INDIGENISATION IN INDIAN NAVY OPORTUNITIES FOR INDUSTRY INDIAN
- Slides: 61
INDIGENISATION IN INDIAN NAVY OPORTUNITIES FOR INDUSTRY INDIAN NAVY
SCOPE OF PRESENTATION Ø GROWTH OF IN Ø CLASSIFICATION & PROVISIONING OF ITEMS Ø SPECIFIC NEEDS OF IN Ø INDIAN NAVAL INDIGENISATION PLAN Ø MAKE & REVENUE PROCEDURES Ø CONCERNS IN INDIGENISATION Ø INDIGENISATION SUCCESS STORIES 2
GROWTH OF IN
BUYER TO BUILDER 70 s 80 s 90 s 2000 2010 TRANSITION FROM BUYER NAVY TO A BUILDER NAVY 4
ONGOING PROGRAMMES • AIRCRAFT CARRIER • DESTROYERS • FRIGATES • SUBMARINES • TRAINING SHIPS • PATROL VESSELS • FAST INTERCEPTOR CRAFTS 5
CLASSIFICATION & PROVISIONING OF ITEMS
SHIP’S FUNCTIONAL GROUPS FLOAT MOVE FIGHT 7
PROVISIONING OF ITEMS • IMPORT • COTS ITEM SUITABLY ‘HARDENED’ • TOT/ LICENCED PRODUCTION • REVERSE ENGINEERING • AB-INITIO DEVELOPMENT USING FORM/ FIT/ FUNCTION • R&D 8
PERCENTAGE % PRESENT INDIGENOUS CONTENT 100 90 80 70 60 50 40 30 20 10 0 90 65 60 40 35 IMPORT CONTENT 10 FLOAT INDIGENOUS CONTENT MOVE CATEGORY FIGHT 9
SPECIFIC NEEDS OF IN
WARSHIP VIS-À-VIS MERCHANT SHIP § DYNAMIC/ CYCLIC LOADING § LOW TOXICITY OF COATINGS § WITHSTAND HIGH SHOCK/ VIBRATION/ DAMAGE § STEALTH/ LOW SIGNATURES § SUBMERGED OPERATION § FIRE RESISTANCE § LOW EMI/ EMC § SPACE CONSTRAINTS MUST BE FACTORED IN DURING DESIGN 11
INDIAN NAVAL INDIGENISATION PLAN 12
INIP 2015 -2030: PURPOSE § GUIDELINE DOCUMENT TO ENUNCIATE NEED FOR DEVELOPING ADVANCED SYSTEMS FOR PLATFORMS § AIMED AT ENABLING INDIGENOUS DEVELOPMENT OF EQUIPMENT AND SYSTEMS IN COMING YEARS § 1 ST 15 YEAR INDIGENISATION PLAN PUBLISHED 2008 § INIP (2015 -2030) SUPERSEDES EARLIER PLAN § ADDITION IN CONTENT IS PLANNED BY DEC 2018 13
INIP 2015 -2030: OVERVIEW • INTRODUCTION ü ITEMS BEING IMPORTED ü CAPABILITY GAPS & PARTNERSHIP POTENTIAL • INDIGENOUS DEVELOPMENT SO FAR • CATEGORY-WISE SHIPBOARD EQUIPMENT • FUTURE TECHNOLOGIES ENVISAGED • FORECAST REQUIREMENTS 14
REQUIREMENTS: FLOAT § HULL MATERIALS § HULL PAINTS § RADAR ABSORPTION PAINTS § ADVANCED HULL COATINGS 15
REQUIREMENTS: MOVE § ACTIVE MOUNTS § FUEL CELLS § LOW ACOUSTIC SIGNATURE MACHINERY § ELECTRIC DRIVE PROPULSION § SOLID STATE POWER ELECTRONICS § IMPROVED BATTERY POWER SYSTEMS § MAGAZINE FIRE FIGHTING SYSTEM 16
REQUIREMENTS: FIGHT § LONG RANGE ELECTRO OPTICAL SENSORS § FRESNEL LENS BASED OPTICAL LANDING SYSTEM § CLOSE-IN WEAPON SYSTEM § INFRA-RED/THERMAL IMAGING SEARCH AND TRACKING SYSTEM § NEXT GEN NIGHT VISION DEVICES 17
FUTURE TECHNOLOGIES § MATERIAL § FUSION TECHNOLOGY § BIO-FUELS § SPACE TECHNOLOGY § BIO-TECHNICAL WEAPONS § MISSILE TECHNOLOGY AND HYPERSONICS § IT/ CYBER WARFARE § NANO TECHNOLOGY § UNMANNED WEAPON DELIVERY SYSTEMS § ARTIFICIAL INTELLIGENCE 18
MAKE SCHEME
“MAKE” – DPP 2016 • “Make” categorisation of defence procurement aims at Ø Developing long-term Indigenous Defence capabilities Ø Act as vital pillar for realising vision behind “Make in India” initiative Ø Promote Self reliance in Defence manufacturing • Acquisition's under “Make” includes Ø Equipment/System/Sub-system/assembly/sub-assembly Ø Major Components or upgrades thereof
