INTERREG III B CADSES RAINDROP Project partner No
INTERREG III B CADSES RAINDROP Project partner No 4: Municipality of Acharnai Scientific support: YDRONOMI Consulting Engineers
YDRONOMI Consulting Engineers Municipaliy of Acharnai PP 4 - Acharnai: The Rain. Drop experience • Evolution of Acharnai and its drainage problems (sins of the past torturing the future generations) • Designing for Raindrop (which problem to do we solve first? ) • Administration for Raindrop (or democracy in modern Greece) • Works’ progress (in the land of our ancestors) • The future (Rain Drop: much more than just a drop!) • The Raindrop experience (lessons and the final outcome)
Municipaliy of Acharnai The hydrographic network – Before… YDRONOMI Consulting Engineers
Municipaliy of Acharnai The hydrographic network – Before … YDRONOMI Consulting Engineers and … nowdays: the “man-made hydrographic network X X X www. ydronomi. com
Municipaliy of Acharnai YDRONOMI Consulting Engineers To get an idea of the magnitude of the problem: The event of May 24 th 2007
Municipaliy of Acharnai YDRONOMI Consulting Engineers To get an idea of the magnitude of the problem: The event of May 24 th 2007
Municipaliy of Acharnai YDRONOMI Consulting Engineers To get an idea of the magnitude of the problem: The event of May 24 th 2007
Municipaliy of Acharnai YDRONOMI Consulting Engineers To get an idea of the magnitude of the problem: The event of May 24 th 2007 • Damage claimed after that flood : 6 million Euros! • If we could cut the runoff by 50% literally no damage at all
Municipaliy of Acharnai Designing for Raindrop (which problem to do we solve first? ) Goals: • local pilot intervention in one of the problematic areas • Visible result • Pilot application that will show the way for more similar projects YDRONOMI Consulting Engineers
YDRONOMI Consulting Engineers Municipaliy of Acharnai Designing for Raindrop (which problem to do we solve first? ) The design: Trough trench 300 m 3 Porous Pavment 250 m 3 Step 2 Retention Tank 1500 m 3 Step 1
Municipaliy of Acharnai Designing for Raindrop (which problem to do we solve first? ) YDRONOMI Consulting Engineers
Municipaliy of Acharnai YDRONOMI Consulting Engineers Designing for Raindrop (which problem to do we solve first? ) Technical data: Catchment area: Max runoff entering into the tank: Max discharge from the tank to the trough trench through pumps : 315. 000 m 2 1 m 3/sec 0. 25 or 0. 5 m 3/sec Ecomonic data: Tank: Trough trench: Porous pavement: Total: 380. 000€ 30. 000€ 450. 000€
Municipaliy of Acharnai YDRONOMI Consulting Engineers Administration for Raindrop (or democracy in modern Greece) Delays: A city in financial difficulties §Payment reimbursement delays from EU (still waiting) §The city is not very wealthy Elections on Oct 2006 - but new Mayor appointed in February §Very close result (0. 17%) with final decision in court… § 4 months of administrative halt Actions for solving the problem: Mobilization - The new Mayor took it personally §Meeting in Prague with project partners §Meeting in Rome with the Managing Authority Results: §No funds lost §Transfer of funds from 2006 to 2007 (exceptionally) §No total delay §No risk for the other project partners and their payments
Municipaliy of Acharnai Works’ progress (in the land of our ancestors) Works started on March 26 th and by now: Porous pavement: completed on May 20 th YDRONOMI Consulting Engineers
Municipaliy of Acharnai Works’ progress (in the land of our ancestors) Retention tank and trough trench: • Discovery of archaeological findings in <2 m of depth • Manual work…from the National Archaeological Service • Findings (pottery, skeletons, a well, food storage facilities) were only 2000 years old…and belonged to poor people (no gold!) ==> The site was released after 15 days YDRONOMI Consulting Engineers
Municipaliy of Acharnai Works’ progress (in the land of our ancestors) Retention tank: • Concreting completed. • Connection with the porous pavement completed • Connection of the flushing system to the sewer completed • Estimated completion: June 30 th YDRONOMI Consulting Engineers
YDRONOMI Consulting Engineers Municipaliy of Acharnai The future (Rain Drop: much more than just a drop!) Big retention schemes are designed in combination with stormwater network: • Reducing runoff discharge compared to “classic network only” from 24 -->6 m 3/s • Diversion of supercritical flow >14 m 3/s with lateral weir schemes • Tanks ~12 m deep with parking above them 2500 m 2 Σ 2: T=10 Vανάσχεσης=10. 000 m 3 Q=10. 00 m 3/s Q=3. 5 m 3/s tc=0. 27 h Σ 1: T=10 Vανάσχεσης=20. 000 m 3 Q=14. 0 m 3/s Q=2. 5 m 3/s tc=0. 34 h 5. 000 m 2
YDRONOMI Consulting Engineers Municipaliy of Acharnai The future (Rain Drop: much more than just a drop!) Authorities are embracing BMPs: Construction of networks will be approved on one condition: Retention to the existing runoff discharge to the rivers (assuming no network at all) BMPs are emerging: • Acharnai - Agia Anna district, 0. 7 km 2 • Municipality of Ano Liossia, 8 km 2 of urban space with 30, 000 inhabitants • Athens Military hospital extension, 0. 1 km 2 BMPs in the regulatory framework: The Ministry of Environment Planning and Public Works & National Technical University are working on the: • Overview of the legal framework in the developed countries • A Law Proposal/Draft to include BMPs in SW design and planning nationwide The future of Rain. Drop in the context of the new INTERREG: • Experienced, coherent, and successful team • BMPs with a more holistic approach - Include the upstream parts in the design • Climate change…
YDRONOMI Consulting Engineers Municipaliy of Acharnai The Raindrop experience (lessons and the final outcome) Experience (or lesson!) No 1: Driving in the bumpy road of project implementation… • Delays can happen (we are not UFOs, we are operating in the political and administrative reality) • Funding reimbursement delays • Delays in works’progress • Political fist fighting • Delays are not the end of the world (do not panic!) • No need to point fingers among partners • Opportunism (another bad –ism) is not the right way of thinking Experience (or lesson!) No 2: Dealing with the Bosses…Success (or failure) is for everybody … • EU Commission and MA and the JTS are not ruthless queens (on the contrary…) • We can always talk to them • They are there to listen • They want to help, not to punish! • Project Partners, Lead Partner, JTS, MA, and the EU Commission are all partners after all • Talking regularly has been a very good medicine to all problems • Communication and transversal information is always welcome MA<->LP <->PP Experience (or lesson!) No 3: EU projects are a great thing! • Multidisciplinary, multinational, multicultural endeavours (Its all about Europe after all) • They are projects providing impetus for change • Promotion of new ideas and technologies • Promotion of environmentally friendly and technically sound solutions • Shaping the future in our profession
Municipaliy of Acharnai YDRONOMI Consulting Engineers The Raindrop experience (lessons and the final outcome) The final outcomes from Raindrop project • Methodology for Storm Water Management Master Planning • Step by step approach • Based on the principles: • Maintain as undisturbed as possible the hydrological cycle after the urbanization. • Peak flows and flow volumes will not exceed those before urbanizatio • Fundamentally ecological approach of SWM. • Guidelines for the selection of BMPs • Advantages / Disadvantages • Relative costs • A straightforward tool without getting into complicated science
YDRONOMI Consulting Engineers Municipality of Acharnai It has been a wonderful experience To be continued! ΣΑΣ ΕΥΧΑΡΙΣΤΟΥΜΕ! Thank you!
- Slides: 21