January 2018 doc IEEE 802 11 180265 r

  • Slides: 7
Download presentation
January 2018 doc. : IEEE 802. 11 -18/0265 r 0 AANI SC Closing Report

January 2018 doc. : IEEE 802. 11 -18/0265 r 0 AANI SC Closing Report 2017 Date: 2018 -01 -19 Authors: Report Slide 1 Joseph Levy (Interdigital)

January 2018 Abstract doc. : IEEE 802. 11 -18/0265 r 0 Abstract This Document

January 2018 Abstract doc. : IEEE 802. 11 -18/0265 r 0 Abstract This Document forfor AANI SC, This Documentisisthe theclosingreport AANI SC, November 2016 Meeting in San Antonio, TX January 2018 Meeting in Irvine, California, USA Report Slide 2 Joseph Levy (Interdigital)

January 2018 doc. : IEEE 802. 11 -18/0265 r 0 802. 11 AANI SC

January 2018 doc. : IEEE 802. 11 -18/0265 r 0 802. 11 AANI SC – November 2017 • Meeting Goals: 1. Complete a draft of an 802. 11 IMT-2020 Proposal 2. Gain 802. 11 WG approval of the draft 802. 11 IMT-2020 Proposal 3. Gain 802. 18 SC approval of the draft 802. 11 IMT-202 Proposal 4. Plan support of the Proposal at the ITU-T WP 5 D Meeting 31 -01 -2018 5. Contributions on topics related to 3 GPP Interworking or NEND ICA • Agenda: See 11 -17/1867 r 4, met for 8 hours • Meeting Activity: • Reviewed AANI SC Status/Background • Reviewed draft of: SKELETON FOR A CANDIDATE IMT-2020 RIT BASED ON IEEE 802_11 (11 -17/1889 r 2) • Discussed the content and desire to submit an 802. 11 based IMT-2020 RIT proposal to the January ITU-R WP 5 D meeting in Seoul. • Discussed possible additional AANI work. Report Slide 3 Joseph Levy (Interdigital)

January 2018 doc. : IEEE 802. 11 -18/0265 r 0 Meeting Report/Minutes/Summary 1/2 Mid-week:

January 2018 doc. : IEEE 802. 11 -18/0265 r 0 Meeting Report/Minutes/Summary 1/2 Mid-week: 11 -18/0232 r 0 AANI SC Report to the WG January 2018 Minutes, AANI SC, January 2018 (11 -18/0228 r 2) Contributions received after the mid-week 802. 11 plenary: • 11 -17/1889 r 03 – AANI skeleton for a candidate IMT 2020 RIT based on IEEE 802. 11 • 11 -18/0256 r 0 – AANI 802. 11 ax for IMT-2020 • This document provides an analysis of 802. 11 ax capabilities vis-à-vis the IMT 2020 requirements for the e. MBB Indoor Hotspot and Dense Urban scenarios. • It also discusses the features in other unlicensed spectrum technologies like LAA and Multe. Fire. • It also discusses 802. 11 ax features with the proposed features in NRUnlicensed in order to meet the IMT-2020 requirements. Report Slide 4 Joseph Levy (Interdigital)

January 2018 doc. : IEEE 802. 11 -18/0265 r 0 Meeting Report/Minutes/Summary 2/2 Straw

January 2018 doc. : IEEE 802. 11 -18/0265 r 0 Meeting Report/Minutes/Summary 2/2 Straw Poll from Thursday AM 2 meeting: AANI SC recommends that 802. 11 WG should: 1. Approve 11 -17/1889 r 3 2. Approve 11 -17/1889 r 2 3. Authorize AANI SC to continue work on an IEEE 802. 11 contribution to ITU-R WP 5 D towards an 802. 11 based IMT 2020 RIT Proposal, through March F 2 F 4. Authorize AANI SC to continue work to produce a IMT 2020/802. 11 requirements analysis 5. Stop all AANI SC activity related to an IEEE 802. 11 contribution to ITU-R WP 5 D or addressing an 802. 11 based IMT-2020 RIT Proposal. 1) 0 2) 0 3) 12 4) 14 5) 21 Report Slide 5 Joseph Levy (Interdigital)

January 2018 doc. : IEEE 802. 11 -18/0265 r 0 Call for Contributions To

January 2018 doc. : IEEE 802. 11 -18/0265 r 0 Call for Contributions To progress the work in AANI SC contributions are requested: Related to 3 GPP SA TSG Reviews/tutorials on the 3 GPP core network and/or 802. 11 interworking Reviews/tutorials on the completed 3 GPP SA studies for 5 G: TR 23. 799, TR 33. 899 Reviews/Tutorials on 3 GPP SA R 15 (5 G) Activity: TS 23. 501, TS 23. 502, TS 33. 501 Any other 3 GPP next. Gen Core network and 802. 11 interworking Related to NEND ICA Related to Industrial Networking Related to Future Data Centre Networks Other Potential additional topics based on 802. 11 WG authorization 802. 11 IMT-2020 Submission 5 G/802. 11 requirements analysis Report Slide 6 Joseph Levy (Interdigital)

January 2018 doc. : IEEE 802. 11 -18/0265 r 0 Future Session Planning Teleconference:

January 2018 doc. : IEEE 802. 11 -18/0265 r 0 Future Session Planning Teleconference: Dependent on topics the WG has authorized as required with 10 days’ notice (TBC) 4 -9 March 2018 F 2 F, Hyatt Regency O'Hare, Rosemont, Illinois, USA: Topics for discussion/contribution: 1. Potential topics authorized by the 802. 11 WG 2. 3 GPP Interworking 3. NEND IC activity Meeting time requested: 2? sessions - Monday PM 1, and Thursday AM 2 – TBC Report Slide 7 Joseph Levy (Interdigital)