JANAF Workshop Flexibility of JANAF transportation system capacities
JANAF Workshop Flexibility of JANAF transportation system capacities Željko Skodlar, JANAF, Commercial Division ZAGREB, 24 March 2015
INTRODUCTION JANAF’s 40 th anniversary, 9 September 1974 – Construction contract for use of JUNA First tanker – September 1979 Substantial experience on viability NO unresolved situation, NO stoppage, NO accidents
JANAF - in general JANAF – international oil pipeline for supply of refineries in South Eastern and Central Europe JANAF system consists of: • 622 km long pipeline • Omišalj Terminal • Sisak Terminal • Virje Terminal • Slavonski Brod Terminal • JANAF-Žitnjak, Zagreb – Petroleum Products Terminal Activities: - Pipeline transport of crude oil: 43% for local users and 57% foreign users - Storage of crude oil and petroleum products (37, 5% of total revenues in 2010) 1979 -2015 total transported quantities - 200 mil. t (in a day or two) NEWLY CONSTRUCTED: 8 storage tanks for crude oil, each of 80. 000 m 3, with total capacity of 640. 000 m 3 with related infrastructure and for purposes of national compulsory stocks, reversible transport and commercial storage Ownership: AUDIO/HZMO 37, 259%, HANDA 26, 28%, INA 11, 795%, AUDIO/RH 10, 665%, HEP 5, 357%, AUDIO/DAB 4, 305% and small shareholders and funds Number of employees – up to 400
JANAF’s System From the sea to inland ADRIATIC SEA
JANAF in figures
JANAF capacities - 1979 INA-REFINERY SISAK INA-REFINERY RIJEKA REFINERY LENDAVA, SLOVENIA REFINERY BROD, BOSNIA AND HERZEGOVINA NIS, SERBIA TRANSIT, HUNGARY, SLOVAKIA TOTAL DESIGNED CAPACITY INSTALLED CAPACITY CAPACITIES, DESIGNED AND RESERVED 1974 (MTA) 8, 00. . . 2, 00 5, 00 9, 00 10, 00 34, 00 20, 00 6
JANAF development phases in past 40 years 1979 -1980: beginnings and start-up From the beginning readiness for adjustment to market requirements of clients 1981: Hungarian and Czechoslovakian withdrawal due to Druzhba orientation 1985: Inclusion of north branch, bidirectional (reversal flow) operation on Virje-Sisak section 1990: Hungarian and Czechoslovakian returning to supply via Omišalj as alternative to Druzhba Peak in 1991: expected transport of 12 million tons; 16 September - interruption of transport; realized transport up to then 8, 7 million tons 1991 -1995: war circumstances, orientation toward storage Since 1995: normalization of oil pipeline operation, overview per years Extension of acitivities to crude oil and petroleum products storage and revenues towards 70/30% today Construction of new storage tank farms at Sisak, Omišalj, Žitnjak 2013: reinclusion of MOL in south supply route, with bidirectional operation on Virje-Sisak section 2015 and afterward: MOL and expected inclusion of Slovnaft refinery into supply process through Omišalj Ukrainian crisis and JANAF increasing role in European security of crude oil supply by 2030
JANAF’s 40 years in chart JANAF in 1991 2, 7 t/year
JANAF, 1975. and 40 years later JANAF increasing role in European security of crude oil supply by 2030 The diversification crude oil sources and a possibility for partial replacement optimizing the crude oil pool in Central and Eastern Europe
EU aim to realize “Central Eastern European Oil Pipeline Ring" by establishing links between the North and South Druzhba, both in the West and East as follows: New pipelines to connect the North and the South branch of the Druzhba (1 and 2): 1. Construction of the pipeline between the refineries in Litvinov (CZ) and Spergau (DE) 2. Construction of the pipeline between Adamowao (PL) and Brody (UA) Pipeline to enforce the link between from the Baltic Sea to the Northern Druzhba (3): 3. Construction of the second line of the Pomeraninan pipeline (PL) from Gdansk to the Plock refinery Pipelines to enforce the existing links/establish a new link from the Adriatic Sea to the Southern Druzhba (4 and 5): 4. Reconstruction /upgrade/maintenance and capacity increase of JANAF and Adria pipelines 5. BSP - Bratislava Schwechat Pipeline
Energy Infrastructure Package for Europe 11 (Source : Study on the technical aspects of variable use of oil pipelines coming into the EU from third countries; Purvin&Gertz)
European oil pipelines system and supply routes around JANAF ADRIA JANAF PRESSURE ON TAL - 105 % CAPACITY
JANAF, 1975. and 40 years later JANAF increasing role in European security of crude oil supply by 2030 The diversification crude oil sources and a possibility for partial replacement optimizing the crude oil pool in Central and Eastern Europe Yes, we can do it NOW !
JANAF capacities - 2015 INA-REFINERY RIJEKA CAPACITIES, 2015 (MTA) 7, 00 INA-REFINERY SISAK 8, 00 OPTIMA, BROD, NIS, SERBIA 14, 00 TRANSIT, HUNGARY, SLOVAKIA DESIGNED CAPACITY, OMIŠALJ-SISAK PIPELINE JANAF INSTALLED CAPACITY 14, 00 34, 00 20, 00 + 14
CAPACITIES OF JANAF PIPLINE SECTIONS Omišalj-Sisak: 34 mil. t Sisak-East: 14 mil. t Sisak-North: 14 mil. t
Competitive routes Data based on information obtained from publicly available sources. Not the companies official ones.
READY TO SERVE ALL YOUR NEEDS