Integrated Watershed Management Programme [IWMP] State Level Nodal Agency [S L N A]Meeting 13.

Integrated Watershed Management Programme [IWMP] State Level Nodal Agency [S L N A]Meeting 13. 02. 2013 South Conference Hall, Secretariat Thiruvananthapuram at 11 am. M. Nandakumar, IAS CRD & CEO, SLNA Kerala

Agenda Item No. 1: Approval of the minutes of SLNA meeting held on 16/06/2012

Agenda Item No. 1: Approval of the minutes of SLNA meeting held on 16/06/2012 Copies of the minutes of the SLNA meeting held on 16/06/2012 have been forwarded to all members. No comments received. The minutes may be approved.

Agenda Item No. 2 ACTION TAKEN REPORT OF THE SLNA MEETIMG HELD ON 16/6/2012

Agenda Item No. 2 ACTION TAKEN REPORT OF THE SLNA MEETIMG HELD ON 16/6/2012 Res. No. 1: WDT should be constituted Action taken: WDTs are in position • The State govt issued orders to appoint WDT members in an interview to be chaired by the District collectors. • 40 WDTs are in position in PIAs

Res. No. 2: The committee decided to entrust the responsibility of PPR preparation for

Res. No. 2: The committee decided to entrust the responsibility of PPR preparation for the IV batch projects (2012 -13) to Soil Survey and Soil Conservation Department and Land Use Board Action taken: Now the whole PPRs are ready to present before the SLNA for approval.

Res. No. 3: Implementation of Batch III Projects in Idukki Districts Action taken: •

Res. No. 3: Implementation of Batch III Projects in Idukki Districts Action taken: • The PIA of the batch-3 projects in Idukki district (5 projects) is entrusted with the SS&SC department. • The department has not entered a Mo. U with the WCDC but SLNA has transferred funds to the WCDC. • There is a special agenda is included in this meeting as agenda number six regarding the implementation strategy to the Idukki district projects.

Res. No. 4: Setting up of a GIS Lab Action taken: SLNA in the

Res. No. 4: Setting up of a GIS Lab Action taken: SLNA in the last meeting has decided to explore the possibilities of sharing the facilities of existing GIS lab for the works of GIS for IWMP projects. Accordingly KSLUB agreed to share the lab facilities to SLNA also. KSLUB commissioner and CEO SLNA have entered to a Mo. U in this subject for one year.

Res. No. 5: Posting of Experts in SLNA & WCDCs Action taken Government has

Res. No. 5: Posting of Experts in SLNA & WCDCs Action taken Government has constituted new interview board with LSGD secretary as chairman and CRD&CEO as convener for selection of experts in SLNA and WCDC. The notification for filling the posts in SLNA and WCDC were issued and the sufficient applications received. The interview is fixed on 15 -02 -2013 for the selection of experts.

Res. No. 6: Posting of Data Entry Operator for IWMP Ther are 14 WCDCs

Res. No. 6: Posting of Data Entry Operator for IWMP Ther are 14 WCDCs and 28 PIAs Data Entry Operators are being appointed in WCDCs & PIAs 32 DEOs are already posted

Res. No. 7: Constitution of Watershed Committees Action taken: Watershed committees have been constituted

Res. No. 7: Constitution of Watershed Committees Action taken: Watershed committees have been constituted in all the PIAs of batch-1 and batch-2 projects except Idukki district and the constitution of WC in batch-3 projects is progressing. Batch WCs required WCs SHGs constituted Constituted I II 94 152 78 113 1127 5520 Total 246 191 6647

Res. No. 8: Capacity Building Plan Action taken SLNA has developed a training plan

Res. No. 8: Capacity Building Plan Action taken SLNA has developed a training plan with the help of SIRD and prepared modules, reading materials in Malayalam language and arranged To. T. Agency Number of persons trained SIRD at state level WCDCs at District level PIA at Community level TOTAL 1641 4785 2817 9243

