INDUSTRIAL MATHEMATICS GROUP STUDY GROUP ACTIVITIES MOHAN C

  • Slides: 25
Download presentation
INDUSTRIAL MATHEMATICS GROUP & STUDY GROUP ACTIVITIES MOHAN C JOSHI mcj@math. iitb. ac. in

INDUSTRIAL MATHEMATICS GROUP & STUDY GROUP ACTIVITIES MOHAN C JOSHI mcj@math. iitb. ac. in INDUSTRIAL MATHEMATICS GROUP IIT BOMBAY

CONTENTS • INDUSTRIAL MATHEMATICS GROUP • STUDY GROUP ACTIVITY • NATIONAL ACTIVITIES PERSPECTIVE

CONTENTS • INDUSTRIAL MATHEMATICS GROUP • STUDY GROUP ACTIVITY • NATIONAL ACTIVITIES PERSPECTIVE

INDUSTRIAL MATHEMATICS GROUP • INITIALLY STARTED ABOUT TWO DECADES AGO TO SPREAD THE APPLICABILITY

INDUSTRIAL MATHEMATICS GROUP • INITIALLY STARTED ABOUT TWO DECADES AGO TO SPREAD THE APPLICABILITY POWER OF MATHEMATICS IN SOLVING REAL LIFE PROBLEMS • CURRENTLY, ALSO INVOLVED IN PROTECTING THE INTEREST OF MATHEMATICS AND MATHEMATICIANS BY DEFINING ROLE OF MATHEMATICS FOR PURPOSEFUL WORK IN SCIENCE AND TECHNOLOGY

PURPOSEFUL ROLE • PROVIDE VIABLE MATHEMATICAL AND STATISTICAL FRAMEWORK FOR ANALYSIS AND COMPREHENSION OF

PURPOSEFUL ROLE • PROVIDE VIABLE MATHEMATICAL AND STATISTICAL FRAMEWORK FOR ANALYSIS AND COMPREHENSION OF EFFICIENT METHODOLOGIES IN TECHNOLOGICAL PROCESSES • INTRODUCE THE PRACTICING MATHEMATICIANS TO LATEST ART AND CRAFT OF MATHEMATICAL TECHNOLOGY • EMPHASIZE THE NEED OF COMPUTER AIDED ENVIRONMENT EQUIPPED WITH APPROPRIATE SOFTWARE TO FUNCTION AS TEACHING AID • TRAIN SCIENTISTS AND ENGINEERS TO INTERACT WITH BOTH ACADEMICIANS AND INDUSTRIAL SCIENTISTS • DEVELOP A NETWORK OF COLLABORATING INSTITUTIONS TO TACKLE PROBLEMS OF MUTUAL INTEREST

AREAS OF RESEARCH INTEREST • MODELLING AND SIMULATION • CONTROL AND OPTIMIZATION • NUMERICAL

AREAS OF RESEARCH INTEREST • MODELLING AND SIMULATION • CONTROL AND OPTIMIZATION • NUMERICAL COMPUTATION INCLUDING FEM • SOLVABILITY ANALYSIS OF ODE AND PDE • SATISTICAL ANALYSIS AND FINANCIAL MATHEMATICS • COMPUTER AIDED GEOMETRIC DESIGN

ACTIVELY INVOLVED IN • ORGANIZING WORKSHOPS - CUM - STUDY GROUP MEETINGS TO DEAL

ACTIVELY INVOLVED IN • ORGANIZING WORKSHOPS - CUM - STUDY GROUP MEETINGS TO DEAL WITH REAL LIFE PROBLEMS REQUIRING MATHEMATICAL SOLUTION UNDER THE AUSPICES OF AICTE, NBHM, DST, UNESCO, INDO-UK NETWORKING PROGRAMME • SPONSORED PROJECTS FROM DST, AICTE, NBHM AND EUINDIA CO-OPERATIVE PROGRAMME • INTERACTION WITH RBI AND OTHER BANKS IN THE AREA OF FINANCIAL MATHEMATICS • DEVELOPING PARTNERSHIP WITH INDUSTRY FOR RESEARCH AND JOINT PROGRAMMES • NETWORKING WITH OTHER INSTITUTIONS IN INDIA FOR WORKSHOPS, SCIENTIFIC VISITS AND POSSIBLE JOINT PROGRAMMES

