INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS Lapu-Lapu Street (L=105. 4 l. m.

INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS Lapu-Lapu Street (L=105. 4 l. m. ; Proj. Cost: P 974, 413. 30) a) Concreting of 4. 137 kms. of city/barangay roads - 18 rd. sections (Total Cost P 12. 242 M. ) Bitano-Barriada Road (L=23. 0 l. m. ; Proj. Cost: P 85, 000. 00) Taysan-Maslog Road (L=76. 0 l. m. ; Proj. Cost: P 200, 000. 00)

INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS Road/Street Section 1. Lapu-Lapu Street 2.

INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS Road/Street Section 1. Lapu-Lapu Street 2. Taysan-Maslog Brgy. Road 3. Bitano-Barriada Road 4. Buyuan Brgy. Road 5. Sitio Banban-Homapon Road 6. Imperial Court (Tanchuling Hosp. ) 7. Pawa Brgy. Road 8. Bagong-Abre Brgy. Road SUMMARY Length (l. m. ) 105. 4 Proj. Cost 76. 0 23. 0 88. 6 1, 000. 0 50. 0 P 974, 413. 30 200, 000. 00 85, 000. 00 300, 000. 00 120, 000. 00 150, 000. 00 108. 0 110. 0 300, 000. 00 200, 000. 00

INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS Road/Street Section 10. Banquerohan Reset. Site

INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS Road/Street Section 10. Banquerohan Reset. Site Rd. 11. Bariis Brgy. Road 12. Taysan-Sitio Pangyawan Road 13. San Francisco-Cagbacong Road 14. Rizal St. & Elizondo St. Junction 15. Puro-Lamba Brgy. Road 16. Homapon-Mariawa Road SUMMARY Length (l. m. ) 300. 0 Proj. Cost P 1, 500, 000. 00 80. 0 385, 740. 26 120. 5 386, 286. 79 367. 5 971, 490. 53 - 332, 388. 58 120. 5 553. 6 487, 866. 00 484, 475. 52

INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS b) Enhancement of Roads Road Sections

INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS b) Enhancement of Roads Road Sections 1. Peñaranda St. Extension 2. Rizal St. -Ilawod (Brgy. -17) TOTALS Length (l. m. ) 1, 037. 0 26. 0 1, 063. 0 Proj. Cost P 300, 000. 00 70, 467. 00 P 370, 467. 00

INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS c) Opening of Roads/Bridges Roads 1.

INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS c) Opening of Roads/Bridges Roads 1. Homapon-Anonang Road 2. Sitio Banban. Homapon Rd. 3. St. Agnes Exit Bridge & Approaches Length (l. m. ) 150. 0 Proj. Cost 300. 0 P 100, 000. 00 80, 000. 00 9. 3 972, 185. 14

INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS d)Repair and Maintenance (includes asphalt road,

INFRASTRUCTURE FACILITIES AND AMENITIES 1. ROADS AND STREETS d)Repair and Maintenance (includes asphalt road, patching works, repair of sidewalks & gutters, ditch cleaning) § Total Length: 30. 153 kms. § Total Project Cost: P 2, 972, 185. 14 1. Central Market Road Subd. Road 2. PBN Road 3. Imperial Court Road 4. Guevarra Subd. Road 6. Vel-Amor 7. YMCA-BUSIT 8. Tahao Road 9. Alternate

INFRASTRUCTURE FACILITIES AND AMENITIES 2. FLOOD CONTROL PROJECTS a) Construction of Drainage System Location

INFRASTRUCTURE FACILITIES AND AMENITIES 2. FLOOD CONTROL PROJECTS a) Construction of Drainage System Location 1. Cor. Peñaranda & Ramon Santos Sts. 2. Legazpi Central Market TOTALS Length (l. m. ) 21. 30 Proj. Cost P 260, 000. 00 42. 01 15, 998. 00 63. 31 P

INFRASTRUCTURE FACILITIES AND AMENITIES 2. FLOOD CONTROL PROJECTS b) Dredging/Deepening of Channels § Total

INFRASTRUCTURE FACILITIES AND AMENITIES 2. FLOOD CONTROL PROJECTS b) Dredging/Deepening of Channels § Total Length: 3. 10 kms. Location 1. Bogña Channel 2. Mabinit Channel TOTALS Proj. Cost P 15, 000. 0 0 19, 000. 0 0 P

INFRASTRUCTURE FACILITIES AND AMENITIES 2. FLOOD CONTROL PROJECTS c)Rehabilitation of Flood Control Structures 1.

