ILO meeting #40 Ongoing & Forthcoming Calls 10 th July 2018 - Cadarache 1
Magnets Action Signature Type of contract Magnets Contract signature for Transportation of TF Coils from Manufacturer to ITER Q 4 PServ Release of Option for Additional Working Shift. Standard Effective Working Hours/Number of Workers in 2019 Q 4 Option Task Order Signed for Extension of 2 nd Inspector for PF Coils Manufacturing in Cadarache Q 1 SC-PServ Task Order Signed for Inspection Services for TF Coils Insertion and Cold Test. Resident Inspector for SIMIC Q 1 SC-PServ Task Order TO 29. 1 Signed for Inspector to Follow-up the Plan B PC Rings Manufacturing Contract Q 2 SC-PServ TBD (DAHER contract may be used) F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 2
Magnets Pre-Compression Rings • OPE-0345 – PCR Standard technology 4 th slice of the 1 st operational PCR completed, bonding qualification on-going. • OPE-0781 – PCR Alternate pultrusion technology 2 mock-ups UTS* successfully tested, 1 stress-relaxation successfully passed. Option for 3 additional rings internally launched. *UTS = Ultimate Tensile test F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 3
Magnets PFC Manufacturing • Dummy DP impregnation for PF 5 completed and MRR passed successfully. • Series Production of the DPs winding is well underway • PF 5 (3 wound, 2 in preparation for impregnation) • PF 6 (7 wound, 4 impregnated, 1 under impregnation • Assembly of final tool Gantry Crane completed • Dummy DP Impregnation and sectioning completed for PF 6 (ASIPP in China). F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 4
Magnets TFC Manufacturing • OPE-355 Radial Plates Delivered. Contract 99% closed. • OPE-053 WP Production slowed down to match delay in delivery of TFCS by JA-DA Delivery of 2 WPs completed 100% • OPE-414 Coils insertion Cold Test Thermal Cycle of 1 st WP completed. Discussions on going to update the baseline schedule, based on inputs from JA-DA Coil Case delivery schedule. F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 5
Vacuum Vessel SC-PServ Q 3 SC-PServ Commitment and Task Order Signed - TO #23 for 1 VV Resident Inspectors Q 3 SC-PServ Commitment and Task Order Signed - TO #25 for 1 VV Resident Inspectors Q 1 SC-PServ Commitment and Task Order Signed - TO #29 for 1 VV Resident Inspectors Q 4 SC-PServ Commitment and Task Order Signed - TO #31 for 1 VV Resident Inspectors Q 1 PServ Commitment for Contract for Transportation frame for sectors delivery Q 2 2019 PSupply Market Survey on-going Q 3 2018 Vacuum Vessel Commitment and Task Order Signed - TO #21 for 1 VV Resident Inspectors Q 2 Commitment and Task Order Signed - TO #22 for 1 VV Resident Inspectors F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 6
Vacuum Vessel Progress achievement VV Sector 5 VV Sector 4 VV Sector 3 VV Sector 2 VV Sector 9 E. Tada, IO-ILO Meeting 06/18 58% 50% 26% 15% 11% KO-DA VV Sector 6 81% VV PT 07/18 60% 56% 49% 43% 41% F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 7
In Vessel-Blanket PSupply Q 2 PSupply OPE-443 -01 Option I Be armour for manufacturing of mock-ups without SS pipes Q 2 Option OPE-443 -03 Option I Be armour for manufacturing of mock-ups without SS pipes Q 2 Option Contract for phase 1 First Wall series fabrication (in view of industrial organization) Q 3 PSupply TO 02 OPE-319 -01 High Heat Flux Testing of FW full scale-prototype n. 2 Q 1 SC-PServ TO 03 OPE-319 -01 High Heat Flux Testing of FW full scale-prototype n. 3 Q 1 SC-PServ Task Order for Inner Vertical Target Inspectors Q 3 SC-PServ In Vessel- Divertor Development of the Tube to Tube Transition and Fabrication of PFU with New W Grade Q 4 PServ Task Order for Inspectors 2019 – Inner Vertical Target Q 3 SC-PServ Task Order for Resources 2019 - Cassette Q 1 SC-PServ In Vessel- Blanket and Divertor Testing Facility_Flat Rate for 2020 Q 4 Blanket and Divertor Testing Facility_Flat Rate for Jul-Dec 2019 F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 8