IMG PROBLEM SOLVING ACTIVITIES CARRIED OUT WORKSHOPS ( STUDY GROUP MEETINGS ) ON A

IMG PROBLEM SOLVING ACTIVITIES CARRIED OUT WORKSHOPS ( STUDY GROUP MEETINGS ) ON A NATIONAL AND INTERNATIONAL SCALE ( IN COLLABORATION WITH OCIAM, OXFORD UNIVERSITY) • DECEMBER 2002, IIT BOMBAY • DECEMBER 2003, MSU, BARODA • DECEMBER 2004, IIT BOMBAY • MARCH 2006, MSU, BARODA (CONFERENCE)

SAMPLE OF 2002 PROBLEMS • CONSTRUCTING A WAVE REFLECTOR TO PROTECT BEACHES • THE

SAMPLE OF 2002 PROBLEMS • CONSTRUCTING A WAVE REFLECTOR TO PROTECT BEACHES • THE SELF HEATING COFFEE-CAN • A STRATEGY FOR ANALYSIS OF LARGE GROUP OF POLLUTED SOIL SAMPLES • VALUATION OF CURRENCY OPTIONS USING ARTIFICIAL NEURAL NETWORK • OPTIMUM HEIGHT FOR CHECK DAM ON A RIVER

SAMPLE OF 2003 PROBLEMS • UPSTREAM RESERVOIR WATER LEVEL OF SARDAR SAROVAR DAM •

SAMPLE OF 2003 PROBLEMS • UPSTREAM RESERVOIR WATER LEVEL OF SARDAR SAROVAR DAM • HEAT TREATMENT ANALYSIS OF BALL BEARINGS • OPTICAL MEASUREMENTS OF YARN HAIRINESS • ANALYSIS OF FERRO-RESONANCE IN POTENTIAL TRANSFORMERS • FAIR PRICE FOR THE OPTIONAL DERIVATIVES • UNDERGROUND COAL GASIFICATION

SAMPLE OF 2004 PROBLEMS • PLANNING OF LOOP TYPE DISTRIBUTION SYSTEM LAYOUT • TEMPERATURE

SAMPLE OF 2004 PROBLEMS • PLANNING OF LOOP TYPE DISTRIBUTION SYSTEM LAYOUT • TEMPERATURE RISE CALCULATION FOR A DRY TYPE TRANSFORMER • TRANSMISSION OF THE MONETARY POLICY IMPULSES • CONTROL OF INLET TEMPERATURE OF EXPERIMENT ASSEMBLY • SIMULATION OF UCG CAVITY • MODELING MEMORY ACCESS PATTERNS IN VLSI SYSTEM • OPTIMUM COMPOSITION OF PORTFOLIO

SAMPLE OF 2006 PROBLEMS • MATHEMATICAL MODEL OF OIL IMMERSED EXPLOSION TYPE FUSE •

SAMPLE OF 2006 PROBLEMS • MATHEMATICAL MODEL OF OIL IMMERSED EXPLOSION TYPE FUSE • MODELLING ENERGY FORECASTING • NEURAL MODELING OF MOONEY VISCOSITY OF POLY BUTADIENE RUBBER • GEOMETRIC MODELLING OF TYRE PROFILING • OPTIMIZATION BETWEEN LIQUIDITY AND PROFITABILITY OF URBAN COOPERATIVE BANKS • COMMUNICATION ISSUES IN DATA TRANSMISSION • OPTIMUM COMPOSITION OF PORTFOLIO • ENERGY DISSIPATION AND FLOW SIMULATION IN SARDAR SAROVAR DAM

ABOUT THE STUDY GROUP • REAL LIFE PROBLEM PRESENTATION BY USER COMMUNITY • PARTICIPATING

ABOUT THE STUDY GROUP • REAL LIFE PROBLEM PRESENTATION BY USER COMMUNITY • PARTICIPATING TEAM MEMBERS (5 -6 PERSONS) WORK ON PROBLEM JOINTLY • EMPHASIS ON TIME SCHEDULE FOR PROBLEM SOLVING • FORMAL SOLUTION PRESENTATION WITH FULL MATHEMATICAL MODEL, TECHNIQUES, ALGORITHMS AND NUMERICAL RESULTS