Res. No. 9: Posting of Mid-term evaluators Action taken • The last SLNA meeting

Res. No. 9: Posting of Mid-term evaluators Action taken • The last SLNA meeting decided to seek panels from government owned organizations to consider as Mid term evaluators • SLNA received willingness from 7 organizations only

Res. No. 10: Hill area status of 10 Districts Action taken • All the

Res. No. 10: Hill area status of 10 Districts Action taken • All the districts of Kerala except Idukki and Wayanad are considered as plain area with per ha unit cost of Rs. 12, 000. • Actually all the districts except Alappuzha are hilly. This matter has been taken up with Do. LR with substantial documents and reply is awaited.

Res. No. 11: Establishing an exclusive website for SLNA Action taken: We have obtained

Res. No. 11: Establishing an exclusive website for SLNA Action taken: We have obtained proposal from C-Di. T Kerala for setting up web site exclusively for SLNA. NIC and IKM are also asked to submit their proposals. On getting all proposals, examining the lowest, the SLNA will launch the web immediately.

Res. No. 12: Technical Scrutiny of DPRs Action taken • Based on the decision

Res. No. 12: Technical Scrutiny of DPRs Action taken • Based on the decision a technical committee was constituted with subject experts from SS&SC department, KSLUB and SLNA. • A total of 21 DPRs (10 DPRs from batch-1 project & 11 DPRs from batch-2 projects) were received. • 14 DPRs are scrutinized by the committee and is placed to this forum for approval as agenda item number-5.

Activities from last SLNA meeting to this meeting- A brief report • Issued detailed

Activities from last SLNA meeting to this meeting- A brief report • Issued detailed working instructions on the implementation of IWMP for the State. • Issued orders and circulars for program implementation tools such as issuing AS, TS, Measurement, Mobilization of Watershed Development Funds (WDF), Constitution of Watershed committees, Formation and federation of SHGs in the Watershed area, Identification of User Groups, Development of Use-Resource agreement.

 • Directions given to PIAs and WCDCs for the procurement or sharing of

• Directions given to PIAs and WCDCs for the procurement or sharing of dedicated system for MIS entry. • Deployment of Human Resources- Directions given to appoint WDT members through the District Collectors and redeployment ordered for other administrative, professional expertize from the Rural Development Department functionaries

 • Funds flow ensured through e- transferring of funds from SLNA to WCDC

• Funds flow ensured through e- transferring of funds from SLNA to WCDC to PIA to Watershed Committees using RTGS facilities. • A number of sittings conducted with Technical Support Organizations to bring out quality DPRs and many meetings convened for review of the program with Project Managers, PIA level officials and WDT members. • Developed a strategy for intensive IEC activities at WCDC and PIA level for imparting awareness to the common people.

 • Entry Point Activities (EPA) started with people’s participation and inaugurations conducted at

• Entry Point Activities (EPA) started with people’s participation and inaugurations conducted at PIA level with Ministers and Other People Representatives. • State specific guidelines are under preparation for Livelihood Activities and Production System enhancement under IWMP. • A comprehensive convergence plan evolved and shared by PRIs and officials and started initiatives with the schemes MGNREGS, BRGF and other developmental schemes with that of the IWMP. • The IWMP implementation is all set out for rolling out in the State. Expected outcome is that the physical and financial progress will go up within three months.

