JPL Update Danan Dong Michael Heflin Sharon Kedar

  • Slides: 15
Download presentation
JPL Update Danan Dong Michael Heflin Sharon Kedar Brian Newport Frank Webb JPL Status

JPL Update Danan Dong Michael Heflin Sharon Kedar Brian Newport Frank Webb JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Overview • GIPSY Processing status • NASA REASo. N Project Status JPL Status Report,

Overview • GIPSY Processing status • NASA REASo. N Project Status JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Processing • Bias fixing strategy – 5 -7 Clusters per day • CPU intensive

Processing • Bias fixing strategy – 5 -7 Clusters per day • CPU intensive • Sensitivity to station outages – 1 Cluster per day constructed from baselines • Distributable across many CPUs • Insensitive to station outages • • Developed and tested last year Implemented in April 2003 Moving to web services for antenna metadata New GIPSY version in Nov. 2003 JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Solutions • Complete through March 31, 2004. – Available on internet – Free network

Solutions • Complete through March 31, 2004. – Available on internet – Free network • Raw solutions • Loose covariance – Accounts for frame noise JPL Status Report, SCIGN Annual Meeting, 4/26/2004

REASo. N • • • Reminder of Our Goals How we are organized A

REASo. N • • • Reminder of Our Goals How we are organized A High Level Requirement High Level Architecture Baseline Schedule Status JPL Status Report, SCIGN Annual Meeting, 4/26/2004

REASo. N Goals • Apply modern IT methodology within SCIGN to: – Produce and

REASo. N Goals • Apply modern IT methodology within SCIGN to: – Produce and disseminate higher-level data products to a larger community • • Scientists Government agencies (Federal, State, and Local) Surveyors GIS professionals • Product levels adopted by PBO JPL Status Report, SCIGN Annual Meeting, 4/26/2004

REASo. N Goals • Build on current capabilities within SCIGN for data archiving, information

REASo. N Goals • Build on current capabilities within SCIGN for data archiving, information systems, and data analysis to disseminate the following products: – – – Geodetic position time series Crustal motion models Strain rate maps Geologic fault models Near-real-time earthquake response information Geodetic reference systems for precise GIS and surveying • Improve capabilities in – – Archiving End-user interfaces Delivery mechanisms Data modeling • Open source project based on a redundant, multi-tiered “Virtual Archive” for GPS applications. JPL Status Report, SCIGN Annual Meeting, 4/26/2004

How we are organized • Around Four systems – Product Input • Seamless Archive

How we are organized • Around Four systems – Product Input • Seamless Archive • Web services – GPS Data Processing • GAMIT and GIPSY – Product Generation • QOCA Based – Product Output • Virtual Archive • Web services – Meta data – Products • Plus two NASA requirements – NASA SEEDs participation • Standards Working Group – Open Source Project • Virtual Archive JPL Status Report, SCIGN Annual Meeting, 4/26/2004

A High Level Requirement • Need • Processing centers and processes use the same

A High Level Requirement • Need • Processing centers and processes use the same input data • Goal • All processing retrieves data from a common source • Objective • • • Seamless Archive Web services Pull data at time of analysis Push results into archive Pull products from archive for distribution JPL Status Report, SCIGN Annual Meeting, 4/26/2004

High Level Architecture JPL Status Report, SCIGN Annual Meeting, 4/26/2004

High Level Architecture JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Architecture Interfaces • Next slide shows – Functions on the diagonal – Interfaces on

Architecture Interfaces • Next slide shows – Functions on the diagonal – Interfaces on the off diagonals • Who and what in the off diagonal boxes JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Architecture Interfaces JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Architecture Interfaces JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Baseline Schedule (draft) • Key milestones for the remainder of CY 04 are: –

Baseline Schedule (draft) • Key milestones for the remainder of CY 04 are: – Approved Task Plan based on negotiated funding profile (ASAP) – High level system requirements definition and design (Jul 04) – Design and development of modifications to QOCA for combined geodetic time series (Level-1) production software (Dec 04) – Design and development of automated GPS processing interfaces with GDPSES (Dec 04) • Key milestones for CY 05 - CY 08 are: – Design, development, and implementation of automated Level 1 data products (Jul 05) – Design and development of modifications to QOCA for combined velocity field (Level-2) production software (Dec 05) – Design, development, and implementation of automated Level 2 data products (Jul 06) – Design and development of modifications to QOCA for geophysical parameter (Level-3) production software (Dec 06) – Design, development, and implementation of automated Level 3 data products (Jul 07) – Integrate Level-3 products with independent data products (Dec 07). – Incorporate PBO data into production process (Jul 08) – Deliver Adaptive Seamless Achive (Jul 08) – Deliver GPS Explorer (Jul 08) – Deliver Spatial Services (Jul 08) – Deliver Open Source Virtual Archive (Jul 08) JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Status • Organized into initial teams • Worked most of the high level architecture

Status • Organized into initial teams • Worked most of the high level architecture • Working requirements and definitions of interfaces for CY 04: – Processing – Archive – Web services • Working formats – Internal product and data sharing – Prototyped XML schema and formats for metadata and time series products • Product generation – Testing QOCA against GLOBK • Loosely constrained agrees to sub-millimeter level JPL Status Report, SCIGN Annual Meeting, 4/26/2004 – Initial modifications to QOCA for S/T filter has begun

Status • Project library – Document sharing web site for team • Configuration control

Status • Project library – Document sharing web site for team • Configuration control • Password protected • https: //scign-lib. jpl. nasa. gov • NASA – Currently on startup funds – Draft task plan near completion for remaining funds • PBO – Initial discussions have received a “Ho-Hum” response JPL Status Report, SCIGN Annual Meeting, 4/26/2004