DAILY SCHEDULE - DAY 1 THE FIRST DAY OF THE 6 -DAY MEET WILL

DAILY SCHEDULE - DAY 1 THE FIRST DAY OF THE 6 -DAY MEET WILL BE • DEVOTED FOR THE PURPOSE OF PROBLEM PRESENTATION • THIS WILL BE FOLLOWED BY FORMATION OF WORKING GROUPS FOR DIFFERENT SET OF PROBLEMS • EACH WORKING GROUP WILL BE LED BY A RESOURCE PERSON

DAY 2 • WORKING GROUPS START WORKING ON THEIR RESPECTIVE PROBLEMS • EVOLVE A

DAY 2 • WORKING GROUPS START WORKING ON THEIR RESPECTIVE PROBLEMS • EVOLVE A CORRECT MATHEMATICAL MODEL, SUITABLE MATHEMATICAL TECHNIQUE AND EFFICIENT ALGORITHMIC PROCEDURE

DAY 3 • WORKING GROUPS ARE EXPECTED TO COME UP • WITH THE CORRECT

DAY 3 • WORKING GROUPS ARE EXPECTED TO COME UP • WITH THE CORRECT MATHEMATICAL MODEL FOR THE PROBLEM • EVOLVE SOME APPROXIMATE MATHEMATICAL PROCEDURE FOR SOLUTION STRATEGY • SOLUTION STRATEGY TO BE FORMALLY PRESENTED IN A MID-APPRAISAL SEMINAR

DAY 4 -5 -6 • ALL WORKING GROUPS STRIVE TOWARDS FULL AND COMPLETE SOLUTION

DAY 4 -5 -6 • ALL WORKING GROUPS STRIVE TOWARDS FULL AND COMPLETE SOLUTION OF THE PROBLEM ON DAY 4 -5 • ALL DAY FORMAL PRESENTATION OF THE APPROACH PAPER FOR SOLUTION OF THE RESPECTIVE PROBLEM ON DAY 6 • MANDATORY FOR ALL GROUPS TO SUBMIT A FULL REPORT ON THEIR RESPECTIVE PROBLEMS • WORKSHOP COORDINATORS PREPARE A FINAL REPORT BEFORE DEPARTURE

STUDY GROUP MEETING MARCH 2009 IN COLLABORATION WITH THE UNIVERSITY OF OXFORD, UK WILL

STUDY GROUP MEETING MARCH 2009 IN COLLABORATION WITH THE UNIVERSITY OF OXFORD, UK WILL MAINLY FOCUS ON PROBLEMS PERTAINING TO UTTARAKHAND • • • AGRICULTURE ECOLOGY & ENVIRONMENT FORESTRY WATER RESOURCES & POWER PETROLEUM RESOURCES THE PARTICIPATION WILL BE ON ALL-INDIA BASIS

WHAT ARE THE POSITIVE GAINS FOR PARTICIPANTS? • LEARN TO WORK AS TEAM MEMBERS

WHAT ARE THE POSITIVE GAINS FOR PARTICIPANTS? • LEARN TO WORK AS TEAM MEMBERS – ESSENTIAL FOR A LARGE SIZE PROBLEM • GET FEEL FOR REAL LIFE PROBLEMS • GET TRAINING TO USE MATHEMATICAL AND STATISTICAL TECHNIQUES AWAY FROM CLASS ROOM ENVIRONMENT • DEVELOP ABILITY TO INTERPRET DATA, DEVISE SOLUTION STRATEGY AND PRESENT CONVINCING SOLUTION , AT TIMES EVEN HALF COOKED ONES TO USER COMMUNITY

NATIONAL ACTIVITIES PERSPECTIVE • PARTNERSHIP WITH INDUSTRY • REGIONAL RSOURCE COMMITTEE • NATIONAL COORDINATION

NATIONAL ACTIVITIES PERSPECTIVE • PARTNERSHIP WITH INDUSTRY • REGIONAL RSOURCE COMMITTEE • NATIONAL COORDINATION COMMITTEE

