15 WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the P 802. 15. 4 t/D 01 with the following membership: Clint Powell, Henk de Ruijter, Monique Brown, Ed Callaway. The 802. 15 TG 4 t BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of P 802. 15. 4 t/D 01 on behalf of the 802. 15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P. Moved: Ed Callaway Discussion: None Objections: None Submission Second: Henk de Ruijter Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Conference

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Conference Calls Reminder TG 4 t Standing Conference Call Info Day: Wed. Time: 5 PM-6 PM Mon. (Pacific) Conf. #: To Be Sent to TG 4 t Reflector Next Call: Wed. 10 th, Aug. Submission Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Motion

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Motion 1 to WG Motion for WG Approval to Start Letter Ballot Recirc. Motion: that 802. 15 WG start a WG Letter Ballot requesting approval to forward document P 802. 15. 4 t/D 01 Draft Standard, edited in accordance with the instructions in document [15 -16 -0448 -06], and CA document [15 -16 -0408 -01] to Sponsor Ballot pending the completion and inclusion of the edits in the draft. Moved by: Clint Powell Seconded by: Submission Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Motion

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Motion 2 to WG Motion for WG to Seek Conditional Approval from EC to move to Sponsor Ballot. Motion: that 802. 15 has reviewed and approves the CSD [15 -15 -0739 -020000] and requests conditional approval from the EC to submit P 802. 15. 4 t/D 02 Draft Standard to Sponsor Ballot. Moved by: Clint Powell Seconded by: Submission Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Motion

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 4 t Motion 3 to WG Motion for WG Approval to Form TG 4 t BRC. Move that 802. 15 WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the P 802. 15. 4 t/D 01 with the following membership: Clint Powell, Henk de Ruijter, Monique Brown, Ed Callaway. The 802. 15 TG 4 t BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of P 802. 15. 4 t/D 01 on behalf of the 802. 15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P. Moved by: Clint Powell Seconded by: Submission Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IEEE 802. 15. 7

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IEEE 802. 15. 7 r 1 OWC Closing report San Diego July 29, 2016 Submission Slide 68 Yeong Min Jang

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Agenda items for the

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Agenda items for the week • Continue task group review and comment resolution Submission Slide 69 Yeong Min Jang

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Accomplishment for the July

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Accomplishment for the July meeting • 12 sessions (Mon. , Tue. , Wed. and Thurs. ) • TG passed 1 motion to change PAR title: (Wireless Optical Communication Optical Wireless Communications) • • Draft baseline document D 0: 566 pages Technical comments: 871 Editorial comments: 1568 Resolved 325 technical comments Submission Slide 70 Yeong Min Jang

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Plan for Sept. Meeting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Plan for Sept. Meeting • Requesting 12 meeting sessions – Continue task group review and comment resolution – Schedule is under revision Submission Slide 71 Yeong Min Jang

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 TG 8 PAC Closing Report

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 TG 8 PAC Closing Report July 28, 2016 Myung J. Lee TG 8 Chair Submission Slide 72 Myung Lee, CUNY

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 Meeting Objectives • Comment Resolution

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 Meeting Objectives • Comment Resolution • Drafting 2. 0 • Prepare a recirculation Submission Slide 73 Myung Lee, CUNY

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 Achievements • 1 st Letter

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 Achievements • 1 st Letter Ballot – Voted 69 (out of 103) : 66. 99% – Yes (60), No (4), ABS (5) – Approval Rate: 93. 75%, Abstain Rate: 7. 25% • Total Number of comments: 716 - Technical (242), Editorial (474) • Comments resolutions/assignments (626/716) • PAR extension (1 yr) WG motion passed Submission Slide 74 Myung Lee, CUNY

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 WG BRC Motion • Move

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 WG BRC Motion • Move that 802. 15 WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the P 802. 15. 8 -D 01 with the following membership: Myung Lee (chair), Huan-bang Li, BJ Kwak, Marco Hernandez, Billy Verso, and Seong-Soon Joo. The 802. 15. 8 BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the revised draft on behalf of the 802. 15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P • Moved By: Myung Lee • Seconded By: Submission Slide 75 Myung Lee, CUNY

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 Plan for September Interim •

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 Plan for September Interim • BRC Teleconferences – Agenda: Comment Resolution – Bi-weekly Wednesday starting August 10, 2016 • August 10 (Wednesday) 7: 00 am. US EDT, 8: 00 pm Japan/Korea, Ireland 12: 00 PM – Teleconference via Skype Submission Slide 76 Myung Lee, CUNY

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 Timeline • • • •

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 Timeline • • • • TG formation Mar 12 Call for Application April 12 Application presentation May 12 TGD approval/Call for proposal Jan 13 Re-affirmation of TGD/Call for proposal March 13 Preliminary proposal presentation May, 13 Final proposal presentation July 13 PAC Framework Document/Call for contribution Jan. 14 Contribution Presentation March 15 Draft spec (P 802. 15. 8 D 1. 0) complete/Letter Ballot May 15 LB Comment resolution/ LB recirculation Nov. 15 Sponsor Ballot Mar. 16 Rev. Com submission July 16 Submission Slide 77 Myung Lee, CUNY

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 TG 8 PAC Officers •

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 TG 8 PAC Officers • Chair: Myung Lee (CUNY) • Vice Chair: Huan-Bang Li (NICT) • Secretary Marco Hernandez (NICT) • Editors: Byung-Jae Kwak (ETRI) Marco Hernandez (NICT) Billy Verso (Deca. Wave) Submission Slide 78 Myung Lee, CUNY

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 Thank you! Submission Slide 79

11/22/2020 doc. : IEEE 802. 15 -16 -0575 -00 Thank you! Submission Slide 79 Myung Lee, CUNY

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 10 CLOSING REPORT

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 10 CLOSING REPORT Submission Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meeting Status Recap May

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meeting Status Recap May 802. 15 Interim and Current Status Agenda and Mins. Approval Review Scope Review SB Results Comment Resolution Re-Establish TG 10 BRC Submission Review & Update Timeline Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 SB Comment Resolution Status