“MAKE” – DPP 2016 • ‘Make’ Categories Ø Make –I (Govt Funded) • 90% Govt Funding • Released in phased manner based on progress of scheme • As per terms between Mo. D and Vendor Ø Make – II (Industry Funded) • Impetus for MSME/Start-ups Sector • Wider participation of Indian industry • Involves Prototype Development - Focus on Import Substitution
‘Make II’ Procedure Chapter III A of DPP 2016 Reference : 11/25/2020 ‘www. makeinindiadefence. gov. in’ 22
“MAKE-II” – PROCESS FLOW ü Advance Planning &Consultation ü Approval-in-Principle (AIP) ü Feasibility Study ü Prelim. Staff Qualitative Requirements (PSQRs) ü Preparation of So. C & Formation of PFT ü Accord of ‘Acceptance of Necessity’ (AON) ü Issue of Expression of Interest (Eo. I) ü Eo. I Response submission
“MAKE-II” – PROCESS FLOW ü Eo. I Response Evaluation ü Award of Project Sanction Order ü Design & Development of Prototype ü Conversion of PSQRs to SQRs ü Solicitation of Commercial Offer ü User Trials (Both Vendor & User involved) ü Staff Evaluation ü Commercial Negotiations ü Award of Contract (Buy-Indian: IDDM)
ADVANCE PLANNING & CONSULTATIONS Tasks Ø Identify Potential Projects Ø Discussions with DRDO, HQIDS, DDP Ø Ø AIP : Accorded by Secy (DP) Ø Project Brief, Questionnaire uploaded Ø (To invite willingness of Industry to participate) “www. makeinindiadefence. gov. in” 11/25/2020 25
FEASIBILITY STUDY Stakeholders : IHQ, DRDO, HQ IDS, DDP, Mo. D(Fin), Industries Deliverables: Ø Prelim. Assessment of Industry Capability Ø Duration for Development Ø Cost 11/25/2020 - Prototype Development - Subsequent procurement 26
CONSTITUTION OF PFT DGQA Member Secretary Mo. D/ Fin Chairman Mo. D/ DDP 11/25/2020 Prof Dte &DOI 27
PROJECT FACILITATION TEAM (PFT) Responsibilities of PFT Ø Prepare & Issue Eo. I (RFP for Tech. Proposal) Ø Evaluation of Eo. I Response Ø Prepare Project Sanction Order (with ‘Nil’ Fin. Implication) Ø Interface between IN and Industry during Project Execution 11/25/2020 28
EXPRESSION OF INTERST Ø AON by Competent Authority Ø Eo. I : Uploaded in DDP Website Eo. I - Scope of Project , Nos. of Prototype - Timeframes & Critical Activities List of Trials/ Facilities /Items (By IN)& No. of Such Free Trials Qty for subsequent procurement under ‘Buy (Indian - IDDM)’ Acceptability of Multiple Technology Solution Evaluation Criteria: Technical, Commercial & Financial 29
EVALUATION OF ‘EOI’ RESPONSE Ø Evaluation of EOI Response against Technical Commercial & Financial Criteria Ø Shortlisted Firms – Development Agencies Ø Sanction for Prototype Development (with Nil Financial Implications) 11/25/2020 30
DESIGN & DEVELOPMENT Role of PFT Ø Interface with Industry Ø Provide Professional Inputs to Dev. Agency Ø Conversion of PSQR to SQR prior to trial Ø Issue of RFP for Commercial Offer (RFP) Ø Review ‘User Trial’ Readiness 11/25/2020 31
SOLICITATION OF COMMERCIAL OFFER Ø RFP for ‘Buy (Indian - IDDM) will be issued to all DA(s) Ø Eqpt. Qty : Specified & Fixed in Eo. I Ø Submission of Commercial Offer -- Prior User Trials 11/25/2020 32
