RAS Processing Models Recycling Facility Roof • Removal • Pre-Sorting • • Collection Pre-sorting

RAS Processing Models Recycling Facility Roof • Removal • Pre-Sorting • • Collection Pre-sorting (mixed loads) Asbestos Testing Grinding & Sizing End User • HMA Contractor

RAS Processing Models Roof • Removal • Pre-Sorting Transfer Station • Collection • Pre-sorting

RAS Processing Models Roof • Removal • Pre-Sorting Transfer Station • Collection • Pre-sorting (mixed loads) • Asbestos Testing Recycling Facility • Grinding & Sizing End User • HMA Contractor

RAS Processing Models Roof • Removal • Pre-Sorting Transfer Station • Collection • Pre-sorting

RAS Processing Models Roof • Removal • Pre-Sorting Transfer Station • Collection • Pre-sorting (mixed loads) • Asbestos Testing End User • Grinding & Sizing

RAS Processing Models Roof • Removal • Pre-Sorting • • End User Collection Pre-sorting

RAS Processing Models Roof • Removal • Pre-Sorting • • End User Collection Pre-sorting (mixed loads) Asbestos Testing Grinding & Sizing

Jurisdiction Roof • Pre-Sorting Transfer Station • Collection • Pre-sorting (mixed loads) • Asbestos

Jurisdiction Roof • Pre-Sorting Transfer Station • Collection • Pre-sorting (mixed loads) • Asbestos Testing Recycling Facility • Grinding & Sizing • QC Testing • Deleterious % • Moisture % • Gradation End User • HMA Contractor • Material Properties • HMA Requirements DOT DNR IDED OSHA

DOT Specification Development 1. Source requirements 2. Material requirements 3. End User requirements

DOT Specification Development 1. Source requirements 2. Material requirements 3. End User requirements

Source Requirements: RAS Suppliers �Treated like aggregate producers �RAS comes as a CERTIFIED product

Source Requirements: RAS Suppliers �Treated like aggregate producers �RAS comes as a CERTIFIED product to End User �Approved List for RAS Suppliers (each site) �Obtained necessary permits �Submit Quality Control Plan �Documentation and record keeping

Material Requirements �Raw Shingle Material �Pre-processing = sorting, removal of waste �Asbestos remediation (testing,

Material Requirements �Raw Shingle Material �Pre-processing = sorting, removal of waste �Asbestos remediation (testing, rejection of loads) �Processed RAS �Gradation �Deleterious Content (<1. 5%) �Moisture (for information only)

Quality Control of RAS �Code of Federal Regulations 637. 201 -637. 209 �RAS cannot

Quality Control of RAS �Code of Federal Regulations 637. 201 -637. 209 �RAS cannot be self-certified �QC Program Required �Minimum 3 samples or 1/1000 tons �Gradation, deleterious, moisture �DOT may verify results

End User Requirements � 2 -5% of RAS must be used when the DS

End User Requirements � 2 -5% of RAS must be used when the DS is on the contract �Future……. Permissive specification allowing 5% max �We pay for 2/3 of the extracted binder content in the RAS �End Users may not collect or process shingles at portable facilities.

Other issues �Sampling and testing logistics �Timing �Mix Design volumetrics

Other issues �Sampling and testing logistics �Timing �Mix Design volumetrics

2010 Projects �HWY 63 �HMA: 4% + RAP = 25% binder replacement (PG 58

2010 Projects �HWY 63 �HMA: 4% + RAP = 25% binder replacement (PG 58 -28) �HMA: 5% + RAP = 30% binder replacement (PG 58 -28) �HMA: Control with RAP �HWY 10 �HMA: 4%, 5%, 6% with NO RAP (PG 58 -28) �HMA: control with NO RAP (PG 64 -22) �HWY 61 �WMA: 5% + RAP = 30% binder replacement (PG 58 -28) �WMA: 7% + RAP = 30% binder replacement (PG 58 -28) �WMA: control with RAP only (PG 58 -28)