Introduction • Oil & Gas engineering services company • Full suite of engineering, procurement

Introduction • Oil & Gas engineering services company • Full suite of engineering, procurement and construction management services

Why Swift? • Commitment to: ü Quality Service ü Competitive Rates ü Long-Term Relationships

Why Swift? • Commitment to: ü Quality Service ü Competitive Rates ü Long-Term Relationships • Unparalleled experience in large-scale gas projects • Collaborative and Custom-Fit Solutions

Licensed to Operate in Alberta British Columbia Saskatchewan Manitoba United States

Licensed to Operate in Alberta British Columbia Saskatchewan Manitoba United States

Executive Management • Founded in 2003 by two engineers, John Shelford and Peter Poon.

Executive Management • Founded in 2003 by two engineers, John Shelford and Peter Poon. • John and Peter still lead the company and are both active in Project Execution and Management. John Shelford (President) Peter Poon (CEO) ü Over 35 Years of industry ü Over 15 Years of industry experience ü Construction Management ü Gas Conditioning ü Compression Specialist ü Oil Processing ü Project Management ü Gas Compression ü Gas Transportation

Our Strengths Flexible Adaptable Responsive Collaborative Fair

Our Strengths Flexible Adaptable Responsive Collaborative Fair

Our People üMulti-disciplined team of Engineers, Including Mechanical, Process, Electrical, Civil, Structural and Drafting

Our People üMulti-disciplined team of Engineers, Including Mechanical, Process, Electrical, Civil, Structural and Drafting & Design üInnovative thinkers üSolutions focused üExperienced in compression, Gas storage, Gas separation, Tie-ins, Asset integrity management, Process optimization and much more. 30+ staff and growing Network of 300+ engineers worldwide

Engineering Services Environmental and Regulatory Services Complete Suite of Fit-for. Purpose Services Project Management

Engineering Services Environmental and Regulatory Services Complete Suite of Fit-for. Purpose Services Project Management Procurement

Services Front End Engineering & Design Project Management Mechanical Engineering Process Engineering Electrical Engineering

Services Front End Engineering & Design Project Management Mechanical Engineering Process Engineering Electrical Engineering Instrumentation & Control Systems Design & Drafting Procurement Construction Management Regulatory & Environmental Services Quality Management

Clients

Clients

Selected Projects En. Cana Gas Storage - Countess Gas Storage Facility - $150 MM

Selected Projects En. Cana Gas Storage - Countess Gas Storage Facility - $150 MM Complete design and construction of a 40 bcf facility, 16 well sites and a pipeline Perpetual Energy - Warwick Gas Storage Facility - $45 MM A 10 bcf storage and withdrawal facility, including the installation of two (2) 8, 000 HP Ariel JGZ reciprocating compressors Niska Gas Storgae - Wild Goose Gas Storage Facility Expansion - $60 MM Installation of an additional process train, including the installation of additional 7, 000 HP of compression, increasing the facility to over 20, 000 HP as well as increasing free-flow by 300 MMscfd Penn West Exploration - Waskada Light Oil Field Production - $100 MM Installation of Waskada light oil field production

Selected Projects Niska Storage Gas - Delta Pressure - $50 MM Took a 100

Selected Projects Niska Storage Gas - Delta Pressure - $50 MM Took a 100 bcf reservoir from 1600 psig to 210 psig. Reconfigured compressors and upgraded all wellhead flow lines Cenovus Energy Inc. - Shaunavon Multiwell Oil Battery and Satellites (Sour) - $8 MM Installation of 2 multi-well oil batteries and 2 multiwall oil satellites. Included a test separator building (with Inlet Header systems), MCC building, emulsion storage tanks, Flare System (FKOD and Flare Stack) and propane fuel system Wild Rose Energy Ltd. - Wild Rose Gas Storage Facility - $40 MM Completed preliminary FEED study for a 2 cycle, 120 bcf gas storage facility with 2300 psig reservoir pressure using 25, 000 HP compression. Installation of a process train, well sites and compression for the injection phase of the project