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 SB Comment Resolution Status TOTAL # OF COMMENTS # SB COMMENTS 136 # TECHNICAL 66 # EDITORIAL/OTHER 70 Resolved 113 Submission 83% Resolved Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Minutes & Comment Database

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Minutes & Comment Database Minutes - doc. # 15 -16 -0538 -00 Comment Database - doc. # 15 -16 -0475 -02 Submission Clint Powell, Powell Consulting

July 2016 TG 10 Timeline EC Sponsor Ballot Approval Sponsor Ballot 1 st Sponsor

July 2016 TG 10 Timeline EC Sponsor Ballot Approval Sponsor Ballot 1 st Sponsor Ballot Recirc. 2 nd Sponsor Ballot Recirc. 3 rd Sponsor Ballot Recirc. * EC Approval Rev. Com Approval * May not be needed Submission doc. : IEEE 802. 15 -16 -0575 -00 (start dates) June 2016 June/July 2016 Aug. 2016 Sept. 2016 Oct. 2016 Nov 2016 Dec 2016 Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Looking Forward Between Now

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Looking Forward Between Now and Warsaw Mtg. in Sept. Complete Sponsor Ballot Comment Resolution 1 st Sponsor Ballot Recirc. Comment Resolution At Warsaw Mtg. in Sept. 1 st Sponsor Ballot Recirc. Comment Resolution Submission Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Looking Forward (cont’d. )

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Looking Forward (cont’d. ) After Warsaw Mtg. Complete 1 st Sponsor Ballot Recirc. Comment Resolution 2 nd Sponsor Ballot Recirc. Comment Resolution Next Update to 802. 1 Nov. 2016 Submission Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 10 Motion 1

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 10 Motion 1 Motion for TG Approval to Form a TG 10 BRC. Move that TG 10 request that the 802. 15 WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the TG 10 draft recommended practice with the following membership: Clint Powell, Verotiana Rabarijaona, Fumihide Kojima, Noriyuki Sato, Kiyoshi Fukui, Soo -Young Chang, Jaehwan Kim, Sang. Sung Choi, Charlie Perkins. The 802. 15 TG 10 BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the TG 10 draft on behalf of the 802. 15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P. Moved by: Verotiana Discussion: None Objections: None Submission Seconded by: Sato-san Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 10 Conference Calls

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 10 Conference Calls Reminder TG 10 Standing Conference Call Info Day: Mon. Time: 6 PM-8 PM Mon. (Arizona) 10 AM-Noon Tues. (Japan-JST, Korea) Conf. #: To Be Sent to TG 10 Reflector Next Call: Mon. 8 th, Aug. Tues. (Japan-JST, Korea) Submission Clint Powell, Powell Consulting

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 10 Motion 1

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 TG 10 Motion 1 to WG Motion for WG Approval to Form TG 10 BRC. Move that 802. 15 WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the TG 10 draft recommended practice with the following membership: Clint Powell, Verotiana Rabarijaona, Fumihide Kojima, Noriyuki Sato, Kiyoshi Fukui, Soo-Young Chang, Jaehwan Kim, Sang. Sung Choi, Charlie Perkins. The 802. 15 TG 10 BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the TG 10 draft on behalf of the 802. 15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P. Moved by: Clint Powell Seconded by: Submission Clint Powell, Powell Consulting

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Project: IEEE P 802.

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Project: IEEE P 802. 15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG 12 ULI Report for July 2016 Session] Date Submitted: [25 July 2016] Source: [Patrick Kinney] Company [Kinney Consulting LLC] Address [Chicago area, IL, USA] Voice: [+1. 847. 960. 3715], E-Mail: [pat. [email protected] org] Re: [TG 12 Report for July 2016 Session. ] Abstract: [Report for the July Session] Purpose: [] Notice: This document has been prepared to assist the IEEE P 802. 15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P 802. 15. Submission Slide 90 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 TG 12 Officers Chair

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 TG 12 Officers Chair Vice Chair Submission Pat Kinney Charlie Perkins Slide 91 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 TG 12 Meeting Goals

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 TG 12 Meeting Goals Monday 25 July, PM 1: Opening report, Agenda, Functional decomposition review Tuesday 26 July, AM 2: Joint meeting with 802. 15. 4 s – discussion on common elements Tuesday 26 July, PM 2: Discussion on Higher Layer Protocol Discrimination Entity Wednesday 27 July, AM 1: Discussion on Multiplexed MAC interface Wednesday 27 July, PM 1: Discussion on PHY and MAC configuration using Multiplexed MAC interface Wednesday 27 July, PM 2: Discussion on how KMP should work within 15. 12 Thursday 28 July, AM 1: Discussion on how 6 Lo. WPAN should work within 15. 12 Submission Slide 92 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> TG 12 Meeting doc. : IEEE 802. 15 -16 -0575 -00 Monday

<July 2016> TG 12 Meeting doc. : IEEE 802. 15 -16 -0575 -00 Monday 25 July, PM 1: Opening report, Agenda, Functional decomposition review Approve Agenda 15 -16 -0456 -01 Approve Minutes from previous session 15 -16 -0403 -00 Functional Decomposition Review Submission Slide 93 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Strategy for moving forward

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Strategy for moving forward Next Steps 1. Define how KMP should work within 15. 12 • What does Link SAP look like? • Expand the Multiplexed data service into the Multiplexed MAC interface 2. Define how 6 Lo. WPAN should work within 15. 12 • Define the Link SAP using IPv 6, et al as examples 3. Define PHY configuration using management protocols function 4. Define MAC Configuration using management protocols function 5. Define the Higher Layer Protocol Discrimination Entity (HLPDE) 6. Define ULI header • Unique identification of ULI presence • Compression of higher layer stack and Ether. Type • Other components? Submission Slide 94 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802 -2014 Reference Model

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802 -2014 Reference Model Submission Slide 95 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> Submission doc. : IEEE 802. 15 -16 -0575 -00 802 -2014 Reference

<July 2016> Submission doc. : IEEE 802. 15 -16 -0575 -00 802 -2014 Reference Model Slide 96 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 9 Functional

