Interchange Distribution Calculator Working Group IDCWG Update Yasser
Interchange Distribution Calculator Working Group (IDCWG) Update Yasser Bahbaz IDCWG Chair BPS Update September 13 th, 2011
IDCWG Update • IDC Change Order Updates • GTL Update
Implemented ● CO 313: Use of SDX Common Names in IDC ● CO-321: Data Interface for TLR CMR Report Data for SPP ● CO 324: Change in Default TLR Start Time for TLR 3 B and 5 B in IDC TLR Issuance Window ● CO-325: Changes to TLR Event History Display ● CO 327: Creation of TAP Pseudo BA in TVA. ● SDX CO 07: SDX File Daily Load Time Conversion ● BOF CO 10: Temp Flowgate Validation
Development/Testing ● CO 320: Set PGEN for Base Loaded Units to Effective Pmax for NNL *** Will be implemented on October 4 th *** ● CO 322: PFV Generation Priority Submissions ● CO 328: Intra Hour Tag Curtailment ● CO 329: Load Adjustments at the time of TLR 5 Issuance.
DRAFT/Evaluation ● CO 326: PFV Metrics ● CO 330: Authorization of OATI Use of IDC Data for DOE Studies ● CO 331: IDC Interface to NAESB Web. Registry
Other Items ● IDCWG and OATI will be drafting a CO 283 summary write Up. ● A Request for Initiation of a NAESB BP Standard regarding TLR 5 B re-allocation logic is drafted.
IDCWG Update GTL Update
IDCWG Update GTL Calculation Testing – • Calculation Testing Sessions: Test Plans Developed For GTL Calcs Prior To Test Sessions Ø Test sessions at OATI Offices on May 12 th. Ø Group Is Expected To Have Finished most of the Calculation Testing during the October Meeting. Ø • Results: No Outstanding Variances Ø Functional Testing Completed Ø CO-283 Developed As Specified Pending Required Changes For The Recently Reached BPS PFV Permanent Solution. Ø
IDCWG Update GTL Data Submission
IDCWG Update GTL Data Submission – • Full Data Load Submission: Data Is Submitted but NOT at full Rate yet. Ø Issues With Data Mapping and Data Validity Remain But Enhanced. Ø OATI Will Address Implementation Issues As They Arise Ø
IDCWG Update Change Order 283 Status
IDCWG Update Change Order 283 Status – • IDCWG Approved CO-283 As Implemented On November 1 2010 • GTL Logic Has Been Implemented onto Production IDC. • Most Entities Are Submitting Data to Development Site ONLY Due To System Limitations. • IDCWG discussed the coordination of submitting data to both Testing and Production environments.
IDCWG Update ● IDCWG § Resolved Data Confidentiality Issues Related To GTL Data During Last IDCWG Meeting In January. § Resolved The Generation Priority Submission Issue. § Calculation Testing Is In Progress By Entities. § PFV Metrics Change Order Has Been Revised Several Times By The Group. The draft will be presented to the ORS.
IDCWG Update
- Slides: 14