Reach Us Corporate Head Office: Suite 910, 736 – 8 th Avenue SW P:

Reach Us Corporate Head Office: Suite 910, 736 – 8 th Avenue SW P: (403) 705 -4800 Calgary, Alberta F: (403) 705 -4805 Canada T 2 P 1 H 4 E: info@swift-eng. com W: www. swift-eng. com Sales Offices: Canada: Australia: US: Calgary Sydney Denver | Houston | Pittsburgh Engineering Centres Canada: India: Calgary Mumbai

Appendix Client Name: Perpetual Energy Project Name: Warwick Gas Storage Facility Capital Expenditure: $45

Appendix Client Name: Perpetual Energy Project Name: Warwick Gas Storage Facility Capital Expenditure: $45 MM Project Scope: • Provided detailed engineering design, procurement and construction management support for the construction of a 10 bcf storage and withdrawal facility, including the installation of two (2) 8, 000 HP Ariel JGZ reciprocating compressors. Project Details: • Perpetually stores natural gas in a depleted reservoir and withdraws the gas when market conditions are favorable. • The plant is capable of 200 MMscfd on injection and withdrawal. • A well-pad with a total of six wells are connected to the remaining eight wells that are at the plant-site.

Appendix Client Name: Niska Gas Storgae Project Name: Wild Goose Gas Storage Facility Expansion

Appendix Client Name: Niska Gas Storgae Project Name: Wild Goose Gas Storage Facility Expansion Capital Expenditure: $60 MM Project Scope: • Provided detailed engineering, project management, and engineering support for the installation of an additional process train, including the installation of additional 7, 000 HP of compression, increasing the facility to over 20, 000 HP as well as increasing free-flow by 300 MMscfd. Project Details: • Niska Gas Storage (NGS) is developing a multi-cycle gas storage reservoir located in the southwest corner of Butte County in Northern California at the site of the depleted Wild Goose natural gas field. The project is located over an existing gas reservoir near two (2) Trans. Canada transmissions pipelines. • In Phase 1 of the project, NGS intends to turn this single gas reservoir into a 10 bcf storage and withdrawal facility. A gas plant will be designed to produce a maximum of 200 MMscfd on the withdrawal cycle.

Appendix Client Name: Penn West Exploration Project Name: Waskada Light Oil Field Production Capital

Appendix Client Name: Penn West Exploration Project Name: Waskada Light Oil Field Production Capital Expenditure: $100 MM Project Scope: • Provided detailed engineering, project management and engineering support for the installation of Waskada light oil field production. Project Details: • Penn West has an ongoing development of the • We provided a plot plan indicating equipment Waskada light oil field that will produce light emulsion placement and pipeline alignment; P&ID’s; detailed via pump jacks consisting of approximately: riser fabrication and installation; IFC SLD and cable • 15 -25 m 3/d API 36. 8 oil, schedule; vendor drawing, if applicable; and other • 15 -0 m 3/d sour produced water production, and; construction drawings (isometrics, piping plan, riser • 0. 8 -2. 0 e 3 m 3/d sour gas production detail, pile layout), as required.

Appendix Client Name: Cenovus Energy Inc. Project Name: Shaunavon Multiwell Oil Battery and Satellites

Appendix Client Name: Cenovus Energy Inc. Project Name: Shaunavon Multiwell Oil Battery and Satellites (Sour) Capital Expenditure: $8 MM Project Scope: • Provided detailed design and engineering, project management and regulatory support for the installation of two (2) multi-well oil batteries and two (2) multiwall oil satellites. Facility installation included a test separator building (with Inlet Header systems), MCC building, emulsion storage tanks, Flare System (FKOD and Flare Stack) and propane fuel system. Project Detail: • Cenovus Energy’s Shaunavon area is located near Shaunavon, SK. The facility was designed to test and store production from the 2012 drills in this field.