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 9 Functional Decomposition Submission Slide 97 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 10 Functional

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 10 Functional Decomposition The Data SAP and the MCPS-SAP are used for Multicast as indicated in Figure 19 and Figure 66 The MGMT SAP and the MLME-SAP are used as indicated in Figures 3 through 13 Submission Slide 98 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Functional

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Functional Decomposition Submission Slide 99 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Functional

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Functional Description • Higher Layer Protocol Discrimination Entity (HLPDE) • Directs and optionally modifies information from Functional SAP to the appropriate higher layer protocol SAP or another Functional SAP • Multiplexed MAC Interface (MMI) • Directs and optionally modifies information from Functional SAP to the appropriate MAC SAP or another Functional SAP Submission Slide 100 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Higher

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Higher Layer Protocol Discrimination Entity (HLPDE) • HLPDE will be dependent upon configuration of device (via Mgmt Protocol entity). • For frames going to the higher layer, the HLPDE removes the ULI header (if present), and directs the frame to the proper SAP identified by the ULI header information. • For datagrams coming from a higher layer, the HLPDE prepends the datagram with a ULI header and forwards it to the appropriate SAP defined by the configuration setting. • Note: review how Co. MI and Co. AP send their management information to the correct device/SAP. Note: ask RAC for Ether. Type assignment for 802. 15. 12. Submission Slide 101 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Multiplexed

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Multiplexed MAC interface • Multiplexed MAC Interface (MMI) • Provides multiplex and fragmentation service to the packets sent by the ULI functions and send them to either the MCPSSAP, the MLME-SAP, or to another function within the ULI. • The interface between the MMI and the ULI functions includes the Multiplex ID and the payload to be sent or the payload received. • The mechanism for the MMI, i. e. the ability to send the data to the proper SAP, will be an extension of the mechanism defined in IEEE 802. 15. 9 for the multiplexed data service Submission Slide 102 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Functional

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Functional Description • 802. 1 X provides authentication, authorization, and cryptographic key agreement mechanisms to support secure communication between end stations connected to 802 networks. • 802. 15. 9 (KMP) provides a methodology to enable key management by providing a transport for key management protocols outside the application layers. Additionally, provides a fragmentation and multiplexing layer for those packets so they can be delivered over smaller MAC layer frames and multiplexed on the recipient end to the right processing service. • 6 Lo. WPAN provides the function of MAC frame modification into a frame format for transmission of IPv 6 packets and the method of forming IPv 6 link-local addresses and statelessly autoconfigured addresses on IEEE 802. 15. 4 networks. Additional functions include a header compression scheme using shared context and provisions for packet delivery in IEEE 802. 15. 4 meshes. Submission Slide 103 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Functional

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Functional Description • 6 tisch functions as an abstraction of an IP link over the TSCH mode of the MAC sublayer by providing network formation and maintenance, multi-hop topology, assign time source neighbor, resource management, dataflow control, scheduling mechanisms, and security. • 802. 15. 10 (L 2 R) provides the following functions: topology construction, L 2 R mesh discovery/join/update/recovery, hop-by-hop retransmission, unicast/multicast/broadcast routing, data concatenation, short address assignment, and security • Management protocols provides a Yang modeling interface via the HLPDE-SAP to upper layer applications such as Co. AP, Co. MI. Additionally, it provides configuration parameters to the MAC and PHY via the MMI-SAP, and may provide configuration parameters to other protocol entities in the ULI. Submission Slide 104 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Management Protocol Configuration Parameters

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Management Protocol Configuration Parameters via MGMT SAP ULI Protocol entity MAC Mode (incl. IEs) PHY Parameters cont’d TSCH Channel Number/Frequency/Band DSME Bandwidth RIT Modulation CSL Preamble SUN FCS size TVWS Packet Length RFID Data Rate RCC Transmit power level LECIM CCA Mode/duration PAN discovery FEC Rate/code/interleaving PAN set-up SFD Size/value Security ED threshold Association Spreading factor Promiscuous DSSS code Ranging Data whitening Spectrum Tracking Common signaling mode Submission Slide 105 Code/repetition <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> Submission Frame Composition doc. : IEEE 802. 15 -16 -0575 -00 Slide

<July 2016> Submission Frame Composition doc. : IEEE 802. 15 -16 -0575 -00 Slide 106 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting with TG

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting with TG 4 s Dynamic 802. 15. 4 Management MAC PHY Spectrum resource measurement Desired signal strength and non-desired signal strength Regulatory Transmit power level set CCA threshold Transmit power level Set maximum to comply to regulatory Submission Slide 107 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> Next Steps doc. : IEEE 802. 15 -16 -0575 -00 Strategy for

<July 2016> Next Steps doc. : IEEE 802. 15 -16 -0575 -00 Strategy for moving forward 1. Define the Higher Layer Protocol Discrimination Entity (HLPDE). 2. Define how the Multiplexed MAC interface (MMI) works using the Multiplexed data service as a baseline. 3. Define how the management protocols work • • • PHY configuration MAC configuration TG 4 s coordination efforts 4. Define how KMP should work within 15. 12. • Define the KMP SAPs using 802. 1 X as an example 5. Define how 6 Lo. WPAN should work within 15. 12. • Define the 6 LO SAPs using IPv 6 as an example 6. Define how L 2 R should work within 15. 12. • Define the L 2 R SAPs using both an endpoint and router as examples 7. Define how Ranging should work within 15. 12 1. Define the RNG SAPs using RFID as example 8. Define ULI frame mechanism (ULI IE/Payload). 1. Unique identification of ULI presence 2. Compression of higher layer stack and Ether. Type 3. Other components? Submission Slide 108 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Future Efforts Functional Blocks

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Future Efforts Functional Blocks • • • HLPDE MMI Management Protocol 6 Lo. WPAN KMP 802. 1 X L 2 R 6 tisch Ranging P Kinney H Yokota C Perkins B Verso Functional Block Overview • How do they work? • What functions do they include? • How do the SAPs work? • What primitives are required? • What parameters are required? Submission Slide 109 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Meeting Accomplishments Discussion on