In Vessel-Blanket Under evaluation • OPE-0893: Proof of Principles Testing of First wall Tile Repair Techniques (deadline: 18/04/2018). • OMF-0916: High Heat Flux tests of First Wall components (Worldwide; deadline to submit: 07/05/2018). F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 9
In Vessel-Divertor Under preparation • Nothing F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 10
Remote Handling SC-PServ Q 1 SC-PSupply Task Order Signed for Final Design Phase 1 for IVVS Q 3 SC-PSupply Task Order Signed for Final Design Preparatory Activities for In Vessel Viewing System Q 2 SC-PSupply Task Order Signed for Final Design priority items for CPRHS Q 4 SC-PSupply Task Order TO#05 signed for Preliminary Design, first design review and test bench mfg for NBRHS Q 1 SC-PServ Task Order TO#06 signed for Final Design of Monorail Crane, Preliminary Design of Vessel Opening System for NBRHS Q 4 SC-PSupply Remote Handling Task Order signed for GENROBOT Update Phase 2 Q 2 Task Order Signed for Final Design Phase 1 for DRHS F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 11
Remote Handling • OMF-0340 -01: Divertor RHS Specific Contract #3 PD Phase 2, on-going. PDR target date December 2018. • OMF-0340 -03: Neutral Beam RHS Specific Contract #3 PD Phase 2, on-going, Specific Contract #4 Pipe tooling design under final stage of preparation • OMF-0577 -01: Cask & Plug RHS Specific Contract #2 PD on-going • OMF-0633 -01: Engineering support Specific Contract #6 on-going for Support to RHPT Proc Follow-up Phase 2. Specific Contract #7 on-going for Test Bench Validation for Bi. SS I/O Proto Specific Contract #8 on-going for IVVS Design studies task Specific Contract #9 on-going for Development/Assessment of a Rad. Hard Image Sensor Prototype F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 12
Cryoplant & Fuel cycle PServ market survey done Q 3 PServ MITICA Cryopump Installation tool Q 1 PSupply Provision of Gases for Commissioning Q 3 PSupply Cryoplant and Fuel Cycle Contract Signed for Call for tender for Torus and Cryostat Cryopumps Q 4 PSupply Contract Signed for I&C and software design Q 2 Contract Signed for Provision of logistics for test & Commissioning of LN 2 Plant & Auxiliary Syst. F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 13
Cryoplant & Fuel cycle Awarded (and signed) • OPE-0843: Final design of the FECDS and supply of Torus and cryostat CVBs+ Warm regeneration Box. (deadline final tender 17 th April) to Research Instruments (Germany). Under evaluation • OPE-0888: Johnston Couplings and cryojumpers for ITER Cryostat and Torus. Pre production cryopump (Research Instrument) Under preparation • Torus & Cryostat Cryopumps (8 units). Market survey done. Target PA: October 2018. CFT afterward. • Primary Leak Detection and Localization System PA: market survey done. Target PA: end of 2018; CFT afterward. F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 14
Antenna and Plasma Engineering Open, no MS TBD PServ Cancelled Only series prduction FWC Nego with VAT Nego with Diamond materials TBD Q 3 SC-PServ Task Order Signed for Design of ATLIS & Transition frame for the ICH Antenna - Part 2 TO 08 Q 2 SC-PServ Task Order Signed for Development of EC Instrumentation for ITER Q 2 SC-PSupply Task Order Signed for Neutronic, mechanical and RF analysis of the ICH Antenna Q 1 SC-PServ Task Order Signed for Procurement and testing of Feedthrough prototypes Q 1 SC-PSupply Task Order Signed for Procurement of Mirrors and Steering Mechanism prototypes Q 2 SC-PSupply Task Order Signed for Testing of Diamond Disks for EC Windows Q 2 SC-PServ Task Order Signed for Testing of EC Window prototypes Q 1 SC-PServ Task Order Signed for Testing of Window and Valve prototypes Q 1 SC-PServ Task Order Signed for Nuclear safety, analysis and engineering verification Q 3 SC-PServ Antenna and Plasma Engineering Contract Signed for Hardware procurement for EC Plant Control System Stage 2 Q 3 PSupply Contract Signed for Manufacture development and optimisation of Waveguide prototypes for EC Launchers Q 2 PServ Contract Signed for Manufacturing and Testing of ICH RF Window mock-ups and Prototype Q 3 PSupply Contract Signed for Manufacturing and vacuum qualification of EC Isolation Valve prototype Q 3 PSupply Contract signed for Series production of EC Window Diamond Disks Q 2 PSupply Contract Signed for Testing of Hydrogen embrittlement of Ti-SS joints Q 1 Task Order 1 Signed for In-sourcing for Support to EC UL Series production F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 15
