Introduction to the Linac 4 hall visitation J-Cl. Guillaume (EN-EL)

Introduction to the Linac 4 hall visitation J-Cl. Guillaume (EN-EL)

Content: Linac 4 - General presentation General view General layout Cabling activity: some figures

Content: Linac 4 - General presentation General view General layout Cabling activity: some figures Cabling sequence Some pictures of the cabling campaigns 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 2

Linac 4: General presentation The goal of the Linac 4 project is to build

Linac 4: General presentation The goal of the Linac 4 project is to build a 160 Me. V H− linear accelerator replacing Linac 2 as injector to the PS Booster (PSB) The new linac is expected to increase the beam brightness out of the PSB by a factor of 2, making possible an upgrade of the LHC injectors for higher intensity and eventually an increase of the LHC luminosity. 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 3

Linac 4: General presentation RFQ: Radio Frequency Quadrupole and a chopper line DTL: Drift

Linac 4: General presentation RFQ: Radio Frequency Quadrupole and a chopper line DTL: Drift Tube Linac CCDTL: Cell-Coupled Drift Tube Linac PIMS: Pi-mode structure Transfer line to PSB 160 Me. V 100 Me. V Dump 50 Me. V Pims Source CCDTL 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 4

Linac 4: General view Possible access for today: Klystrons building and control room. 10/6/2020

Linac 4: General view Possible access for today: Klystrons building and control room. 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 5

Linac 4: General view Hall section Passages for waveguides and RF cables Machine section

Linac 4: General view Hall section Passages for waveguides and RF cables Machine section 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 6

Linac 4: General layout Zone 3 MEV nel Tun sfert Tran Faraday cage BI

Linac 4: General layout Zone 3 MEV nel Tun sfert Tran Faraday cage BI & Vac Ctrl room Tunnel Machine (Level S 2) 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 7

Cabling activity: Some figures 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 8

Cabling activity: Some figures 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 8

Zone 3 MEV Cabling sequences (1) Cabling campaign 1: Between 3 MEV area, BI

Zone 3 MEV Cabling sequences (1) Cabling campaign 1: Between 3 MEV area, BI and Vac control room and the Linac 4 tunnel Tun sfert Tran BI & Vac Ctrl room Tunnel Machine (Level S 2) 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 9

Cabling sequences (2) nel Tun sfert Tran Faraday cage Tunnel Machine (Level S 2)

Cabling sequences (2) nel Tun sfert Tran Faraday cage Tunnel Machine (Level S 2) Cabling campaign 2: Between hall and the tunnels (Machine and Transfert) 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 10

Cabling sequences (3) nel Tun sfert Tran Faraday cage 529 RF cables passing through

Cabling sequences (3) nel Tun sfert Tran Faraday cage 529 RF cables passing through 60 passages diam. 80 mm Tunnel Machine (Level S 2) Cabling campaign 3: RF cabling between hall and machine 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 11

Some pictures of the cabling campaign Shaft for Transfert tunnel Hall Linac 4 Transfert

Some pictures of the cabling campaign Shaft for Transfert tunnel Hall Linac 4 Transfert tunnel 10/6/2020 Machine tunnel CERN-ITER Workshop, 16 -17 January 2017 / JCG 12

Some pictures of the RF cabling campaign Test before pulling Pulling of the RF

Some pictures of the RF cabling campaign Test before pulling Pulling of the RF cables 10/6/2020 Passages for RF cables Machine tunnel CERN-ITER Workshop, 16 -17 January 2017 / JCG 13

Thank you for your attention 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG

Thank you for your attention 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 14