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Meeting Accomplishments Discussion on the concepts necessary for 802. 15. 12 Use of an IE assigned to 15. 12 for any ULI message Use of an IE assigned to 15. 12 for ULI 6 Lo. WPAN message Use of the frame payload for ULI message (note: requires the devices to have security and use a well-known key for discovery) Discussion on the architecture for 802. 15. 12 Agreement on extensible and scalable architecture Discussion with TG 4 s on common efforts Agreement on common efforts and methods to work together Submission Slide 110 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Functional

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 802. 15. 12 Functional Decomposition Submission Slide 111 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> Submission Frame Composition doc. : IEEE 802. 15 -16 -0575 -00 Slide

<July 2016> Submission Frame Composition doc. : IEEE 802. 15 -16 -0575 -00 Slide 112 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Schedule TASK Start Completed

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Schedule TASK Start Completed TG 12 May, 2016 November, 2018 Concept and Architecture May, 2016 July, 2016 Baseline definition July, 2016 Nov, 2016 Draft Nov, 2016 March, 2017 TG Comment Collection April, 2017 May, 2017 WG Letter Ballot June, 2017 January, 2018 Sponsor Ballot January, 2018 July, 2018 Nes. Com July, 2018 September, 2018 IEEE-SA Publication September, 2018 November, 2018 Submission Slide 113 <Pat Kinney>, <Kinney Consulting LLC>

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IG THz July 2016

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IG THz July 2016 Closing Report Submission Slide 114 Thomas Kürner, TU Braunschweig

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meetings/Contributions • 1 joint

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meetings/Contributions • 1 joint meeting with TG 3 d on Tue PM 1 – 16 participants • 4 contributions: • S. Rey (TU Braunschweig), “Simulation Results of a Phased Array at 300 GHz, ” (15 -16 -0491 r 00) • S. Rey (TU Braunschweig), “Progress in Regulation above 275 GHz, ” (15 -16 -0492 r 00) • Liaison statement from ITU-R WP 5 A, (15 -16 -0494 r 00; 15 -16 -0507 r 00) • Liaison statement from ITU-R WP 5 C (15 -16 -0513 r 00; 15 -160514 r 00) Submission Slide 115 Thomas Kürner, TU Braunschweig

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IEEE 802. 15 IG

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IEEE 802. 15 IG DEP Closing Report San Diego, CA, USA July 28 th, 2016 Submission Slide 116 Ryuji Kohno(YNU/CWC-Nippon)

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meeting Objectives • Updating

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meeting Objectives • Updating a draft of Technical Requirements with discussion on Viable Technologies in PHY and MAC • Updating a preliminary PAR and CSD for expecting SG/TG on Enhanced Dependability based on updated summary of reports for Call for Interest(CFI) since November 2014. • Planning of Tutorial in November Meeting • Time Line, Project Plan with drafting PAR and CSD Submission Slide 117 Ryuji Kohno(YNU/CWC-Nippon)

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meeting Accomplishments ü Review

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meeting Accomplishments ü Review Discussion in Previous Meetings ü Call for Agenda in this week ü Review of Responses to Call for Interest(CFI) 1. Review of Call for Interest(CFI): doc. #15 -14 -0449 -06 -0 dep 2. Review of Summary of Responses for CFI: doc. #15 -15 -0217 -06 -0 dep 3. Review of Scope and Focused Applications with Different Qo. S Levels; doc. #15 -16 -0111 -00 -0 dep 4. . Update Technical Requirement doc. #15 -16 -0557 -00 -0 dep 1. 5. Review and revise PAR for IEEE 802. 15. 13 doc. #15 -16 -0290 -01 -0 dep 1. Presentation 1. Demand for Focused Applications of Enhanced Dependability in Wireless Links 2. doc. #15 -16 -0496 -00 -0 dep 3. 2. Viable Technologies in PHY and MAC Layers for Technical Requirement of Enhanced Dependability in Wireless Links doc. #15 -16 -0517 -00 -0 dep 2. Necessary Process and Possible Timeline to SG and next steps 1. Planning of Tutorial in November meeting doc. #15 -16 -0558 -01 -0 dep 2. Discussion on timeline for November meeting in San Antonio and later Submission Slide 118

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Contributions 15 -16 -0444

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Contributions 15 -16 -0444 -00 -0 dep-ig-dependability-march-2016 -meeting-minitues 15 -16 -0445 -02 -0 dep-ig-dependability-july-2016 -meeting-agenda 15 -16 -0495 -00 -0 dep-ig-dep-opening-information-for-july-2016 15 -15 -0496 -00 -0 dep-ig-dep-demand-for-focused-applications-of- enhanceddependability-in-wireless-links 15 -16 -0517 -00 -0 dep-ig-dep-viable-technologies-in-phy-and-mac-layers-fortechnical-requirement-of-enhanced-dependability-in-wireless-links 15 -16 -0290 -01 -0 dep-ig-dep-par-802 -15 -par-draft 15 -16 -0556 -00 -0 dep-ig-dep-july-2016 -meeting-minutes 15 -16 -0557 -01 -0 dep-ig-dep-technical-requirement 15 -16 -0558 -01 -0 dep-ig-dep-tutorial plan for primary focused applications in vehicle networks with enhanced dependability 15 -16 -0543 -00 -0 dep-ig-dep-july-2016 -closing-report Attendees 14 Submission Slide 119 Ryuji Kohno(YNU/CWC-Nippon)

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 • Thank You !

