Instruments Bunker Wall interfaces Dawid Patrzalek Preliminary version
Instruments – Bunker Wall interfaces Dawid Patrzalek Preliminary version – minor changes might take place before the CDR www. europeanspallationsource. se
Type of interfaces • Neutron Guides – Bunker’s Wall Feed-through interface • Neutron Guides – Bunker’s Upstream Supports interface • Instrument’s Utilities – Bunker’s Utilities Feed-through interface
Neutron Guides – Bunker’s Wall Feedthrough interface Neutron Guides – Bunker’s Wall Feed-through interfaces must be updated. Status on 2018 -10 -16: Instrument/ Integration Beam port status W 1: NMX OK W 11: TBL To be updated W 2: BEER To be updated N 7: LOKI To be updated W 3: C-SPEC To be updated N 5: FREIA To be updated W 4: BIFROST To be updated E 2: ESTIA To be updated W 5: MIRACLES To be updated E 3: SKADI To be updated W 6: MAGIC To be updated E 7: VESPA To be updated W 7: T-REX To be updated S 2: ODIN To be updated S 3: DREAM To be updated W 8: HEIMDAL To be updated
Neutron Guides – Bunker’s Wall Feedthrough interface Neutron Guides – Bunker’s Wall Feed-through interfaces must be updated. Instrument teams are required to: • Provide updated Neutron Guide model • Provide updated feed-through envelope, keeping in mind: § Wall blocks positioning accuracy of +/- 30 mm § Shimming § Alignment § Etc. All requirements and the newest information can be found on the Confluence page:
Neutron Guides – Bunker’s Upstream Supports interface The Bunker Team was requested to design instrument supports, upstream of the Bunker Wall. Gabor Laszlo would like to integrate an additional plate on top of supports, which would allow to perform adjustment in XZ plane – development is ongoing at Gabor’s side. From mechanical point of view upstream supports have been approved, thus no further development is needed.
Instrument’s Utilities – Bunker’s Utilities Feed-through interface must be implemented. Status on 2018 -10 -16: • Design of utilities is ongoing at ESS’s side (by Talal Osman) From mechanical point of view utilities feed-through have been approved, thus no further development is needed.