Agenda Item No. 03: Review of Progress Report

Agenda Item No. 03: Review of Progress Report

Progress - Batch 1 Sl. No Name of the Project 1 2 3 4

Progress - Batch 1 Sl. No Name of the Project 1 2 3 4 5 6 7 8 9 10 Kasargod-IWMP-1 Kasargod-IWMP-III Palakkad-IWMP-III Wayanad-IWMP-II Wayanad-IWMP-IV Wayanad-IWMP-III EPA WCs EPA Com Block forme Bank SHGs Star Status of DPR Name of TSO plet d A/c ted ed Parappa 11 1 57 0 0 CRD, Parappa 13 1 45 0 0 Submitted Neeleswaram Parappa 11 0 79 0 0 Thrithala 6 6 165 4 2 Submitted Susthira Alathur 6 6 45 1 0 Submitted Deena Dayal Thrithala 7 7 245 2 0 Submitted Susthira Kalpeta 9 9 64 2 0 Kalpeta 6 5 28 2 0 Submitted Arshabharath Kalpeta 7 7 54 1 0 S Bathery 4 4 296 1 0 Submitted Arshabharath

Progress- Batch 2 Sl. no Name of the Project 1 Champakkulam 2 Vyppin A

Progress- Batch 2 Sl. no Name of the Project 1 Champakkulam 2 Vyppin A 1 3 Elamdesam A 6 4 Payyannur C 1 5 6 Neeleswar A 10 ithikkara A 4 7 Erattupetta 1 WCs EPA opene SHGs EPA NWCs Com Status of Block d Forme Start Name of TSO Formed plete DPR Bank d ed d A/c Under Champakkulam 3 0 312 0 0 CSES, Cochin Preperation DPC Vypin 10 0 1066 1 0 CSES, Cochin Approved Elamdesam 0 0 0 Not Started SIED, Wayanad Submitted Payyannur 15 1 71 1 0 Susthira to SLNA Parappa Ithikkara 7 7 409 0 0 Final Draft GPK Submitted Erattupetta 7 7 195 1 0 CSRD to PAU Continued………

progress batch-2 continued Sl. no Name of the Project Block WCs EPA NWCs SHGs

progress batch-2 continued Sl. no Name of the Project Block WCs EPA NWCs SHGs EPA opene Com Status of Forme Form Start Name of TSO d Bank plet DPR d ed ed A/c ed 8 Thuneri A 28 Thuneri 5 0 240 0 9 Wandoor B 1 Areekode 8 1 53 1 10 Areekode A 1 Areekode 9 4 303 0 6 6 403 11 3 0 745 0 10 1 249 1 11 12 13 Pattambi e 1 Pattambi E 2 Pattambi Ranni B Ranni Vamanapuram 14 Vamanapuram A 15 Kodakkara A 1 Kadakkara Wadakkanchery 16 Wadakkanchery B 5 Under IRCTC, Palakkad 0 Preperatio u n Rajive Youth 0 Submitted Foundation DPC 0 Land Use Board Approved 0 Completed Land Use Board Draft 1 Land Use Board submitted

Financial Position – Batch I Sl. N o 1 2 3 4 5 6

Financial Position – Batch I Sl. N o 1 2 3 4 5 6 Name of the Project Kasargode. IWMP-1 Kasargode. IWMP-III Palakkadu. IWMP-III Block Rs Lakhs I 1 st Correspond 2 nd installm install ing State instalme share State ent ment Total nt share central State Received Amount central for 14% of received (10%) share received receive Central (14%) (6%) d share Exp Parappa 81. 165 43. 8291 4. 8699 102. 2 11. 3 162. 33 5. 76 Parappa 74. 565 40. 2651 4. 4739 93. 9 10. 4 149. 13 6. 14 Parappa 95. 34 51. 4836 5. 7204 120. 1 13. 3 190. 68 6. 30 Thrithala 88. 665 47. 8791 5. 3199 111. 7 12. 4 177. 33 27. 25 Alathur 96. 42 52. 0668 5. 7852 121. 4 13. 4 192. 84 12. 22 10. 9 156. 63 19. 50 Thrithala 78. 315 42. 2901 4. 6989 98. 6 Continued…. .