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 • Thank You ! • Any Questions ? Submission Slide 120 Ryuji Kohno(YNU/CWC-Nippon)

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IEEE 802. 15 IG

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IEEE 802. 15 IG HRRC (High Rate Rail Communications Interest Group) Closing Report San Diego, USA Thursday, July 28, 2016 Submission Slide 121 Junhyeong Kim, ETRI

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IG Group Leadership •

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 IG Group Leadership • Chair/secretary : Junhyeong Kim (ETRI, South Korea) Submission Slide 122 Junhyeong Kim, ETRI

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Sessions • 8 th

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Sessions • 8 th meeting for IG HRRC – Joint 15/16 meeting • 1 session – Thursday AM 1 (08: 00 ~ 10: 00), July 28, 2016 • 7 participants Submission Slide 123 Junhyeong Kim, ETRI

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meeting Accomplishments • Listening

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Meeting Accomplishments • Listening contributions – A KR-EU joint research project relevant to HRRC - 5 G CHAMPION (15 -16 -0502 -01 -hrrc) • • Potential use-cases covered by 5 G CHAMPION project Key technological objectives of 5 G CHAMPION project Main research topics Plan for demonstration and standardization – Doppler mitigation for HSR communications (15 -16 -0473 -01 hrrc) • Proposed Doppler mitigation method • Pros and Cons • Discussion on other issues – Further technical discussions on HRRC – Future potential collaboration with 16 WG Submission Slide 124 Junhyeong Kim, ETRI

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Future Plan • Update

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Future Plan • Update Call for Interest (CFI) document • Technical collaboration on HRRC with participants • Encourage more companies to participate in upcoming meetings Submission Slide 125 Junhyeong Kim, ETRI

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Contributions • 5 contributions

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Contributions • 5 contributions – Contribution #1 (15 -16 -0468 -01 -hrrc) : IG HRRC July 2016 Agenda – Contribution #2 (15 -16 -0502 -01 -hrrc) : A KR-EU Joint Research Project Relevant to HRRC – 5 G CHAMPION – Contribution #3 (15 -16 -0473 -01 -hrrc) : Doppler Mitigation for High-speed Rail Communications – Contribution #4 (15 -16 -0545 -00 -hrrc) : Meeting Minutes for July 2016 – Contribution #5 (15 -16 -0546 -00 -hrrc) : Closing Report for July 2016 Submission Slide 126 Junhyeong Kim, ETRI

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Thank you Submission Slide

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Thank you Submission Slide 127 Junhyeong Kim, ETRI

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Project: IEEE P 802.

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Project: IEEE P 802. 15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SC Report for July 2016 Session] Date Submitted: [23 July 2016] Source: [Patrick Kinney] Company [Kinney Consulting LLC] Address [Chicago area, IL, USA] Voice: [+1. 847. 960. 3715], E-Mail: [pat. [email protected] org] Re: [SC Report for July 2016 Session. ] Abstract: [Report for the July 2016 Session] Purpose: [] Notice: This document has been prepared to assist the IEEE P 802. 15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P 802. 15. Submission Slide 128 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 SCmaintenance/SCwng Officer Chair: Patrick

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 SCmaintenance/SCwng Officer Chair: Patrick Kinney Vice Chair Ben Rolfe Secretary Submission Slide 129 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 SC Meeting Goals (Agenda

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 SC Meeting Goals (Agenda 15 -16 -0455 -02) SC Maintenance Monday 26 July, PM 2 Approve agenda, approve minutes, Discuss any issues with published standards Discuss any issues with the Operations Manual SC IETF Tuesday 26 July, AM 1 Status Update: 6 tisch, Core, 6 lo, Roll, Detnet, and lp-wan Liaison communications requests/discussions Joint Meeting between 802. 15 and 802. 1 Tuesday 26 July, PM 3 Wi. Fi liaison stating a perceived market need to interwork between 802. 11 ah and 802. 15. 4 g at layer 2 802. 15 TG status reports 802. 1 efforts that should be considered by 802. 15 SC WNG Wednesday 27 July, AM 2 "History and Implementation of the IEEE 802 Security Architecture” “IEEE Standards for Low Power Wide Area Networks” Submission Slide 130 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 SC Maintenance Agenda approval

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 SC Maintenance Agenda approval (15 -16 -0455 -01) Approve previous minutes (15 -16 -0250 -00) Discussion on any issues with published standards ? Discussion on any issues with the Operations Manual ? Submission Slide 131 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 Agenda approval

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 Agenda approval Status Updates • 6 tisch • Core • 6 lo • Roll • Detnet • lp-wan (bof) IEEE 802. 15 and IETF liaison communications Submission Slide 132 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 6 tisch

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 6 tisch – Draft-ietf-6 tisch-minimal • Rev 16 published, now in AD follow-up – Draft-ietf-6 tisch-6 top-protocol • Rev 1 published, tested at ETSI plugtest – Draft-ietf-6 tisch-6 top-sf 0 • Rev 1 published, tested at ETSI plugtest – Draft-ietf-6 tisch-architecture • Rev 10 published – Next Step • Submission of Draft-ietf-6 tisch-6 top-sublayer to IESG Submission Slide 133 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> Core SC IETF doc. : IEEE 802. 15 -16 -0575 -00 •

<July 2016> Core SC IETF doc. : IEEE 802. 15 -16 -0575 -00 • draft-ietf-core-coap-tcp-tls-03 – changes required to use Co. AP over TCP, TLS, and Web. Sockets transports • draft-ietf-core-resource-directory-08 – direct discovery of resources is not practical due to sleeping nodes, dispersed networks, or networks where multicast traffic is inefficient. These problems can be solved by employing an entity called a Resource Directory (RD), which hosts descriptions of resources held on other servers, allowing lookups to be performed for those resources. – tutorial of above starts at page 13 of http: //ipj. dreamhosters. com/wpcontent/uploads/issues/2016/ipj 19 -2. pdf • draft-ietf-core-links-json-06 – represent collections of Web links in JSON for outside of constrained environments, and in CBOR for inside constrained environments. This specification defines a common format for this. – In last WGLC • Roadmap – relationship to LWM 2 M; should COMI and LWM 2 M converge, and, if yes, how? Submission Slide 134 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> Core (Tuesday 2016 -07 -19) • • SC IETF doc. : IEEE

