Project Overview Series interconnection of wind turbine using DC grid Interconnection Wind Turbine Using DC Link ECE Connections 2009 Symposium University of Toronto -4 - Etienne Veilleux
Benefits and Requirements Benefits: ¨ No offshore platform ¨ Eliminate all transformers at sending end ¨ ↓ intermediate converters ¨ ↓ overall cost General Requirements: ¨ Maximum power point tracking ¨ Continuous path for current ¨ Current regulated by the receiving end ¨ Feasible and cost effective solution Interconnection Wind Turbine Using DC Link ECE Connections 2009 Symposium University of Toronto -5 - Etienne Veilleux
Key Block: DC-DC Converter ¨ Continuous path for current on state off state Selected topology: buck converter Interconnection Wind Turbine Using DC Link ECE Connections 2009 Symposium University of Toronto -6 - Etienne Veilleux
Converter Topology Generator AC/DC DC/DC Interconnection Wind Turbine Using DC Link ECE Connections 2009 Symposium University of Toronto -7 - Etienne Veilleux
Simulation Interconnection Wind Turbine Using DC Link ECE Connections 2009 Symposium University of Toronto -8 - Etienne Veilleux