Antenna and Plasma Engineering (1/3) Signed: OPE-772: Manufacturing design of Valve Proto (VAT. Signed. OFC-842: Testing of ITER ECL window – (KIT). Signed OPE-920: Inclusion of NTM model in Jin trac - Signed (CNRIFP) Software development (linked to OPE-541) OFC-484: Design of the ITER ICH Antenna (CYCLE). To be Electron Cyclotron Upper Launcher closed Q 3 2018. OFC-800: Nuclear Engineering Support (NIER) TOs signed one as back-up of Iberdrola withdrawal from fusion activities #1 closed #2 #3 on-going #4 signed #5 task description Ion Cyclotron Antenna F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 16
Antenna and Plasma Engineering (2/3) Under preparation or launched OPE-885: EC Windows Prototype – (Competitive with Nego) Annex B under validation by IO. To be launched Q 3 OPE-729: EC Window Sub-Assembly Prototype Annex B under validation by IO (Diamond Material Gmb. H). To be launched Q 3 OMF-922: ICRH Window manufacturing – Cancelled. Design to be done by IO, only series production under F 4 E scope. Electron Cyclotron Upper Launcher OPE-926: PO for OCEM – Modification of SW BPS in order to include waveform in Falcon facility OFC-671: ECT-FALCON facility Set-Up - TO 2 signed (EPFL, SPC) testing of 20 dummy load and EC instrumentation analysis. TO 3 under preparation. Ion Cyclotron Antenna F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 17
[//018 3: 25 PM] Hoestlandt Laura (F 4 E): EC Upper Launcher BSM and Port Plug Engineering Analysis Antenna and Plasma Engineering (3/3) On-going OPE-776: Corrugated waveguide - release of options done (Tiefbohrbaer), scope amended. OPE-780: Development of Ti-SS rotary friction welding – Contract ongoing (TWI) Technically closed. Electron Cyclotron Upper Launcher OPE-757: Manufacturing of RF Dummy Load for Gyrotron operation at High Power - On-going (CNR) OFC-908: new Manufacturing Support EC launchers (TWI). TO 1 launched OFC- 800: Support Services TO 5 sent, waiting for offer (EC Upper Launcher BSM and Port Plug Engineering Analysis), TO 6 signed (A System Engingeer to Support the Antennas and Plasma Engineering Unit) Ion Cyclotron Antenna F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 18
Neutral Beam and EC Power Supplies and Sources PServ Q 3 SC-PSupply Contract Signed - PRIMA#4 Assembly Q 4 SC-PSupply Release of Additional Options 2019 for the Contract Procurement of Body PS & MHVPS Main Contract Q 4 Option Release of Option 1 - 5 years spare parts for the Contract Procurement of Body Power Supplies & MHVPS Q 4 Option Release of Option 8 - 1 -year extension of warranty - HVD 1 & Bushing of MITICA Q 1 Option Release of the Second Group of Options - SC#1 MITICA Beam Source Q 4 Option Task Order Signed for SC#1 Stage 2 MITICA Beam Line Components Q 3 SC-PSupply Task Order Signed for Services for NBTF Site Supervision and Support - 06 Q 4 SC-PServ Commitment for Budget for NBTF Technical Follow-up 2020 Q 4 Cash Amendment Budget for NBTF Agreement 2019 NOT Credited part Q 3 Cash Neutral Beam and EC Power Supplies and Sources Commitment for Specific Contract - MITICA CODAS 1, Interlock and Safety FW Contract NBTF Control, Interlock and Safety Q 1 SC-PSupply Contract Signed - MITICA Diagnostics Q 3 Contract Signed - PRIMA#3 Assembly F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 19