<July 2016> Core (Tuesday 2016 -07 -19) • • SC IETF doc. : IEEE 802. 15 -16 -0575 -00 draft-ietf-core-block-21. txt is in the RFC editor queue. draft-ietf-core-etch– 01: WGLC is completed, issues discussed. To be determined: 4. 12 vs. 4. 09. When that is settled, updated version to be submitted to IESG. draft-ietf-core-links-json– 06 is in the middle of WGLC and was briefly discussed. There are some claims in the document that it considers a larger world of JSON-LD etc. ; the intention however is to be a simple RFC 6690 mapping and those claims will be cut down. draft-ietf-core-coap-tcp-tls– 03: The merge of TCP/TLS, Websockets, Signaling, and BERT was completed in this version. Several issues discussed. In particular, there was in-room consensus to follow the lead of RFC 7252 and make the use of TLS mandatory to implement with the larger number of transport schemes now available draft-silverajan-core-coap-protocol-negotiation-03 was discussed. There is good interest in this ongoing work, some of which is also related to other ongoing work in T 2 TRG. draft-ietf-core-resource-directory– 08 is nearing WGLC; reviewers have been identified. Brief introductions were made for – draft-gomez-core-tcp-constrained-node-networks– 00, – draft-groves-coap-webrtcdc– 00, – draft-zheng-core-coap-lantency-evaluation– 00. For draft-bormann-core-cocoa-04, there was in-room consensus for working-group adoption; to be confirmed on the list. Submission Slide 135 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> Core (Thursday 2016 -07 -21) • • • SC IETF doc. :

<July 2016> Core (Thursday 2016 -07 -21) • • • SC IETF doc. : IEEE 802. 15 -16 -0575 -00 draft-ietf-core-http-mapping-13 took some minor fixes and has been submitted to IESG For the core-interfaces draft, the split was confirmed into draft-ietf-core-interfaces– 05 and draftgroves-core-dynlink– 00 (plus some material that was removed and maybe can be picked up by T 2 TRG); as not enough people had read the split-off draft-groves, we will take the otherwise obvious adoption to the list. draft-ietf-core-yang-cbor– 02: target is to do some additional validation with the Net. Mod experts and check again by end of September. There a couple of implementations ongoing. draft-somaraju-core-sid– 01. One suggestion was to use an OID subtree. Too few people had read the newest version for room consensus on working-group adoption, but no one against; to be taken to the list. draft-veillette-core-cool & draft-vanderstok-comi: around 6 people read the draft, agreement on splitting out the more advanced features so a basic specification can be completed by the end of the year. Work ongoing on mapping YANG and LWM 2 M/IPSO objects. Some concerns about the diagnostic value of SIDs in debugging and possible problems with YANG "choice", work needs to continue. draft-hartke-core-e 2 e-security-reqs– 01: good rewrite; further requirements are being identified, discussion to be taken to the mailing list. draft-selander-ace-object-security– 05: room consensus to adopt as WG item, to be confirmed on the mailing list. draft-ietf-core-senml– 02: good ongoing discussion that should be completed on the mailing list. draft-koster-core-coap-pubsub– 05: brokerless pubsub has been added. Take adoption to mailing list but clear room consensus already (~10 people), reviewers identified. Submission Slide 136 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> 6 lo SC IETF doc. : IEEE 802. 15 -16 -0575 -00

<July 2016> 6 lo SC IETF doc. : IEEE 802. 15 -16 -0575 -00 • draft-ietf-6 lo-dispatch-iana-registry-03 – This document updates RFC 4944 and RFC 6282 by defining the ESC extension byte code points including registration of entries for known use-cases at the time of writing of this document – Ready for IESG submission after draft edits • draft-ietf-6 lo-paging-dispatch-02 – introduces a new context switch mechanism for 6 Lo. WPAN compression, expressed in terms of Pages and signaled by a new Paging Dispatch – Passed last call but missing Shepard Review • draft-thubert-6 lo-rfc 6775 -update-00 – update to 6 Lo. WPAN Neighbor Discovery to clarify the role of the protocol as a registration technique, and provide enhancements to the registration capabilities, in particular for the registration to a backbone router for proxy ND operations • draft-ietf-6 lo-privacy-considerations-01 – how a number of privacy threats apply to technologies designed for IPv 6 over networks of resource-constrained nodes, and provides advice to protocol designers on how to address such threats in adaptation layer specifications for IPv 6 over such links. Submission Slide 137 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> ROLL SC IETF doc. : IEEE 802. 15 -16 -0575 -00 •

<July 2016> ROLL SC IETF doc. : IEEE 802. 15 -16 -0575 -00 • When to use RFC 6553, 6554 and IPv 6 -in-IPv 6 • draft-ietf-roll-useofrplinfo • Presenter noted that ‘draft-ietf-6 man-rfc 2460 bis-05’ could have a positive impact on routing and presented three scenarios with and without 2460 bis • Source-Routed Multicast for RPL – draft-bergmann-bier-ccast – Use of Bloom filter concept – Concept uses a hash function, noting that although false positives create spurious transmissions wasting energy, the behavior is still functionally correct. Question as to how bad is energy waste compared to the energy saved by sending less packets. – Presented a numerical analysis with up to 100 forwarders – Introduces MLAO. Might use a 6 Lo. RH header. – Noted that this was implemented in Contiki in 2013 (along with a non-storing mode) Submission Slide 138 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> SC IETF ROLL doc. : IEEE 802. 15 -16 -0575 -00 •

<July 2016> SC IETF ROLL doc. : IEEE 802. 15 -16 -0575 -00 • DIS modifications - draft-gundogan-roll-dis-modifications-00 - desiring to make it quieter, there are 3 behaviors to modify: 1. 2. – DIS type and Trickle timer: Proposes DIS flags to have better control on responses, and response spreading in time if collisions are expected. Selectivity of DIS requests: described current behavior of selectivity of multicast DIS messages and proposed improved behavior. Information carried by DIO. Desired: be able to tell in the DIS which information should be included in DIO response; proposed R flag and TLV to do that. • MPL Forwarder Select – draft-vanderstok-roll-mpl-forw-select – dense network with MPL forwarding creates lots of forwarding. – to reduce the number of forwarders an algorithm that automatically selects the forwarders could be advantageous. Assumption used is net is relatively stable. • AODV-RPL – draft-satish-roll-aodv-rp • No-Path DAO Problem Statement – draft-jadhav-roll-no-path-dao-ps-00 Submission Slide 139 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> Detnet SC IETF doc. : IEEE 802. 15 -16 -0575 -00 •

