INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS Lapu-Lapu Street (L=105. 4 l. m. ; Proj. Cost: P 974, 413. 30) a) Concreting of 4. 137 kms. of city/barangay roads - 18 rd. sections (Total Cost P 12. 242 M. ) Bitano-Barriada Road (L=23. 0 l. m. ; Proj. Cost: P 85, 000. 00) Taysan-Maslog Road (L=76. 0 l. m. ; Proj. Cost: P 200, 000. 00)
INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS Road/Street Section 1. Lapu-Lapu Street 2. Taysan-Maslog Brgy. Road 3. Bitano-Barriada Road 4. Buyuan Brgy. Road 5. Sitio Banban-Homapon Road 6. Imperial Court (Tanchuling Hosp. ) 7. Pawa Brgy. Road 8. Bagong-Abre Brgy. Road SUMMARY Length (l. m. ) 105. 4 Proj. Cost 76. 0 23. 0 88. 6 1, 000. 0 50. 0 P 974, 413. 30 200, 000. 00 85, 000. 00 300, 000. 00 120, 000. 00 150, 000. 00 108. 0 110. 0 300, 000. 00 200, 000. 00
INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS Road/Street Section 10. Banquerohan Reset. Site Rd. 11. Bariis Brgy. Road 12. Taysan-Sitio Pangyawan Road 13. San Francisco-Cagbacong Road 14. Rizal St. & Elizondo St. Junction 15. Puro-Lamba Brgy. Road 16. Homapon-Mariawa Road SUMMARY Length (l. m. ) 300. 0 Proj. Cost P 1, 500, 000. 00 80. 0 385, 740. 26 120. 5 386, 286. 79 367. 5 971, 490. 53 - 332, 388. 58 120. 5 553. 6 487, 866. 00 484, 475. 52
INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS b) Enhancement of Roads Road Sections 1. Peñaranda St. Extension 2. Rizal St. -Ilawod (Brgy. -17) TOTALS Length (l. m. ) 1, 037. 0 26. 0 1, 063. 0 Proj. Cost P 300, 000. 00 70, 467. 00 P 370, 467. 00
INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS c) Opening of Roads/Bridges Roads 1. Homapon-Anonang Road 2. Sitio Banban. Homapon Rd. 3. St. Agnes Exit Bridge & Approaches Length (l. m. ) 150. 0 Proj. Cost 300. 0 P 100, 000. 00 80, 000. 00 9. 3 972, 185. 14
INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS d)Repair and Maintenance (includes asphalt road, patching works, repair of sidewalks & gutters, ditch cleaning) § Total Length: 30. 153 kms. § Total Project Cost: P 2, 972, 185. 14 1. Central Market Road Subd. Road 2. PBN Road 3. Imperial Court Road 4. Guevarra Subd. Road 6. Vel-Amor 7. YMCA-BUSIT 8. Tahao Road 9. Alternate
INFRASTRUCTURE FACILITIES AND AMENITIES 2. FLOOD CONTROL PROJECTS a) Construction of Drainage System Location 1. Cor. Peñaranda & Ramon Santos Sts. 2. Legazpi Central Market TOTALS Length (l. m. ) 21. 30 Proj. Cost P 260, 000. 00 42. 01 15, 998. 00 63. 31 P
INFRASTRUCTURE FACILITIES AND AMENITIES 2. FLOOD CONTROL PROJECTS b) Dredging/Deepening of Channels § Total Length: 3. 10 kms. Location 1. Bogña Channel 2. Mabinit Channel TOTALS Proj. Cost P 15, 000. 0 0 19, 000. 0 0 P
INFRASTRUCTURE FACILITIES AND AMENITIES 2. FLOOD CONTROL PROJECTS c)Rehabilitation of Flood Control Structures 1. Rawis Length (l. m. ) 100. 0 2. Brgy. 17 - Ruran River 3. Brgy. 16 - East Wash. Drive 4. Tibu River TOTALS 225. 0 2, 907, 806. 10 1, 128. 0 P Location Proj. Cost P 150, 000. 00 150. 0 300, 000. 00 653. 0 1, 461, 362. 97
INFRASTRUCTURE FACILITIES AND AMENITIES 2. FLOOD CONTROL PROJECTS d) Construction of Seawall (1 Section) § Total Length: 250. 60 l. m. § Tota Project Cost: P 35, 350, 000. 00 ü Includes Road with Bridge Component, lightings, perimeter fence, outpost/ comfort rooms Aerial View of at the constructed seawall cum Bridge component thenewly Seawall connecting the Boulevard with
INFRASTRUCTURE FACILITIES AND AMENITIES 3. WATER SUPPLY SYSTEM a) Construction/Rehabilitatio n (3 water systems & 1 deep well) Location Unit 1. Tula-Tula 1 Proj. Cost P 130, 000. 00 2. Banquerohan (Level II) 1 2, 856, 844. 38 3. Buenavista 1 496, 000. 00 Construction Well Water ARCDP Water Supply System Project at 4. Padang 1 of a Deep 30, 000. 00 Supply System at Brgy. Tula-Tula Barangay Banquerohan TOTALS 4 P
INFRASTRUCTURE FACILITIES AND AMENITIES 4. ELECTRIFICATION/STREET ILLUMINATION No. of Details/Location Proj. Cost a) Installation of Street Units Illumination 1. San Roque 15 P 111, 488. 00 2. Padang 3. Bigaa 20 20 131, 467. 00 108, 452. 00 4. Arimbay 5. Rawis 6. PLDT-DILG 7. Pawa (Brgy. Funded) 8. Cor. L. Rivera St - PLDT 9. Aesthetic Gogon Basketball Court (Brgy. streetlights along Rizal 12 78, 880. 20 8 52, 586. 80 6 111, 000. 00 35 50, 000. 00 30 530, 000. 00 4 (from 85, 333. 40 St. cor.
INFRASTRUCTURE FACILITIES AND AMENITIES Purok/Sitio 4. 1. ELECTRIFICATION/STREET Sitio Danao ILLUMINATION b) Energization 2. Purok 4 - Malobago 3. Purok 2 - Sitio. Length: Banog § Total Barangay Proj. Cost Imalnod P 356, 785. 09 San Francisco 84, 402. 08 139, 843. 11 5, 746 meters 4. Purok 4 - Malobago -do§ Total Brgys. (puroks / sitios): 9 (635, 680. 64 / 7) = 5. Purok 13 5 - Sitio -do 292, 413. 31 areas Malocban § Total Project Cost: 6. Purok Buenavista 34, 056. 80 P 4, 068, 153. 88 7. Sitio Tinigib 8. Purok 13 - Sitio Banban -do- Mariawa 135, 659. 26 Homapon 280, 059. 00 9. Sitio Kiwalog Bariis 10. Sitio Poliqui Maslog 116, 146. 17 -do- 520, 950. 58 Taysan 686, 705. 93 Puro 257, 142. 07 11. Sitio Macaradat 12. Sitio Guyam 13. Sitio Ginapahan 1, 128, 309. 84