International workshop on micropiles – Venice, 30 may – 2 June 2002 TWENTY YEARS

International workshop on micropiles – Venice, 30 may – 2 June 2002 TWENTY YEARS OF EXPERIENCE IN THE USE OF THE UMBRELLA-ARCH METHOD OF SUPPORT FOR TUNNELLING G. Carrieri, Geodata S. r. l. , Torino, Italy R. Fiorotto, Casagrande, Italy P. Grasso, Geodata S. r. l. , Torino, Italy S. Pelizza, Politecnico di Torino, Italy Presented by: G. Carrieri

Conventional tunnelling methods in soft ground When tunnelling through soft ground, external, additional support

Conventional tunnelling methods in soft ground When tunnelling through soft ground, external, additional support (ground reinforcement or ground improvement) at some stage of the excavation is always necessary The main problem with conventional methods when tunnelling through difficult geotechnical conditions is control of deformation: without support or treatment the ground weakens and tends to sink into the opening (fall of ground from the upper part of the tunnel face, tunnel face extrusion, tunnel face failure), a phenomenon called “decompression”. The elimination of this decompression may require a “cavity preconfinement action” (defined as any active action that favours the formation of an arch effect in the ground ahead the tunnel face) that can be achieved through reinforcement or/and protective intervention ahead the tunnel excavation.

Conventional tunnelling methods in soft ground Reinforcement (or ground improvement) acts directly on the

Conventional tunnelling methods in soft ground Reinforcement (or ground improvement) acts directly on the ground’s mechanical characteristics improving its natural strength and deformation properties by means of appropriate ground improvement techniques. Protective intervention channels’ stresses around the tunnel periphery thus performing a protective function ensuring that the natural strength and deformation properties of the core are maintained (the main effect is to contain the reduction of σ3 - minor principal stress). The umbrella-arch technique can be included in this definition.

Conventional tunnelling methods in soft ground TYPE OF INTERVENTION LOCATION Around the cavity Cavity

Conventional tunnelling methods in soft ground TYPE OF INTERVENTION LOCATION Around the cavity Cavity boundary ACTION Tunnel core Protective Reinforce ment GROUTING � � JET-GROUTING � � FREEZING � � � DEWATERING FIBREGLASS ELEMENTS PILOT TUNNEL � � � � � PRE-CUTTING � � PRE-TUNNEL � � UMBRELLA-ARCH

Conventional tunnelling methods in soft ground Mechanical pre-cutting

Conventional tunnelling methods in soft ground Mechanical pre-cutting

Conventional tunnelling methods in soft ground Pretunnel

Conventional tunnelling methods in soft ground Pretunnel

Conventional tunnelling methods in soft ground Fibreglass elements

Conventional tunnelling methods in soft ground Fibreglass elements

Conventional tunnelling methods in soft ground Umbrella arch

Conventional tunnelling methods in soft ground Umbrella arch

Conventional tunnelling methods in soft ground Umbrella arch Bolts Micropiles Temporary Invert Reinforcement of

Conventional tunnelling methods in soft ground Umbrella arch Bolts Micropiles Temporary Invert Reinforcement of face

Conventional tunnelling methods in soft ground Umbrella arch

Conventional tunnelling methods in soft ground Umbrella arch

Conventional tunnelling methods in soft ground Umbrella arch

Conventional tunnelling methods in soft ground Umbrella arch

Fields of application of the umbrella-arch – Tunnel portals The portal zone frequently represents

Fields of application of the umbrella-arch – Tunnel portals The portal zone frequently represents the most problematic area during excavation of a tunnel. Many problems are concentred in this area, especially those deriving from the geological nature of the ground, lack of confinement in the immediate overburden and rock mass discontinuities. In general, the following factors influence the portal problems: q morphology of the site; q geo-mechanical characteristics of the terrain; q stability conditions of the ground; q presence of water; q presence of external constraints (building, infrastructures, etc. )

Fields of application of the umbrella-arch – Tunnel portals

Fields of application of the umbrella-arch – Tunnel portals

Fields of application of the umbrella-arch – Tunnel portals

Fields of application of the umbrella-arch – Tunnel portals

Fields of application of the umbrella-arch – Shallow tunnels The construction of shallow tunnels

Fields of application of the umbrella-arch – Shallow tunnels The construction of shallow tunnels in soft ground requires complete control of ground deformations: § to avoid damage to infrastructures and buildings on the surface, § to ensure the safety of the workmen in various stages of the excavation, § to control the increase of bending moments in the temporary lining that may result from loosening of the ground, asymmetric loading (due to the geomorphology, proximity to another cavity, or surface loads), and heterogeneity of the ground, § to avoid the initiation or recurrence of the phenomenon of slope instability.