<July 2016> Detnet SC IETF doc. : IEEE 802. 15 -16 -0575 -00 • Use cases – update – draft-ietf-detnet-use-cases-10 – Slides: http: //www. ietf. org/proceedings/96/slides-96 -detnet 1. pptx • Det. Net Architecture – draft-finn-detnet-architecture-06 • Det. Net Data Plane Protocol and Solution Alternative – draft-dt-detnet-dp-alt-01 • Det. Net service model – draft-varga-detnet-service-model-00 • Det. Net flow information model – draft-zha-detnet-flow-info-model-00 Submission Slide 140 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 lp-wan (bof)

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 lp-wan (bof) • Applicability and Gap analysis – draft-minaburo-lp-wan-gap-analysis – draft-gomez-lpwan-ipv 6 -analysis (Analysis of IPv 6 over LPWA: design space and challenges) • Technology slot 1: 3 GPP LPWA (NB-Io. T / EC-GSM-Io. T / Cat-M 1) • • • draft-ratilainen-lpwan-nb-iot-00 use licensed band from already deployed networks instead of unlicensed bands such as sigfox three operation modes: use one gsm band, use the guard band (whitespace) in band using LTE band receiver sensitivity -141 d. Bm, QPSK, 180 k. Hz bandwidth. Packet data convergence protocol (PDCP) right below IP, 1600 bytes. Use all the already existing mechanisms (NAS: Non access stratum and AS: Access Stratum) Mutual authentication. Shared secrets on the user. Submission Slide 141 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 lp-wan (bof)

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 lp-wan (bof) • Technology slot 2: IEEE LPWA (Wi-SUN, IEEE 802. 15. 4 g) • • https: //www. ietf. org/proceedings/96/slides-96 -lpwan-8. pdf LPWAN’s target is narrower than the domain covered by IEEE 802. 15. 4 • 802. 15. 4 is highly flexible with a range of different capabilities • Allows for optimized L 1/L 2 approaches depending on application (in-building, Industrial Io. T, Field Area Networks of various classes, etc) • Supports both structured and ad hoc, self forming network architectures • Technology slot 3: Lo. Ra • • draft-vilajosana-lpwan-lora-hc-00 Modulation - Lo. Ra (spread spectrum), Frequency - Sub-GHz ISM Channel bandwidth - 125 -500 KHz, Data rate - 300 bps – 50 kbps Gateway sensitivity -142 d. Bm/300 bps, Range 10+ km, deep indoor coverage Payload size 11 – 242 bytes (variable) Battery consumption 10 m. A RX / 32 m. A (14 d. Bm) TX -- 10+ year Communication type Bidirectional unicast, network multicast Submission Slide 142 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> lp-wan (bof) doc. : IEEE 802. 15 -16 -0575 -00 SC IETF

<July 2016> lp-wan (bof) doc. : IEEE 802. 15 -16 -0575 -00 SC IETF • Technology slot 4: SIGFOX • • • draft-zuniga-lpwan-sigfox-system-description-00 Uplink • Channelization mask: 100 Hz (600 Hz in the USA) • Uplink baud rate: 100 baud (600 baud in the USA), Modulation scheme: DBPSK • Link budget: 155 d. B (or better) • In Europe, the UNB uplink frequency band is limited to 868, 00 to 868, 60 MHz, with a maximum output power of 25 m. W and a maximum mean transmission time of 1% Downlink • Channelization mask: 1. 5 k. Hz, Downlink baud rate: 600 baud Modulation: GFSK • TX power: 500 m. W (4 W in the USA), Link budget: 153 d. B (or better) • In Europe, the UNB downlink frequency band is limited to 869. 40 to 869. 65 MHz, with a maximum output power of 500 m. W with 10% duty cycle • Unicast asynchronous communications • • Submission Max limitation: 140 Uplink vs. 4 Downlink messages per day Limitations can be slightly relaxed depending on system conditions Fragmentation and encryption at application layer L 2 security • • Message authentication code and unique device ID Key management: pre-provisioned Slide 143 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 lp-wan (bof)

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 lp-wan (bof) Charter Point 1 – Produce an Informational document describing and relating some selected LPWA technologies. This work will document the common characteristics and highlight actual needs that the IETF could serve; but it is not an intention to provide a competitive analysis. It is expected that the information contained therein originates from and is reviewed by LPWA stakeholders, and that this WG may leverage the resulting document to suggest new activity in other WGs Charter Point 2 – Produce best practice documents highlighting potential areas where IETF technologies may be leveraged; these documents may eventually be published as Informational RFCs. It is an expectation that the resulting document(s) may contribute to the interaction with LPWA stakeholders and lead to additional work in the future. Envisioned topics include security, management, and cross-layer optimizations. Submission Slide 144 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 lp-wan (bof)

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 lp-wan (bof) Charter Point 3 – Produce Standard Track documents to enable the compression of a Co. AP/UDP/IPv 6 packet over LPWA. Considering the extreme constraints, the work will focus on a generic YANG data model to describe the compression, and protocols to install the related state at the compression end-points; the work will also include, for the selected technologies, specific Standard Track documents to describe how the fields relevant to the decompression are encoded over the air, if any Charter Point 4 – Produce a document to enable the fragmentation of larger packets over LPWA, either as a Best Practice leveraging existing technology, or as new Standard Track document if that is deemed necessary. Submission Slide 145 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 IEEE 802.

<July 2016> SC IETF doc. : IEEE 802. 15 -16 -0575 -00 IEEE 802. 15 and IETF liaison communications 6 lo: Neighbor discovery (RFC 6775) could be further optimized to reduce neighbor discovery traffic. SC IETF will define edits to RFC 6775 to show possible optimization. lp-wan: SC IETF can identify solutions to numerous problems stated for lp-wan. SC IETF could produce a document describing the behaviors in 802. 15. 4 (LECIM) and 802. 15. 9 (KMP) that address the noted problems. 6 lo: SC IETF could identify header compression methods that apply to IP but could be extended to MAC and PHY by IEEE 802. 15. Submission Slide 146 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802.