USER TRIALS Ø PFT will formulate Trial Directives & Trial Team Ø User Trials : Essential Parameters will be Tested Ø User may Recommend Modifications (for Ease of Handling but no Design Modification Allowed at this Stage) 11/25/2020 33
POST USER TRIALS Ø Staff Evaluation Ø Commercial Bids of Successful DAs opened Ø Commercial Negotiation by CNC Ø Post CNC, case is to be progressed as Buy (Indian. IDDM) Ø Multiple Technological Solution – Option for Procurement from L 2 vendor in 70: 30 Ratio, provided 2 nd DA Accepts Terms & Conditions, Price of L 1 – All other successful DAs will be given Certificate 11/25/2020 34
‘MAKE II’ Projects AIP Accorded 11/25/2020 35
MAKE II PROJECTS - AIP ACCORDED Ser. 1 Project Deep Sea Side Scan Sonar Towing Winch (DS 4 TW) 2 Upper Air Sounding System (UASS) 3 Expendable Underwater Target 4 Digital Beamforming Based Satellite TV (DB 2 ST) 5 Universal Proximity, Direct Action And Graze Fuses For Gun Ammunition Of 76 To 127 mm Single & Three Phase Inverters 6 Directorate of Indigenisation 36
MAKE II PROJECTS - AIP ACCORDED Ser. Project 7 Electronic Fuze for Anti-Submarine Rocket RGB 60 8 Detonator 7 Sec Delay for Hand Grenade 36 9 High Speed Low Flying Target 10 Chaff Payload for Kavach Rockets (LRSM, MRSM) Directorate of Indigenisation 37
‘MAKE’ PROJECTS EXPLORATORY 11/25/2020 38
‘MAKE’ PROJECTS - EXPLORATORY Ser. 1 Project 2 Diesel Engines for Boats Diesel Engines for Propulsion (5 -10 MW) 3 Low Noise Water-Jets for Surface Platforms 4 Float Smoke and Flame A/c 3. 5 lbs No. 2 Mk 2 5 Limpet Mine ‘MK 414’(7 Kg) 6 Limpet Mine ‘MK 430’ (15 Kg) 7 Signal Flares and associated Consumable Kits for P-75 Submarines Directorate of Indigenisation 39
IMPORTANT ASPECTS IN DEVELOPMENT
IMPORTANT ASPECTS - DEVELOPMENT Ø Drawings & Documentation Ø Quality Assurance Plans Ø Test Plans Including Type Test Ø PIL with Part Nos Ø Life Cycle Support 11/25/2020 41
IMPORTANT ASPECTS - DEVELOPMENT Ø Quality Assurance Plans Standard QAPs are available at DGQA website www. dgqadefence. gov. in Technical Directorate DGQA(WP) Compendium of MQAPs & QAPs
TEST FACILITIES
IMPORTANT ASPECTS - DEVELOPMENT Ø Various Test Facilities - Govt. Labs including DGQA listed at Mo. D website www. makeinindiadefence. gov. in Test Facilities Scroll down for PSUs/Services Procedure and Cost
REVENUE CASES
INDIGENISATION PROCESS AT DOI [NEED GENERATION TO CONTRACT CONCLUSION] 46
INDIGENISATION PROCESS AT DOI [PROJECT EXECUTION] 47
CONCERNS IN INDIGENISATION
CONCERNS - TECHNICAL § RESEARCH & DEVELOPMENT § METALLURGY § DEVIATIONS FROM LAID DOWN SPECS § DRAWINGS/ QAPs § PAPER PARTICULARS FOR REPEATABILITY § QUALITY & RELIABILITY § HIGH TIME FRAME 49
INDIGENISATION SUCCESS STORIES
INDIGENISATION UNDERTAKEN FLOAT § DRDO/DPSU § INDIGENOUS SHIP BUILDING INCLUDING DESIGN § SHIPBUILDING STEEL DMR 249 A § INDUSTRY § HANGAR DOORS, CAPSTANS § BOATS, INFLATABLE CRAFTS 51
INDIGENISATION UNDERTAKEN MOVE § DRDO/DPSU § BOILER, STEAM TURBINE § GTG CONTROL SYSTEM § INDUSTRY § DIESEL ENGINES, SUBMARINE BATTERIES § AC & REF PLANTS, AIR COMPRESSOR 52
INDIGENISATION IN PROGRESS MOVE § AIR INDEPENDENT PROPULSION § INTEGRATED PLATFORM MANAGEMENT SYSTEM 53