Financial Position – Batch I continued Rs Lakhs Sl. N o Name of the

Financial Position – Batch I continued Rs Lakhs Sl. N o Name of the Project Wayanad-IWMP -I Wayanad-IWMP 8 -II Wayanad-IWMP 9 -IV Wayanad-IWMP 10 -III Total 7 I 1 st Correspond 2 nd installm install ing State instalme share State ent ment Total nt Received Amount Block share central State central for 14% of received (10%) share received receive Central (14%) (6%) d share Exp Kalpeta 66. 045 35. 6643 3. 9627 83. 2 9. 2 132. 09 5. 47 Kalpeta 54. 945 29. 6703 3. 2967 69. 2 7. 6 109. 89 5. 00 Kalpeta 77. 625 41. 9175 4. 6575 97. 8 10. 8 155. 25 8. 59 9. 6 137. 94 5. 97 109. 48 1564. 11 102. 23 Sulthan 68. 97 37. 2438 4. 1382 86. 9 Bathery 782. 0 422. 3 46. 9 985. 3

Rs Lakhs Financial Progress- Batch 1 Sl. N Name of the o Project 1

Rs Lakhs Financial Progress- Batch 1 Sl. N Name of the o Project 1 2 3 4 5 6 7 8 9 10 Block I State Central State installm share Total Cost share ent receive (90%) (10%) received d (6%) Champakkula Champakkul 706. 7 m C am Vyppin A 1 Vypin 884. 6 Elamdesam 1006. 2 A 6 Payyannur C 1 Payyannur 805. 4 Neeleswara 770. 0 A 10 m ithikkara A 4 Ithikkara 737. 6 Erattupetta 1 Erattupetta 643. 8 Thuneri A 28 Thuneri 856. 8 Wandoor B 1 Areekode 630. 5 Areekode A 1 Areekode 789. 5 Total Fund Expendit recei ure ved 636. 0 70. 7 38. 2 42. 4 3. 9 796. 1 88. 5 47. 8 5. 3 53. 1 5. 5 905. 6 100. 6 54. 3 6. 0 60. 4 0. 0 724. 8 80. 5 43. 5 4. 8 48. 3 7. 0 693. 0 77. 0 41. 6 46. 2 0. 0 663. 8 579. 4 771. 1 567. 4 710. 5 73. 8 64. 4 85. 7 63. 0 78. 9 39. 8 34. 8 46. 3 34. 0 42. 6 4. 4 3. 9 5. 1 3. 8 4. 7 44. 3 38. 6 51. 4 37. 8 47. 4 3. 9 5. 2 3. 0 7. 9 10. 7

Financial Progress- Batch 1 continued Rs Lakhs 11 12 13 Pattambi e 1 Pattambi

Financial Progress- Batch 1 continued Rs Lakhs 11 12 13 Pattambi e 1 Pattambi E 2 Ranni B Pattambi 786. 8 708. 1 78. 7 42. 5 Pattambi 657. 8 592. 0 65. 8 35. 5 Ranni 814. 1 732. 7 81. 4 44. 0 Vamanapura 14 Vamanapuram 1123. 8 1011. 4 112. 4 60. 7 m 15 Kodakkara A 1 Kadakkara 652. 1 586. 9 65. 2 35. 2 Wadakkanchery Wadakkanch 16 711. 2 640. 1 71. 1 38. 4 B 5 ery Grand Total 12576. 5 11318. 8 1257. 6 679. 1 4. 7 3. 9 47. 2 39. 5 48. 8 10. 3 5. 0 6. 7 67. 4 13. 1 3. 9 39. 1 18. 7 4. 3 42. 7 29. 5 754. 6 130. 4

Agenda Item No. 4 : Preliminary Project Reports (PPR): Sanction for Watershed Development Projects