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802. 15 and 802. 1 Agenda approval Wi. Fi liaison stating a perceived market need to interwork between 802. 11 ah and 802. 15. 4 g at layer 2 802. 15 Relevant TG status reports Update on 802. 15. 10: L 2 R status Update on 802. 15. 12: ULI status Update on 802. 15. 3 m: Revision 802. 15. 3 d: 100 Gbit/s Wireless 802. 15. 3 e: High Rate Close Proximity 802. 1 efforts that should be considered by 802. 15 Submission Slide 147 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802.

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802. 15 and 802. 1 Wi. Fi liaison stating a perceived market need to interwork between 802. 11 ah and 802. 15. 4 g at layer 2 Submission Slide 148 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802.

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802. 15 and 802. 1 Update on 802. 15. 12: ULI status Working on Deliverables and Architecture Deliverable items: Define ULI architecture to provide extensibility 802. 15. 4 device configuration (MAC & PHY) Regulatory configuration, e. g. PHY Configuration as per country of operation, Device class, Duty cycle constraints, CCA settings (time, threshold, mode) Protocol differentiation (dispatch) via Ether. Type Align IEEE 802. 15. 9 and IEEE 802. 15. 10 with ULI L 2 protocol extensions from other organizations, e. g. IETF 6 tisch 6 top, et al Submission Slide 149 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802.

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802. 15 and 802. 1 Update on 802. 15. 12: Architecture proposal Submission Slide 150 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802.

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802. 15 and 802. 1 Update on 802. 15. 10: L 2 R status Sponsor Ballot Results RESPONSE RATE 111 eligible people in this ballot group. 84 votes received = 75% returned (meets 75% min. return rate) 76 affirmative votes 3 total negative votes with comments 3 negative votes with new comments 0 negative votes without comments 5 abstention votes: (Lack of time: 5) APPROVAL RATE The 75% affirmation requirement is being met. 76 affirmative votes 3 negative votes with comments 79 votes = 96% affirmative COMMENTS 136 (53 must be satisfied) Submission Slide 151 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802.

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802. 15 and 802. 1 Update on 802. 15. 3 m: Revision done and published, now uses a 48 -bit MAC address 802. 15. 3 d: 100 Gbit/s Wireless Preliminary proposals have been presented and are discussed at the July 2016 plenary meeting 802. 15. 3 e: High Rate Close Proximity 802. 15. 3 e has completed letter ballot and plans to start sponsor ballot at the end of this week (by 30 July). Submission Slide 152 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802.

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 Joint Meeting between 802. 15 and 802. 1 efforts that should be considered by 802. 15 ? Submission Slide 153 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 SC WNG Two presentations:

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 SC WNG Two presentations: "History and Implementation of the IEEE 802 Security Architecture” by Meareg Abreha IEEE Standards for Low Power Wide Area Networks by Jörg Robert Submission Slide 154 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 SC Accomplishments Joint Meeting

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 SC Accomplishments Joint Meeting between 802. 15 and 802. 1 Wi. Fi liaison stating a perceived market need to interwork between 802. 11 ah and 802. 15. 4 g at layer 2 Consensus at the meeting was that the liaison request was not sufficiently detailed to indicate why a router would not fulfill the use case needs. Further consensus that 802. 1 and 802. 15 will draft a reply to the Wi. Fi request asking for additional details before any effort is started. Reply to Wi-Fi request is document 15 -16 -0489 -01 which was approved by 802. 15 TG status was reported Maintenance No Standards issues reported No issues with Operations Manual reported Submission Slide 155 <Pat Kinney>, <Kinney Consulting LLC>

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 SC Accomplishments IETF Status

<July 2016> doc. : IEEE 802. 15 -16 -0575 -00 SC Accomplishments IETF Status Update: 6 tisch, Core, 6 lo, Roll, Detnet, and lp-wan Next session add Ace and T 2 TRG reports Three liaison communications were requested 6 lo: Neighbor discovery (RFC 6775) could be further optimized to reduce neighbor discovery traffic. SC IETF will define edits to RFC 6775 to show possible optimization. lp-wan: SC IETF can identify solutions to numerous problems stated for lp-wan. SC IETF could produce a document describing the behaviors in 802. 15. 4 (LECIM) and 802. 15. 9 (KMP) that address the noted problems. 6 lo: SC IETF could identify header compression methods that apply to IP but could be extended to MAC and PHY by IEEE 802. 15. WNG presentations IEEE Standards for Low Power Wide Area Networks (15 -16 -486 -01)by Jörg Robert Sufficient interest was shown to form an interest group History and Implementation of the IEEE 802 Security Architecture (15 -16 -0489 -01) by Meareg Abreha 802 E Privacy Report (11 -16 -1029 -00) by Juan Carlos Submission Slide 156 <Pat Kinney>, <Kinney Consulting LLC>

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Upcoming Sessions • •

July 2016 doc. : IEEE 802. 15 -16 -0575 -00 Upcoming Sessions • • September 11 -16, 2016, Marriott Warsaw, Poland, 802 Wireless Interim Session. * November 6 -11, 2016, Grand Hyatt San Antonio, TX, USA, 802 Plenary Session. January 15 -20, 2017, Hyatt Regency Atlanta, GA, USA, 802 Wireless Interim Session. * March 12 -17, 2017, Hyatt Regency Vancouver, 802 Plenary Session. May 7 -12, 2017, Daejeon Convention Center, Daejeon Korea (TBC), 802 Wireless Interim Session. * July 9 -14, 2017, Estrel Hotel and Convention Center, Berlin, Germany, 802 Plenary Session. September 10 -15, 2017, Hilton Waikoloa Village, Kona, HI, USA, 802 Wireless Interim Session. * November 5 -10, 2017, Caribe Hotel and Convention Center, Orlando, FL, USA, 802 Plenary Session. Submission Slide 157 Robert F. Heile, Wi-SUN Alliance