Neutral Beam and EC Power Supplies and Sources On-going • OMF-0605: Beam source phase 2 with the three initial tenderers (Alsyom, ATT and De Pretto, and Thales) Awarded • OPE-0868: Interpretation of results and evaluation of performance obtained on the European Electron Cyclotron Power Supplies (EU ECPS) procured by Fusion for Energy (under contract F 4 E-OPE-454 with AMPEGON) awarded to EPFL (Swiss Plasma Center). F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 20
Diagnostics Market Survey Responsible MIO Baseline Signed for Preliminary Design CPTS Q 4 SC-PServ Q 4 2018 MDL Commitment for Contract for Procurement and Delivery for Inner-Vessel Sensor Head HF - Lot 2 Q 1 PSupply Q 2 2017 (data reuse) MDL Commitment for Contract for Procurement and Delivery for in-vessel clips, clamps, bosses and critical junction boxes Q 4 PSupply Q 3 2018 ACL Commitment for TO for Irradiation Testing for Bolometer Sensor Prototype & Electrical Connections Q 1 SC-PServ Contract Signed for Final Design of RH Connector and Ancillary Components Q 4 PServ Q 3 2018 ACL Contract Signed for Procurement and Delivery for Inner-Vessel Coils - Sensor Heads LTCC - Lot 1 Q 4 PSupply Q 3 2018 ACL Contract Signed for Procurement and Delivery for PPR Captive Ex-Vessel Transmission Components Q 4 PSupply Q 2 2018 (data reuse) MDL Contract Signed for Procurement and Delivery of In-vessel cabling Q 4 PSupply Q 3 2018 ACL Contract signed for Supplies and Support of CTS Critical Prototypes Q 4 PSupply Maybe FPA MDL Fission Chamber Prototype & Series Production Q 4 PSupply On-going ACL Commitment for Future Activities for in-source personnel under OMF-0871 Q 2 SC-PServ Task Order Signed for Irradiation Testing for Feedthroughs Q 1 SC-PServ Task Order Signed for TO#3 Engineering Analysis Support for DPG Development Q 1 SC-PServ TO signed for Engineering Analysis Thermohydraulic FDR of CTS Q 3 SC-PServ TO signed for Engineering Support in components for passing EC Resonance of CTS Q 3 SC-PServ Contract signed for Single Framework Contract for Services for Design for CPTS Q 4 Fw. C MDL F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 21
Diagnostics (1/3) Awarded: • OPE-0669: Bolometer sensor prototypes to CSEM (Switzerland) (signed). • OPE-0883: Development and Supply of Software Algorithms for ITER Magnetics Diagnostic ( Award April 2018) to Consorzio CREATE-RFX (about to be signed). Under-evaluation: • OFC-0905: Manufacturing Engineering Support for the Diagnostics Systems (ex F 4 E-OMF-0666) - 8 offers received. • OPE-0852: Supply of Inner Vessel Coils (IVC) Platforms (CFT April 2018). F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 22
Diagnostics (2/3) Under preparation: • OFC-0847: CPTS Preliminary and final Design (2 different task orders) (Target PA: October; CFT afterward). • OPE-0762: MIC cables (Target PA: Q 4; CFT afterward) • OPE-0921: IVC-sensor heads. (Target publication July) • Lot 01: Supply of Low-Temperature Co-fired Ceramic (LTCC) Sensor Heads; • Lot 02: Supply of High-Frequency (HF) Sensor Heads; and • Lot 03: Supply of Diamagnetic Coils. • OPE-09? ? : Fission Chambers (Benoit? ). CFT target Q 3 -Q 4 2018 F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 23
Diagnostics (3/3) Under preparation: • Plasma Position Reflectometers: market survey finished. Target CFT Q 4 2018 (Design + Manufacturing). • Collective Thomson Scattering: market survey finished. Target CFT Q 1 2019 (Design + Manufacturing). Market Surveys On-going: • IR Cameras: Market Survey closed – Market Analysis on-going • CVD Neutron Detectors: closed – Market Analysis on-going Market Surveys Under Preparation: • Clips, clamps and junction boxes for the MIC cables • RH Connector F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 24
Test Blanket Module SC-PServ Q 2 SC-PServ Test Blanket Module Task Order Signed for Preliminary Design of Ancillary Systems phase I Q 2 Task Order Signed for Preliminary Design of TBMs set phase I Task Order Signed for Safety Analyses for TBS PD phase I Under preparation • OFC-0950 (3 lots): 1 lot for Preliminary Design of the TBM set , 1 lot for Preliminary Design for Ancillary System, lot 3: Safety studies and analysis. Target CFT: mid October. F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 25