Agenda Item No. 4 : Preliminary Project Reports (PPR): Sanction for Watershed Development Projects of batch IV for the year 2012 -2013 to be submitted to Government of India for approval. District Area Revised allocated area Thiruvananthapuram 5242 ha 7616 ha Kollam 4189 ha 2212 ha Alappuzha 5820 ha 5421 ha Kottayam 5424 ha 11631 ha 15168 ha Ernakulam 5267 ha 5162 ha Thrissur 6741 ha 5998 ha Palakkad 7948 ha 6165 ha Malappuram 8339 ha 9428 ha Kozhikode 5338 ha 5162 ha Kannur 4876 ha Kasargod. 5090 ha 3050 ha Idkukki

The KSLUB and SS&SC departments shall present the Preliminary Project Reports for batch IV

The KSLUB and SS&SC departments shall present the Preliminary Project Reports for batch IV (2012 -13) for the discussion and approval

BATCH 1 Agenda Item No. 05: 14 DPRs submitted for approval Sl. No. District

BATCH 1 Agenda Item No. 05: 14 DPRs submitted for approval Sl. No. District 1 2 Kasaragod 3 4 5 Palakkad 6 7 8 Wayanad 9 10 BATCH 2 Sl. No. District 1 Alapuzha 2 3 4 Ernakulam Kollam Trivandrum Name of the Project IWMP-I (Kanjangad D 3) IWMP-II (Kanjangad E 1) IWMP-III (Kanjangad G 1) IWMP-I (Thrithala B 7) IWMP-II (Alathur D 1) IWMP-III (Thrithala A 1) IWMP-I (Kalpetta G 1) IWMP-II (Kalpetta F 1) IWMP-III (Kalpetta D 1) IWMP-IV (S Batheri H 5) Name of Project IWMP 1/ 2010 -11 (Champakkulam) IWMP 1/ 2010 -11(Vypin) IWMP 1/ 2010 -11(Ithikkara) IWMP 1/ 2010 - TSO Center for Rural Development Susthira Deena Dayal Susthira Arsha Bharath TSO CSES Grameena Patina Kendram Land Use Board

Agenda Item No. 06: Operational Clarity for batch 3 Projects in Idukki District IWMP

Agenda Item No. 06: Operational Clarity for batch 3 Projects in Idukki District IWMP Batch -III (5 projects) in Idukki district may be entrusted with Block Panchayath as PIA. SLNA has the right to approve Project Implementing Agencies (PIAs) as per Government of India guideline para 27 -e SS&SC department may be given the responsibility of providing technical support for the preparation of estimates, issue of Technical Sanction and supervision of NRM works, such as soil and water conservation under the guidance of Block Panchayath (PIA) and Grama Panchayath (WC)

Agenda Item No. 07: Revision of State Perspective and Strategic Plan (SPSP) Area in

Agenda Item No. 07: Revision of State Perspective and Strategic Plan (SPSP) Area in ha and Rs. In lakhs XI plan XIII plan XIV plan Total for 18 2009 -10 to 2012 -13 to 2017 -18 to 2022 -23 to years 2011 -12 2016 -17 2021 -22 2026 -27 Physical Fin Physical Fin 216569 27031 404996 50148 418169 51671 386453 47734 1426187 17658 3 • In the current SPSP, already treated watersheds are not excluded. • Muncipal and corporation areas are completely excluded • Weightage criteria followed is erroneous • The cluster approach followed is not correct SLNA may take a decision to 1. Revise SPSP. 2. The work of revision of SPSP may be entrusted with KSLUB, SS&SC Department or any suitable NGO. 3. The expenses for the preparation of revising SPSP may be 4. met from state fund.