INFRASTRUCTURE FACILITIES AND AMENITIES 2. FLOOD CONTROL PROJECTS c)Rehabilitation of Flood Control Structures 1. Rawis Length (l. m. ) 100. 0 2. Brgy. 17 - Ruran River 3. Brgy. 16 - East Wash. Drive 4. Tibu River TOTALS 225. 0 2, 907, 806. 10 1, 128. 0 P Location Proj. Cost P 150, 000. 00 150. 0 300, 000. 00 653. 0 1, 461, 362. 97

INFRASTRUCTURE FACILITIES AND AMENITIES 2. FLOOD CONTROL PROJECTS d) Construction of Seawall (1 Section)

INFRASTRUCTURE FACILITIES AND AMENITIES 2. FLOOD CONTROL PROJECTS d) Construction of Seawall (1 Section) § Total Length: 250. 60 l. m. § Tota Project Cost: P 35, 350, 000. 00 ü Includes Road with Bridge Component, lightings, perimeter fence, outpost/ comfort rooms Aerial View of at the constructed seawall cum Bridge component thenewly Seawall connecting the Boulevard with

INFRASTRUCTURE FACILITIES AND AMENITIES 3. WATER SUPPLY SYSTEM a) Construction/Rehabilitatio n (3 water systems

INFRASTRUCTURE FACILITIES AND AMENITIES 3. WATER SUPPLY SYSTEM a) Construction/Rehabilitatio n (3 water systems & 1 deep well) Location Unit 1. Tula-Tula 1 Proj. Cost P 130, 000. 00 2. Banquerohan (Level II) 1 2, 856, 844. 38 3. Buenavista 1 496, 000. 00 Construction Well Water ARCDP Water Supply System Project at 4. Padang 1 of a Deep 30, 000. 00 Supply System at Brgy. Tula-Tula Barangay Banquerohan TOTALS 4 P

INFRASTRUCTURE FACILITIES AND AMENITIES 4. ELECTRIFICATION/STREET ILLUMINATION No. of Details/Location Proj. Cost a) Installation

INFRASTRUCTURE FACILITIES AND AMENITIES 4. ELECTRIFICATION/STREET ILLUMINATION No. of Details/Location Proj. Cost a) Installation of Street Units Illumination 1. San Roque 15 P 111, 488. 00 2. Padang 3. Bigaa 20 20 131, 467. 00 108, 452. 00 4. Arimbay 5. Rawis 6. PLDT-DILG 7. Pawa (Brgy. Funded) 8. Cor. L. Rivera St - PLDT 9. Aesthetic Gogon Basketball Court (Brgy. streetlights along Rizal 12 78, 880. 20 8 52, 586. 80 6 111, 000. 00 35 50, 000. 00 30 530, 000. 00 4 (from 85, 333. 40 St. cor.

INFRASTRUCTURE FACILITIES AND AMENITIES Purok/Sitio 4. 1. ELECTRIFICATION/STREET Sitio Danao ILLUMINATION b) Energization 2.

INFRASTRUCTURE FACILITIES AND AMENITIES Purok/Sitio 4. 1. ELECTRIFICATION/STREET Sitio Danao ILLUMINATION b) Energization 2. Purok 4 - Malobago 3. Purok 2 - Sitio. Length: Banog § Total Barangay Proj. Cost Imalnod P 356, 785. 09 San Francisco 84, 402. 08 139, 843. 11 5, 746 meters 4. Purok 4 - Malobago -do§ Total Brgys. (puroks / sitios): 9 (635, 680. 64 / 7) = 5. Purok 13 5 - Sitio -do 292, 413. 31 areas Malocban § Total Project Cost: 6. Purok Buenavista 34, 056. 80 P 4, 068, 153. 88 7. Sitio Tinigib 8. Purok 13 - Sitio Banban -do- Mariawa 135, 659. 26 Homapon 280, 059. 00 9. Sitio Kiwalog Bariis 10. Sitio Poliqui Maslog 116, 146. 17 -do- 520, 950. 58 Taysan 686, 705. 93 Puro 257, 142. 07 11. Sitio Macaradat 12. Sitio Guyam 13. Sitio Ginapahan 1, 128, 309. 84