PARTNERSHIP WITH INDUSTRY • FLOAT SHORT COURSES AND TRAINING WORKSHOPS FOR USER COMMUNITY MAKING

PARTNERSHIP WITH INDUSTRY • FLOAT SHORT COURSES AND TRAINING WORKSHOPS FOR USER COMMUNITY MAKING THEM REALIZE THE APPLICABILITY POTENTIAL OF MATHEMATICS • EXTRACT THE INFORMATION FROM THEM ABOUT THE ISSUES WHICH REQUIRE ROBUST SOLUTION STRATEGY – BASED ON MATHEMATICAL TOOLS ( MAY OR MAY NOT BE VERY HIGHLY MATHEMATICAL) • GENERATE 6 -12 MONTHS PROJECTS FOR STUDENTS AS A PART OF COURSE REQUIREMENT OR PROGRAMME REQUIREMENT • AIM TOWARDS A BIGGER SIZE PROJECT REQUIRING INVOLVEMENT OF FACULTY WITH EXPERTISE IN DIFFERENT AREAS - ACROSS ALL DISCIPLINES

REGIONAL RESOURCE CENTRES ENVISAGED TO BE CELLS COMPRISING OF • SENIOR MATHEMATICIANS BASED IN

REGIONAL RESOURCE CENTRES ENVISAGED TO BE CELLS COMPRISING OF • SENIOR MATHEMATICIANS BASED IN PARTNERING ACADEMIC INSTITUTIONS • INDUSTRIAL SCIENTISTS FROM SATELLITE INDUSTRIES • IT MANAGERS (IN-HOUSE) – TO PROVIDE NETWORKING FACILTY FOR DATA FLOW AND INFORMATION FLOW ON A CONTINUOUS BASIS • RRC’S TO BE HOUSED IN THE PARTNERING INSTITUTIONS CAMPUS

PRINCIPAL TASK – RRC • GENERATE COLLABORATIVE PROJECTS WITH INDUSTRY- SHORT TERM, LONG TERM,

PRINCIPAL TASK – RRC • GENERATE COLLABORATIVE PROJECTS WITH INDUSTRY- SHORT TERM, LONG TERM, SPONSORED, CONSULTANCY ETC. • DO LIAISON WORK AMONG PARTNERING INSTITUTIONS AND INDUSTRY FOR SHARING PROJECTS FOR ACADEMIC AND COMMERCIAL PURPOSE • FUNCTION AS INDEPENDENT ENTITY FOR PROVIDING LOW END AND HIGH END MATHEMATICAL INPUTS FOR PROJECTS

RRC SPIN-OFF • VALUABLE FEED-BACK ON CURRENT COURSES AND PROGRAMMES • CONTINUOUS SOURCE OF

RRC SPIN-OFF • VALUABLE FEED-BACK ON CURRENT COURSES AND PROGRAMMES • CONTINUOUS SOURCE OF PROJECT GENERATOR FACULTY AND STUDENTS • EASY AVAILABILITY OF ADJUNCT FACULTY – INDUSTRY INPUTS, COURSE UPGRADING ETC. • MUTUAL SHARING OF RESOURCES – ACADEMIA AND INDUSTRY • KEY STIMULANT FOR PLACEMENT

NATIONAL COORDINATION COMMITTEE (NCC) • TO COMPRISE OF REPRESENTATIVE OF RRC’S, CII, FICCI, NBHM,

NATIONAL COORDINATION COMMITTEE (NCC) • TO COMPRISE OF REPRESENTATIVE OF RRC’S, CII, FICCI, NBHM, AICTE AND UGC • WILL INTERACT ON REGULAR BASIS WITH USER COMMUNITY – DRDO, ISRO, TCS, INFOSYS, AND OTHER INDUSTRIAL HOUSES • FRAME POLICY MATTERS NOT PROGRAMMES • INTERACT WITH INTERNATIONAL BODIES LIKE SIAM, ECMI AND AMS TO PROVIDE GLOBAL PERSPECTIVE FOR PARTNERSHIP PROGRAMMES

THANKYOU

THANKYOU