Interconnectivity projects between the EU and Ukraine 34
Interconnectivity projects between the EU and Ukraine
34. Belarus Russian Federation 9 b cm Natural gas import to Ukraine m bc 8 5. 24 Poland 2. 3 5. 0 Slovakia Storage: 31 bcm Injection: 252 mcm/d Withdrawal: 260 mcm/d 15. 5 92. 6 13. 2 Hungary 6. 2 35 576 km of pipelines + 2 450 km (ATO, Crimea) 4. 5 Romania Moldova Enter IP`s Exit IP`s 26. 8 70 Compressor Stations (+3 ATO) 670+35 Pumping Units 5 321 MW + 175 MW bcm
2. Unblocking IPs from Gazprom – getting ready to 2019 Russia Belarus Poland New IA for Single Grid Connection Point – consultations conducted, ready for signing Slovakia Budince – signed Velke Kapushany pending IPs blocked by GP IPs with TPA Hungary IA for both points signed Moldova Romania Isaccea 1 - signed; Tekovo - consultations conducted, TSO finalizing results; Isaccea 2 -3 – consultations to start on 16 Oct 2017; Isaccea (Romania) – under preparation. Consultations conducted, Moldavian TSO not ready to implement new rules
3. Interconnectivity projects between the EU and Ukraine Poland-Ukraine interconnector Firm capacity HU-UA bi-directional Trans-Balkan pipeline Project promoters: PJSC «UKRTRANSGAZ» FGSZ Ltd. HU-UA 6. 2 bcm Commissioning: Completed in 2016 (Ukrainian part) Poland-Ukraine interconnector Project promoters: PJSC «UKRTRANSGAZ» GAZ-SYSTEM S. A. PL-UA: UA-PL: 5 -8 bcm 5 -7 bcm Commissioning: IV 2020 Bi-directional Trans-Balkan pipeline Project promoters: PJSC «UKRTRANSGAZ» «TRANSGAZ» S. A. «Bulgartransgaz» EAD «DESFA» S. A. RO-UA: UA-RO: 8 bcm 26. 8 bcm Commissioning: 2019
4. Firm capacity HU-UA Project status Ukrainian side 1. Works completed in 2016 2. Costs covered by PJSC «UKRTRANSGAZ» Hungarian side i ne a kr U g n u H ary 1. Works not started - lack of investments. 2. No FID 3. To be finished within 2 -2. 5 years after FID. Project goals 1. New gas routes from Hungary to Poland or Balkan countries. 2. Bi-directional physical IP 3. Less dependence from Russian supplies 4. Security of supply in Ukraine
5. Poland-Ukraine interconnector Characteristic of the project Poland Ukraine GMS Hermanowice GMS Drozdovichi UGSF Oparske kia va 99, 3 km Pipe diameter: DN 1000 Working pressure: 75 bar Cost of project: 110 ml EUR Implemented steps UGSF Uherske UGSF Bilche - Volytsko UGSF Dashavske Slo Length of pipeline: Western Ukraine Underground Gas Storage Capacity- 25 bcm, Free Capacity- 15 bcm UGSF Bohorodchanske 1. Completion of feasibility study 2. 14 Oct 2016 – PMI status 3. 6 Dec 2016 – Agreement on Rules of Cooperation Following steps 1. Open Season procedure 2. Designing and engineering phase 3. Project implementation Project goals Hu ng ar y 1. 2. 3. 4. Less dependence from Russian supplies Integration to European gas market Access to Ukrainian UGSF New gas routes from Poland to Hungary or Balkan countries
6. Bi-directional Trans-Balkan pipeline Reconstruction from Ukrainian side 1. CS/GMS Orlovka 2. CS Berezivka CS Tiraspol CS Vulkaneshty GMS Grebenyky GMS Kaushany Reconstruction from Moldavian side (from our best knowledge) 1. GMS Kaushany 2. CS Vulkaneshty 3. CS Tiraspol CS/GMS Orlovka Reconstruction from Romanian side ? Reconstruction from Bulgarian side ? Reconstruction from Greek side ? Ukrainian CS Moldavian GMS Ukrainian GMS Project goals 1. Bi-directional route from Greek LNG and Turkey to Ukraine via Bulgaria and Romania 2. Additional security of supply for CESEC region 3. New rout for export of Romanian production
Thank you for your attention!
- Slides: 8