Agenda Item No. 08: Approval of the tentative district wise break up of the

Agenda Item No. 08: Approval of the tentative district wise break up of the area to be treated for 2013 -14 Sl. No. District Area ha. 1 Thiruvananthapuram 5315 ha 2 Kollam 3657 ha 3 Pathanamthitta 5541 ha 4 Alappuzha 6490 ha 5 Kottayam 6089 ha 6 Idkukki 2423 ha 7 Ernakulam 4473 ha 8 Thrissur 3610 ha 9 Palakkad 5226 ha 10 Malappuram 6291 ha 11 Kannur 5256 ha 12 Kasargod. 5753 ha Total 60124

 Agenda Item No. 09: Empanelling Mid-term Evaluators. § 7 Government organisations have expressed

Agenda Item No. 09: Empanelling Mid-term Evaluators. § 7 Government organisations have expressed willingness to work as mid term evaluators §State government have empanelled 20 non- government organizations as Technical Support Organisations for IWMP. §These organisations have track records in the field of watershed development project formulation and implementation. Together with the 7 government organisations, the list of 20 TSOs can also be forwarded to Do. LR as mid-term evaluators

Agenda Item No. 10: Approval of Technical Supporting Organizations (TSOs) §SLNA hasempanelled 20 TSOs

Agenda Item No. 10: Approval of Technical Supporting Organizations (TSOs) §SLNA hasempanelled 20 TSOs at the beginning year 2009 -10 §This is quite insufficient for meeting the demands for now and in future. §SLNA has received a few applications from Nongovernment organizations. §It may be resolved to empanel more organizations. The selection may be done on a transparent manner by constituting a ‘committee’.

Agenda Item No. 11 : Inter and intra transfer of funds §Do. LR has

Agenda Item No. 11 : Inter and intra transfer of funds §Do. LR has issued orders for inter and intra transfer of funds from one project to another or from one batch to another §Do. LR has issued 6% of the funds to 15 projects. §An additional number of 5 projects are cleared by the steering committee and release of funds in awaited SLNA may give sanction to the transfer of unutilized funds from WCDC to 5 PIAs based on the merit of its performance and the provision in the Do. LR letter

5 projects in batch 3, for which funds not received District Pathanamthitta Thrissur Palakkad

5 projects in batch 3, for which funds not received District Pathanamthitta Thrissur Palakkad Kozhikode Wayanad TOTAL Project Name. No. of MWS Project Area Project Cost IWMP-II/201112 5 4838 5. 8056 8 4887 5. 8644 3 4439 5. 3268 7 5120 6. 144 10 3347 5. 0205 22631 28. 161 IWMP-V/201112 IWMP-III/201112 IWMP-V/201112 33 Name of PIA Pulikeezhu Block Panchayath Chowannur Block Panchayath Nenmara Block Panchayath Balussery Block Panchayath Kalpetta Block Panchayath

Agenda Item No. 12: NWDPRA XI Plan- Proposal for Rs. 4. 71 Crores under

Agenda Item No. 12: NWDPRA XI Plan- Proposal for Rs. 4. 71 Crores under RKVY- ratification in SLNA • National Watershed Development Programme of Rainfed area (NWDPRA XI Plan) is being implemented in the state in selected 134 micro watershed for treating an area of 84415 Ha. • The state has so far recived only 23. 26 Crores from Go. I out of the total project cost of Rs. 101. 29 Crores. • Funds for completion of NWDPRA is to be requested from RKVY. • A proposal for treating 3925 Ha of the balance watershed area under NWDPRA has been prepared by the Soil Survey & Soil Conservation Department. Estimated cost is Rs. 4. 71 Crores • APC has permitted the Department forwarding the proposal to PPM cell for consideration in SLSC meeting. This may be ratified in the SLNA meeting.

Agenda Item No. 14: Time extension of Pre- IWMP projects • There are 28

Agenda Item No. 14: Time extension of Pre- IWMP projects • There are 28 pre- IWMP projects sanctioned by Do. LR to the state. • Do. LR had directed to close the pre-IWMP projects by 31. 12. 2012. • The implementing agencies have requested to extend the time limit for closure atleast by 6 months The SLNA may request Go. I to extend the closure date to 30. 06. 2013

