Infrastructure – Condition Assessment Overview & Purpose • Infrastructure Condition Assessment – General Findings/Conditions

Infrastructure – Condition Assessment Overview & Purpose • Infrastructure Condition Assessment – General Findings/Conditions – – Streets/Sidewalks/Parking Lots Storm Drainage System Water System Sanitary Sewer System • Capital Improvement Program Development – Analysis of Data – Modeling – Cost Opinion • Memoranda of Agreement

Infrastructure – Condition Assessment Streets and Bridges – 90% Complete • Assessment of curb/gutter,

Infrastructure – Condition Assessment Streets and Bridges – 90% Complete • Assessment of curb/gutter, sidewalk, parking lots, signs & markings • VDOT reviewing the street inventory to make a judgment on funding eligibility • Roadware Study Review • 2008 Bridge Inspection Report Review

Infrastructure – Condition Assessment Stormwater – 100% Complete • Limits of condition assessments –

Infrastructure – Condition Assessment Stormwater – 100% Complete • Limits of condition assessments – 40 structures assessed – All outfalls assessed – Pipe material identification • Evaluation of 2005 Report • System Mapping

Infrastructure – Condition Assessment Wastewater – 75% Complete • Gravity system condition assessments –

Infrastructure – Condition Assessment Wastewater – 75% Complete • Gravity system condition assessments – Manhole Checks and Entry Assessments – Review of Past Studies • Evaluation of existing system condition information from ODUS • Remaining Work – CCTV Gravity and Pressure Systems – Start 12/1/09 – Flow Monitoring – Start 1/1/10 – System Mapping/Modeling – Pump Station Evaluations

Infrastructure – Condition Assessment Water – 80% Complete • Evaluation of existing system condition

Infrastructure – Condition Assessment Water – 80% Complete • Evaluation of existing system condition information from ODUS • System Mapping/Modeling • Material Assessments by NNWW

Infrastructure – Condition Assessment Hampton, Newport News, and Other Coordination • Met with Hampton,

Infrastructure – Condition Assessment Hampton, Newport News, and Other Coordination • Met with Hampton, NNWW, ODUS, and DPW in September • Met with DEQ and HRSD in October – Fort Monroe will not be required to participate in the Regional DEQ Consent Order • Information Sharing • Accompany Field Crews doing Condition Assessment

Infrastructure – Condition Assessment What’s Next? • Complete Field Investigations by 12/31/09 • Flow

Infrastructure – Condition Assessment What’s Next? • Complete Field Investigations by 12/31/09 • Flow Monitoring Sewer 1/1/10 • Develop Water & Sewer System Models • Data Analysis and Final Assessment Report • Capital Improvement Program/Cost Opinions • Memorandums of Agreement