Introduction to the Linac 4 hall visitation J-Cl. Guillaume (EN-EL)
Content: Linac 4 - General presentation General view General layout Cabling activity: some figures Cabling sequence Some pictures of the cabling campaigns 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 2
Linac 4: General presentation The goal of the Linac 4 project is to build a 160 Me. V H− linear accelerator replacing Linac 2 as injector to the PS Booster (PSB) The new linac is expected to increase the beam brightness out of the PSB by a factor of 2, making possible an upgrade of the LHC injectors for higher intensity and eventually an increase of the LHC luminosity. 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 3
Linac 4: General presentation RFQ: Radio Frequency Quadrupole and a chopper line DTL: Drift Tube Linac CCDTL: Cell-Coupled Drift Tube Linac PIMS: Pi-mode structure Transfer line to PSB 160 Me. V 100 Me. V Dump 50 Me. V Pims Source CCDTL 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 4
Linac 4: General view Possible access for today: Klystrons building and control room. 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 5
Linac 4: General view Hall section Passages for waveguides and RF cables Machine section 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 6
Linac 4: General layout Zone 3 MEV nel Tun sfert Tran Faraday cage BI & Vac Ctrl room Tunnel Machine (Level S 2) 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 7
Cabling activity: Some figures 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 8
Zone 3 MEV Cabling sequences (1) Cabling campaign 1: Between 3 MEV area, BI and Vac control room and the Linac 4 tunnel Tun sfert Tran BI & Vac Ctrl room Tunnel Machine (Level S 2) 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 9
Cabling sequences (2) nel Tun sfert Tran Faraday cage Tunnel Machine (Level S 2) Cabling campaign 2: Between hall and the tunnels (Machine and Transfert) 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 10
Cabling sequences (3) nel Tun sfert Tran Faraday cage 529 RF cables passing through 60 passages diam. 80 mm Tunnel Machine (Level S 2) Cabling campaign 3: RF cabling between hall and machine 10/6/2020 CERN-ITER Workshop, 16 -17 January 2017 / JCG 11
Some pictures of the cabling campaign Shaft for Transfert tunnel Hall Linac 4 Transfert tunnel 10/6/2020 Machine tunnel CERN-ITER Workshop, 16 -17 January 2017 / JCG 12
Some pictures of the RF cabling campaign Test before pulling Pulling of the RF cables 10/6/2020 Passages for RF cables Machine tunnel CERN-ITER Workshop, 16 -17 January 2017 / JCG 13