A photo essay on State wide IWMP scheme implementation

A photo essay on State wide IWMP scheme implementation

Visit of Hon. Secretray Do. LR to Vamanapuram- Trivandrum

Visit of Hon. Secretray Do. LR to Vamanapuram- Trivandrum

Visit of Hon. Secretary Do. LR to Alappuzha

Visit of Hon. Secretary Do. LR to Alappuzha

Trivandrum- EPA Inauguration Kasaragod- PRA exercises in progress

Trivandrum- EPA Inauguration Kasaragod- PRA exercises in progress

EPA inauguration- Kollam EPA inauguration- Kasaragod

EPA inauguration- Kollam EPA inauguration- Kasaragod

Mulamthuruthy- EPA inauguration by Hon. Minister for Civil Supplies

Mulamthuruthy- EPA inauguration by Hon. Minister for Civil Supplies

IEC- Vypin. Painting Competition on Environmental awareness Wayanad- Inauguration EPA

IEC- Vypin. Painting Competition on Environmental awareness Wayanad- Inauguration EPA

A Plot Intervention Training by SLNA Feed back from veteran farmer Presentation Of outcomes

A Plot Intervention Training by SLNA Feed back from veteran farmer Presentation Of outcomes Group Discussion

Training program and discussion meeting on IWMP at Kasaragod

Training program and discussion meeting on IWMP at Kasaragod

President, Parappa BP inaugurating the block level training program Participatory Rural Appraisal in Parappa

President, Parappa BP inaugurating the block level training program Participatory Rural Appraisal in Parappa

District level training organised by SLNA at Kasaragod

District level training organised by SLNA at Kasaragod

State level inauguration of Entry Point Activities at Parappa, Kasaragod By Sri. KC. Joseph,

State level inauguration of Entry Point Activities at Parappa, Kasaragod By Sri. KC. Joseph, Hon. Minister for Rural Development 28. 04. 2012 CEO-SLNA- Kerala

c) World Environment Day (June 5) was celebrated in a grand manner all over

c) World Environment Day (June 5) was celebrated in a grand manner all over the state by planting trees and conducting public awareness programmes for disseminating various messages on environment and watershed. This is planned as a theme based campaign with an exclusive logo and slogan.

World Environment Day Celebration in Vypin watershed Eranakulam District

World Environment Day Celebration in Vypin watershed Eranakulam District

World Environment Day Celebration in Alappuzha district

World Environment Day Celebration in Alappuzha district

World Environment day… Various competitions conducted for school students at Vypin, Eranakulam

World Environment day… Various competitions conducted for school students at Vypin, Eranakulam

World Environment Day Celebration in Area code watershed Malappuram District

World Environment Day Celebration in Area code watershed Malappuram District

IWMP- Review & Training program- Kozhikode district

IWMP- Review & Training program- Kozhikode district

Entry Point Activities

Entry Point Activities

Drinking water project in Pattisseri II watershed in Chalisseri panchayath of Palakkad district. Total

Drinking water project in Pattisseri II watershed in Chalisseri panchayath of Palakkad district. Total estimated cost Rs. 653340 CEO-SLNA- Kerala

Paddy field protection in Puliyappattakkayal watershed- Nagalasseri panchayath, Palakkad district. Estimated cost Rs. 1355227

Paddy field protection in Puliyappattakkayal watershed- Nagalasseri panchayath, Palakkad district. Estimated cost Rs. 1355227 CEO-SLNA- Kerala

Paddy field protection -Kakkasseri pata sekhara samithi, Thrithala block. Estimated cost Rs. 624012 CEO-SLNA-

Paddy field protection -Kakkasseri pata sekhara samithi, Thrithala block. Estimated cost Rs. 624012 CEO-SLNA- Kerala

Pond renovation project in Kavukodu watershed, Thrithala block. Estimated cost Rs. 338000 CEO-SLNA- Kerala

Pond renovation project in Kavukodu watershed, Thrithala block. Estimated cost Rs. 338000 CEO-SLNA- Kerala

