ISO TC 204 Structure 12 Active Working Groups

  • Slides: 6
Download presentation

ISO TC 204 Structure } 12 Active Working Groups: ● ● ● WG 1:

ISO TC 204 Structure } 12 Active Working Groups: ● ● ● WG 1: Architecture WG 3: ITS Database Technology WG 4: AVI/AEI (Automated Vehicle/Equipment ID) WG 5: EFC/ETC (Electronic Fee & Toll Collection) WG 7: Fleet, Commercial & Freight Management WG 8: Public Transport & Emergency Services WG 9: Integrated Transport Info, Mgmt & Control WG 10: Traveler Information Systems WG 14: Veh/Roadway Warning & Control Systems WG 16: Wide Area Communication Systems WG 17: Nomadic Devices in ITS Systems WG 18: Cooperative ITS + Ad-hoc groups: Spectrum, i. Mobility, Big Data 2

Current TC 204 Activities } In addition to progressing current WIs…. ● 77 Active

Current TC 204 Activities } In addition to progressing current WIs…. ● 77 Active + 51 PWIs } Building collaboration with TC 22 as well as vehicle OEMs individually, Tier 1 s, and assorted suppliers/supporters ● Active safety initiatives ● Vehicle gateway ● Ex. Ve initiative } Planning for the future ● Highly automated & autonomous vehicles 3

TC 22 – TC 204 Mo. U Summary } We will: } Use existing

TC 22 – TC 204 Mo. U Summary } We will: } Use existing standards where applicable } Not duplicate work – applies to both existing and new standards } Inform each other of planned new work – before it gets rigidly set into the ISO system } Place new work where the most relevant competence resides } Handle disagreements at the lowest possible level ● But elevate if required 4

Vehicle ITS Gateway – Standardization ITS Standards 1. ITS real-time Data Provider 2. ITS

Vehicle ITS Gateway – Standardization ITS Standards 1. ITS real-time Data Provider 2. ITS Data Configurations 3. tbd. TC 22 V-ITS-SG TC 204 ITS Use Cases & Requirements ISO TC 204 responsibility Joint Standardization Tbd. ISO TC 22 responsibility 1. Requirement to provide real-time IVN data 2. Requirements to provide standardized data formats 3. tbd. Road Vehicle Standards IVN real-time Data to satisfy ITS Use Cases & Requirements 5 March 24 -25, 2015 ISO TC 204 Intelligent Transport Systems

Potential Collaboration on ADAS Time Chart Normal Driving Risk Accident Support Safe Driving Post

Potential Collaboration on ADAS Time Chart Normal Driving Risk Accident Support Safe Driving Post Accident Using telematics (internet, cloud) Issue Warning Using real-time info. Intervene Prepare for crash TC 22 Lead TC 204 Lead Warning &Vehicle control for crash avoidance Risk not appeared March 24 -25, 2015 Risk has appeared mitigate crash injury Helps mitigate post-crash injury ( e-Call ) TC 204 Lead Pre-crash safety Impact Protection Liaison Crash may Crash is happen unavoidable Crash 6 ISO TC 204 Intelligent Transport Systems Post crash