INDIGENISATION UNDERTAKEN FIGHT § BRAHMOS MISSILE SYSTEM § ROCKET/TORPEDO LAUNCHERS § GUNS § SONARS/RADARS § ESM/EW SYSTEMS § COMBAT MANAGEMENT SYSTEM 54
INDIGENISATION IN PROGRESS FIGHT § LIGHT WEIGHT MINE § 3 D C/D & E/F SURVEILLANCE RADAR § SOFTWARE DEFINED RADIO § ELECTRO OPTICAL INSTRUMENTS § LONG RANGE SURFACE TO AIR MISSILE § SHORT RANGE SURFACE TO AIR MISSILE 55
INDIGENISATION BY DOI SNF CLASS STABILISER SYSTEM G CLASS STABILISER SYSTEM 56
INDIGENISATION BY DOI SNF CLASS GTG CONTROL SYSTEM G CLASS STEERING GEAR SYSTEM 57
INDIGENISATION BY DOI URAN MISSILE EXTRACTION TROLLEY MISSILE LOADER FOR CLUB – N MISSILES 58
AVENUES FOR INDIAN INDUSTRY • HEALTHY ORDER BOOK OF DEFENCE SHIPYARDS • MID LIFE UPGRADE • REPLACEMENT OF OBSOLETE EQUIPMENT IN A PHASED MANNER • INDIGENISATION PLAN 2015 -2030 • MAKE PROJECTS • REVENUE PROJECTS 59
OUR CONTACT DETAILS AT IHQ MOD (N) THE COMMODORE(INDIGENISATION), DIRECTORATE OF INDIGENISATION INTEGRATED HEADQUARTERS OF MINISTRY OF DEFENCE (NAVY) 5 TH FLOOR, CHANAKYA BHAWAN CHANAKYA PURI, NEW DELHI-110021 TEL: 011 -24108377, FAX: 011 -24122689, EMAIL: doi-navy@nic. in AT WESTERN NAVAL COMMAND THE OFFICER-IN-CHARGE, INDIGENISATION UNIT (WEST) C/O FLEET MAIL OFFICE, MUMBAI-400001 TEL: 022 -22751955, FAX: 022 -22751954, EMAIL: wnciuw-navy@nic. in AT EASTERN NAVAL COMMAND THE OFFICER-IN-CHARGE, INDIGENISATION UNIT (EAST) NEAR ST JOSEPH HIGH SCHOOL, RK PURAM MALKAPURAM POST, VISAKHAPATNAM-530011 TEL: 0891 -2519179, FAX: 0891 -2751638, EMAIL: enciuw-navy@nic. in 60
THANK YOU
- Problem of leasing
- Indian plastic industry analysis
- Tack för att ni har lyssnat
- Personlig tidbok
- Rutin för avvikelsehantering
- Vad är vanlig celldelning
- Lågenergihus nyproduktion
- Rbk fuktmätning
- Kontinuitetshantering
- Myndigheten för delaktighet
- Presentera för publik crossboss
- Kung dog 1611
- Tobinskatten för och nackdelar
- Tack för att ni har lyssnat
- Stig kerman
- Referat mall
- Stig karttecken
- Epiteltyper
- Shingelfrisyren
- Vätsketryck formel
- Större och mindre tecken
- Elektronik för barn
- Borra hål för knoppar
- Mat för idrottare
- Sura för anatom
- Smärtskolan kunskap för livet
- Bris för vuxna
- Teckenspråk minoritetsspråk argument
- Novell typiska drag
- Frgar
- Delegerande ledarstil
- Ellika andolf
- Steg för steg rita
- Blomman för dagen drog
- Redogör för vad psykologi är
- Mall för debattartikel
- Lek med former i förskolan
- Claes martinsson
- En lathund för arbete med kontinuitetshantering
- Ledarskapsteorier
- Offentlig förvaltning
- Dikt i bunden form
- Mantel för kvinnor i antikens rom
- Vilken grundregel finns det för tronföljden i sverige?
- Förklara densitet för barn
- Ministerstyre för och nackdelar
- Big brother rösta
- Vem räknas som jude
- Nationell inriktning för artificiell intelligens
- Tillitsbaserad ledning
- Nyckelkompetenser för livslångt lärande
- Romarriket tidslinje
- Ledningssystem för verksamhetsinformation
- Mästar lärling modellen
- Matematisk modellering eksempel
- Särskild löneskatt för pensionskostnader
- Verktyg för automatisering av utbetalningar
- Shaktismen
- Centrum för kunskap och säkerhet
- Inköpsprocessen steg för steg
- Kolopskopi
- Urban torhamn