Site and Buildings and Power Supplies SC-PSupply Q 4 PSupply Site Security and Reception Services for the ITER Site 2019 signed Q 1 SC-PServ TB 12 - Commitment for Option 5. 1 - Supply and Inst. PBS 44 cable trays BLDG in the Baseline Q 3 Option TB 19 - Commitment for Option 2: Diagnostics above L 2 Q 1 Option ITER Site Cooperation Agreement for 2019 Q 4 Cash ITER Site Host Agreement for 2019 Q 2 Cash Site and Buildings and Power Supplies Commitment for TB 11 - Completion works Contract - 2019 Q 1 Contract Signed for TB 18 Contract F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 26
Site and Buildings and Power Supplies On-going • OPE-0688: TB 12 Design & Build of buildings 34, 37, 75, area 30 & 31, PBS 63 -LC 09, 04, 75 (B 75 Safety Related), load centers, & infrastructure works + several options. 2 nd phase started 30 th May: 4 tenderers invited; deadline to offer postponed from 13 th July to 25 th September 2018. • OPE-0754: TB 13 Emergency Power Supplies. D&B buildings B 44, B 45, B 46, and B 47+ Electrical equipment. (Open procedure, deadline postponed from 10 th May to 28 th September 2018). • OPE-0906: TB 19 Painting and Coating For Tokamak Complex. (1 st step 4 th July). ITER site–April 2018 First segment of crown poured- 22 May 2018 F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 27
Supporting Activities (PM, and miscellaneous) Framework Contract for Engineering Support services in Thermo Hydraulics and Fluid Dynamics Q 3 FWC N/A Q 4 FWC N/A Framework Contract for Provision of material characterization at cryogenic temperatures Q 3 FWC Task Order Signed for TO 03 Lot 2 in Support of the MIR layer - DXL Senior/Junior Q 4 SC-PServ Task Order Signed for TO 26. 1 for QA Support Staff QAG Q 3 SC-PServ Task Order Signed for TO 31. 1 for QA Support Staff QAG Q 2 SC-PServ Task Order Signed for TO 32. 1 for QA Support Staff QAG Q 2 SC-PServ Task Order Signed for TO 36. 1 for QA Support Staff QAG Q 3 SC-PServ TO 01. 1 for Fw. C F 4 E-OMF-0895 Lot 2: Risk Management Support Q 4 SC-PServ TO 02. 1 for Fw. C F 4 E-OMF-0895 Lot 2: Risk Management Support Q 4 SC-PServ TO 03 for OMF-0895 Lot 1: Project Performance Management Support - Diagnostics Q 3 SC-PServ TO 04 for OMF-0895 Lot 1: Project Performance Management Support-Technical Support Systems Q 3 SC-PServ TO 05 for OMF-0895 Lot 1: Project Performance Management Support - Antennas Q 4 SC-PServ TO 03 for OMF-0895 Lot 3: Planning Support Vacuum Vessel Q 3 SC-PServ TO 04 for OMF-0895 Lot 3: Planning Support Neutral Beams Q 3 SC-PServ TO 05 for OMF-0895 Lot 3: Planning Support BIPS Q 4 SC-PServ TO 06 for OMF-0895 Lot 3: Planning Support Configuration Q 3 SC-PServ TO for Transportation Management fees 2020 Q 4 SC-PServ Framework Contract for Seismic analysis and design of building and mechanical components of the ITER facility Framework Contract for Provision of System, Instrumentation and Control Engineering - support for conventional I&C systems Market Survey Supporting Activities F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 28
Supporting Activities (PM, and miscellaneous) Under preparation: • OMF-0937: QA Inspectors (extension from OMF-0789) – Q 4 2018 • OFC-0942: Nuclear Safety (most probably with ASN-IRSN-ENSTTI) – Q 3 2018 Under evaluation: • OMF-0895: Project Management services (3 lots) • OPE-0834: LSU - Spanish Law Firms – 7 offers Awarded: • OMF-0789: Quality Assurance and Surveillance Support inspectors for Protection Important Components of the ITER project – 3 lots (to APAVE, ASAP, COFREND, CEIDRE/EDF, Bureau Veritas, Hartford Steam Boiler Inspection Quality Ltd, AIB-VINCOTTE. F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 29