Lift irrigation project in Parappanathu watershed Anakkara panchayath. Estimated cost Rs. 1172000 CEO-SLNA- Kerala

Lift irrigation project in Parappanathu watershed Anakkara panchayath. Estimated cost Rs. 1172000 CEO-SLNA- Kerala

Soil and water conservation activities in progress in Paravoor watershed in Payyannur block CEO-SLNA-

Soil and water conservation activities in progress in Paravoor watershed in Payyannur block CEO-SLNA- Kerala

Entry Point Activities in progress in Area code watershed Malappuram District

Entry Point Activities in progress in Area code watershed Malappuram District

Grama panchayath level awareness programme Vypin block, Eranakulam District

Grama panchayath level awareness programme Vypin block, Eranakulam District

EPA: Thundipuram Padasekharam, planned for pokkali cultivation as the part of EPA Bund to

EPA: Thundipuram Padasekharam, planned for pokkali cultivation as the part of EPA Bund to be protected

EPA: Block level awareness programme at Champakkulam

EPA: Block level awareness programme at Champakkulam

PRA and Logical framework Analysis in progress in Vypin Block, Eranakulam District

PRA and Logical framework Analysis in progress in Vypin Block, Eranakulam District

Thank You

Thank You

Organisational structure of SLNA

Organisational structure of SLNA

Organisational Structure of IWMP National Rainfed Area Authority-NRAA Governance Executive Tech. Support State level

Organisational Structure of IWMP National Rainfed Area Authority-NRAA Governance Executive Tech. Support State level Go K SLNA Go K District level DPC DLCC WCDC PIA PLCC WDT WC WCC Block/ PIA level GP level Watershed level Gram sabha UGs SHGs

Agenda Item No. 13: IDUKKI PACKAGE The area allotted for Idukki District for the

Agenda Item No. 13: IDUKKI PACKAGE The area allotted for Idukki District for the year 2012 -13 is 11631 Ha. The SLNA may permit enhancement of area from 11634 Ha to 15168 Ha in Idukki District

INSTITUTIONAL SET UP OF IWMP IN KERALA

INSTITUTIONAL SET UP OF IWMP IN KERALA

Placement of professionals SLNA Administrative Officer Technical Expert (Agri) 1 1 GIS Expert Finance

Placement of professionals SLNA Administrative Officer Technical Expert (Agri) 1 1 GIS Expert Finance Officer Accounts Assistant Programmer & MIS/ Data Entry Operator 1 1 2 1

 • District level: Watershed Cell cum Data Center (WCDC) is formed in all

• District level: Watershed Cell cum Data Center (WCDC) is formed in all districts. • The Project Director of Poverty Alleviation Unit is Project Manager • Assistant Project Officer (P&M), one Assistant sericulture Officer and a shared Data Entry Operator are in place. • The remaining experts are to be posted. • Block panchayaths are the Project Implementing agencies (PIA). • 20 Technical Support Organisations have been empanelled by the Government to support PIAs in DPR preparation and capacity building. • Watershed Development Teams (WDT) is formed in every project area with an Agriculture expert, Soil Scientist, Agriculture Engineer and Social mobilizer.

District level Watershed Cell cum Data Center (WCDC) are formed in all districts Project

District level Watershed Cell cum Data Center (WCDC) are formed in all districts Project Manager: Project Director of PAU A Technical Expert Social mobilizer Technical Assistant – Assistant Sericulture Officer MIS/ Data entry operator

Village Level Block panchayaths are the Project Implementing agencies (PIA). 20 Technical Support Organisations

Village Level Block panchayaths are the Project Implementing agencies (PIA). 20 Technical Support Organisations (TSO) have been empanelled by the Government to support PIAs in DPR preparation and capacity building. Watershed Development Teams (WDT) are formed in every project area , with… Agriculture expert, Soil Scientist, Agriculture Engineer Social Mobilizer.