July, 2010 IEEE 802. 15 -10 -0575 -02 -mban Project: IEEE P 802. 15

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban Project: IEEE P 802. 15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for MBAN Study Group, July 2010 Meeting Date Submitted: July 14 2010 Source: Raymond Krasinski, Philips 345 Scarborough Road, Briarcliff Manor, NY 10510 Voice: 1 -914 -333 -9687, FAX: 1 -914 -332 -0615, E-Mail: raymond. [email protected] com Abstract: Closing report for MBAN Study Group Purpose: To outline the accomplishments of the group during the July 2010 Plenary meeting Notice: This document has been prepared to assist the IEEE P 802. 15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P 802. 15. Submission Slide 1 Raymond Krasinski, Philips

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban IEEE 802. 15 MBAN SG

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban IEEE 802. 15 MBAN SG Closing Report 2 nd Meeting of the MBAN Study Group San Diego, USA July 11 -15, 2010 Submission Slide 2 Raymond Krasinski, Philips

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban Introduction • History: MBAN Study

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban Introduction • History: MBAN Study Group voted into existence at the March 2010 (Orlando) 802. 15 meeting • Chair: Raymond Krasinski, Philips • Sect: David Evans, Philips Submission Slide 3 Raymond Krasinski, Philips

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban Mission of MBAN SG •

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban Mission of MBAN SG • Study the prospects of an amendment of 802. 15. 4 for MBAN – If a task group is created it is expected to define any modifications required to the existing PHY and the possible modifications to the MAC needed to support the PHY that complies with the FCC MBAN regulations • Generate a draft MBAN PAR and 5 C • Prepare a report to accompany PAR and 5 C Submission Slide 4 Raymond Krasinski, Philips

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban Progress July 2010 Meeting •

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban Progress July 2010 Meeting • Discussed technical topics identified in May (Beijing) meeting – Coexistence issues – MBAN and 15. 6 Parameters – Transmit power and absorption rates • Held a joint meeting with TG 6 to discuss coexistence issues • Updated the draft PAR and 5 C Submission Slide 5 Raymond Krasinski, Philips

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban Planning • Achieve consensus on

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban Planning • Achieve consensus on the PAR • Achieve consensus on the 5 Criteria • Address any new technical issues that arise on the MBAN reflector • Discuss progress in the FCC MBAN regulatory deliberations Submission Slide 6 Raymond Krasinski, Philips

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban Motion • That 802. 15

July, 2010 IEEE 802. 15 -10 -0575 -02 -mban Motion • That 802. 15 WG request approval from the 802 EC to renew the MBAN study group. Moved by: Seconded by: Vote: y/n/a Submission Slide 7 Raymond Krasinski, Philips