Supporting Activities (Technical Support) Under preparation: • OMF-0938: Electromagnetic Analysis – Q 3 2018 • OMF-0882: Nuclear Analysis Support (Analysis & Codes) – On Hold – Q 4 2018 Awarded: • OFC-0825: Mechanical Analysis – 2 lots • Lot 1: Advanced Mechanical Engineering Design Analysis - IDOM Consulting (ES) • Lot 2: General Mechanical Analysis - IDOM Consulting (ES) • OMF-0878: Metrology Support Services • Rank 1: SETIS (FR) • Rank 2: AXIST (IT) • OFC-0884: Multilink Inspection Tool to Fundacion Tekniker (ES) F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 30
Broader Approach Architecture of integration platform for BA Phase II Q 4 PServ Contract signed for Engineering support for installation in Rokkasho 2019 Q 4 PServ Future contract for Materials and components for LIPAC installation 2019 Q 4 PSupply Health and safety for operations on site JT-60 SA Q 3 SC-PServ Remote handling preliminary studies and R&D Q 1 PServ Support of design of cryopumps Q 1 PServ Contract for Engineering activities in support of enhanced TF coil performance Q 1 PServ TO 02 for Engineering and research and development support for JT-60 SA commissioning Q 1 SC-PServ TO 03 for Engineering and research and development support for JT-60 SA commissioning Q 2 SC-PServ TO 04 for Engineering and research and development support for JT-60 SA commissioning Q 3 SC-PServ TO 05 for Engineering and research and development support for JT-60 SA commissioning Q 4 SC-PServ Contract for Equilibrium Field coils PS spare parts Q 1 PSupply Contract signed for cryoplant spare/replacement parts Part 2 Q 2 PSupply Contract signed for Enhancements for injector components Q 2 PSupply Contract signed for JT-60 SA Cryopump Design and Manufacturing part 1 Q 3 PSupply Contract signed for JT-60 SA Divertor VUV spectrometer part 1 Q 3 PSupply Contract signed for JT-60 SA Fast Ion Loss Detector part 1 Q 3 PSupply Contract signed for JT-60 SA Pellet Injector Design and Manufacturing part 1 Q 3 PSupply Contract signed for JT-60 SA YAG Thomson scattering system part 1 Q 3 PSupply Contractual activities for On site assistance from PS suppliers Q 1 PServ Engineering support for diagnostics Q 2 PServ F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 31
Broader Approach (1/2) Awarded • OPE-0928: Nut Retention Plate Installation ( Accelerated procedure) to NIPPON ADVANCED TECHNOLOGY CO. , LTD Under evaluation • OPE-0909: Beam Dump Ionization Chambers, • OPE-0910: HEBT-High Energy Beam Transport Line Cryo System, • OPE-0923: Cables and Feedthroughs, F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 32
Broader Approach (2/2) On-going • OPE-0892: IFMIF cryomodule flexible connectors (OPE-0838 cancelled then negotiated with Spinner). • OPE-0911: LIPAC (High Speed Digitizers and Control of the BEAM position)- Deadline 31 st July (Open). Under preparation • OPE-0943: HEBT (High Energy Beam Transport Line) secondary electrical board. (French and Italian potential tenderers identified). Open, target CFT: end of July). F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 33
Thank you F 4 E Market Intelligence Group - ILO Meeting #40 – 10 th July 2018 – Cadarache 34
- Forthcoming results
- Ongoing or on-going
- Ongoing professional practice evaluation template
- Stages in consumer decision making process
- Nursing process
- Brigance readiness activities
- Understanding the management process
- On-going assessment
- Herbie the goal
- Usoap s hat
- Present continuous definition
- The goal: a process of ongoing improvement
- Construction work ongoing
- Nursing process steps
- Types of meeting
- Proposal kickoff meeting agenda
- For todays meeting
- What is meeting and types of meeting
- Supervisory mechanism of ilo
- Eiip
- Ilo torino
- Objectives of ilo
- Functions of ilo
- 4 pillars of decent work
- Chifa royal ilo
- Ilo social protection
- International training center of the ilo
- Ilo brand hub
- Iloosh
- Ilo 138
- Function of ilo
- Structure of ilo
- Siyb training modules
- Centro internazionale di formazione dell'ilo
- Ilo