Fields of application of the umbrella-arch – Shallow tunnels: Egnatia Odos S 3 tunnel

Fields of application of the umbrella-arch – Shallow tunnels: Egnatia Odos S 3 tunnel (Greece)

Fields of application of the umbrella-arch – Shallow tunnels: Egnatia Odos S 3 tunnel

Fields of application of the umbrella-arch – Shallow tunnels: Egnatia Odos S 3 tunnel (Greece)

Fields of application of the umbrella-arch – Shallow tunnels: Maiko tunnel (Japan)

Fields of application of the umbrella-arch – Shallow tunnels: Maiko tunnel (Japan)

Fields of application of the umbrella-arch – Shallow tunnels: Maiko tunnel (Japan)

Fields of application of the umbrella-arch – Shallow tunnels: Maiko tunnel (Japan)

Fields of application of the umbrella-arch – Deep tunnels When tunnelling through soft ground

Fields of application of the umbrella-arch – Deep tunnels When tunnelling through soft ground in deep overburden the magnitude of stress concentrations at the tunnel face always exceeds the strength of the rock (soil) mass. Tunnelling through ground belonging to behaviour categories “e” and “f” requires pre -confinement actions. The selection between reinforcement or protective interventions depends on the stressstrain behaviour of the ground.

Fields of application of the umbrella-arch – Deep tunnels

Fields of application of the umbrella-arch – Deep tunnels

Fields of application of the umbrella-arch – Deep tunnels Ferrocarril Caracas – Tui medio

Fields of application of the umbrella-arch – Deep tunnels Ferrocarril Caracas – Tui medio (Venezuela) Tunnel Pitahaya

Fields of application of the umbrella-arch – Deep tunnels Fault crossing in deep tunnel

Fields of application of the umbrella-arch – Deep tunnels Fault crossing in deep tunnel conditions: Daj Khad shear zone - Headrace tunnel of Nathpa Jhakri Hydroelectric Project (India).

Fields of application of the umbrella-arch – Deep tunnels Fault crossing in deep tunnel

Fields of application of the umbrella-arch – Deep tunnels Fault crossing in deep tunnel conditions: Daj Khad shear zone - Headrace tunnel of Nathpa Jhakri Hydroelectric Project (India).

Fields of application of the umbrella-arch – Deep tunnels Fault crossing in deep tunnel

Fields of application of the umbrella-arch – Deep tunnels Fault crossing in deep tunnel conditions: Daj Khad shear zone - Headrace tunnel of Nathpa Jhakri Hydroelectric Project (India).

Fields of application of the intervention ahead the tunnel excavation TYPE OF INTERVENTION Cohesive

Fields of application of the intervention ahead the tunnel excavation TYPE OF INTERVENTION Cohesive terrain FIELD OF APPLICATION Terrain Sandy Fracture gravely with d rock terrain boulders � Complex Formations GROUTING � 1 JET-GROUTING � 2 � � 3 FREEZING � � DEWATERING � 4 � � � FIBREGLASS ELEMENTS � � 5 � 6 � PILOT TUNNEL � � � PRE-CUTTING � � PRE-TUNNEL � � � UMBRELLA-ARCH � � 7 � �

Fields of application of the umbrella-arch Terrain with boulders

Fields of application of the umbrella-arch Terrain with boulders

Fields of application of the umbrella-arch Terrain with boulders

Fields of application of the umbrella-arch Terrain with boulders

Fields of application of the umbrella-arch Sandy gravely terrain

Fields of application of the umbrella-arch Sandy gravely terrain

Fields of application of the umbrella-arch Terrain below water table

Fields of application of the umbrella-arch Terrain below water table

Fields of application of the umbrella-arch Terrain below water table

Fields of application of the umbrella-arch Terrain below water table

Umbrella arch design Conventional approach The steel pipe is considered to be a continuous

Umbrella arch design Conventional approach The steel pipe is considered to be a continuous beam on multiple supports Assuming that the value of "s" (in the case of a stable face) is equal to 1/2 d, the maximum bending moment, (Mmax) is: Mmax = (1/12)* qu* (3/2 a+0. 5)2 Considering that this design is for a very brief duration, the (allowable) working stress (Sadm) for the steel pipe can be close to its yield stress (1. 5>Fs>1. 1). The characteristic moment of resistance of the pipe is: Wmin = Mmax/Sadm.

Umbrella arch design Numerical modelling Usually the steel pipe is modelled by beam elements

Umbrella arch design Numerical modelling Usually the steel pipe is modelled by beam elements and the grouted area around the steel pipe is modelled by shell elements, the rigidity of the umbrella-arch in the longitudinal direction (tunnel axis direction) is completely different from its rigidity in the circumferential direction

Conclusion The umbrella- arch method has been used with demonstrated success in many types

Conclusion The umbrella- arch method has been used with demonstrated success in many types of difficult ground formations both in Italy and abroad q its flexibility and the fact that it can be used in different kinds of ground; q the treatment can be varied according to the ground formation, q it is safe because the steel pipes begin to work as a support immediately, even without grouting; q it is simple and quick and allows full face excavation to be carried out in soft soils; q it also has a structural function.